HomeMy WebLinkAbout2011 RESULTS IIIIIIIIIIIfIIIIIIII 17
SWRCB,January 2002 IE Page of
Secondary Containment Testing Report Form
This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the
appropriate pages of this form to report results for all components tested The completed form,written test procedures, and
printouts from tests(f applicable),should be provided to the facility owner/operator for submittal to the local regulatory agency.
1. FACILITY INFORMATION
Facility Name: Fastrip#360 Date of Testing: 2/22/11
Facility Address: 6401 White Ln.Bakersfield,CA
Facility Contact: Jaco Hill I Phone: 1-661-393-7000
Date Local Agency Was Notified of Testing: 2/16/11
Name of Local Agency Inspector(rf present during testing):
2. TESTING CONTRACTOR INFORMATION
Company Name: Sunset Mechanical
Technician Conducting Test: Scott Olinger
Credentials: ❑CSLB Licensed Contractor ❑SWRCB Licensed Tank Tester
License Type: C-36 C-10 License Number: 589517
Manufacturer Trainine
Manufacturer Component(s) Date Training Expires
Incon TS-STS INSPECTION EQUIPMENT 1/18/13
VEEDER ROOT MONITORING SYSTEM 1/15/12
ICC CAL UST SERVICE TECH 1/18/13
3. SUNUA"Y OF TEST RESULTS
Not Repairs Not Repairs
Component Pass Fail Tested Made Component Pass Fail Tested Made
UDC:9 1-2 x PIPING RUN 41 X
UDC#3-4 X PIPING RUN#2 X
UDC#5-6 X PIPING RUN#3 X
UDC#7-8 X PIPING RUN#4 X
STP#1 X PIPING RUN#5 X
STP#2 X PIPING RUN#6 X
STP#3 X PIPING RUN#7 X
FILL#1 X
FILL#2 X
FILL#3 X
If hydrostatic testing was performed,describe what was done with the water after completion of tests:
CERTIFICATION OF MHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
To the best of my knowledg are accurate and in full compliance with legal requirements
Technician's Signature IIIIIII 18 Date: 2-22-11
I IIIIIII II 1
I
SWRCB,January 2002 Page of
4. TANK ANNULAR TESTING
Test Method Developed By: ❑Tank Manufacturer ❑Industry Standard ❑Professional Engineer
❑Other(Spec)
Test Method Used: ❑Pressure ❑Vacuum ❑Hydrostatic
❑Other(Spec)
Test Equipment Used:4"Gauge with Certs Equipment Resolution: 0-30
Tank#1 Tank#2 Tank#3
Is Tank Exempt From Testing?' Yes ❑No es ❑No Yes ❑No ❑Yes ❑No
Tank Capacity:
Tank Material:
Tank Manufacturer.
Product Stored:
Wait time between applying
pressure/vacuum/water and
starting test:
Test Start Time:
Initial Reading(R):
Test End Time:
Final Reading(RF):
Test Duration:
Change in Reading(RF-RO:
Pass/Fail Threshold or Criteria:
Test Result: ❑ Pass ❑Fail ❑ Pass., .❑Fail 0.Pass ❑Fail O--Pass ❑Fail
Was sensor removed for testing? ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA
Was sensor properly replaced and
verified functional after testin ? ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA
Comments—(include information on repairs made prior to testing; and recommended follow-up for failed tests)
` Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary
containment,such as systems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment
testing. {California Code of Regulations,Title 23,Section 2637(a)(6))
S WRCB,January 2002 Page of
5. SECONDARY PIPE TESTING
Test Method Developed By: Piping Manufacturer ❑Industry Standard ❑Professional Engineer
❑Mer(Specify)
Test Method Used: Pressure ❑Vacuum ❑Hydrostatic
❑Other(Specify)
Test Equipment Used:4"Gel Filled Gauge W/Certs Equipment Resolution: 0-15
3
M Piping Run#1 Piping Run#2 Piping Run#3 Piping Run#4
Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass
Piping Manufacturer. AO Smith AO Smith AO Smith AO Smith
Piping Diameter. 3" 3" 3" 34'
Length of Piping Run: 100' 110' 120' 140'
Product Stored: UNL PREM DIESEL VAPOR
Method and location of Test Boot at UDC& Test Boot at UDC& Test Boot at UDC& Test Boot at UDC&
piping-run isolation: STP STP STP STP
Wait time between applying
pressure/vacuum/water and 15 Min 15 Min 15 Min 15 Min
starting test:
Test Start Time: 9:15 am 9:15 am 9:15 am 9:15 am
Initial Reading(Rj): 5.1 5.2 5.1 5.1
Test End Time: 10:15 am 10:15 am 10:15 am 10:15 am
Final Reading(RF): 5.1 5.2 5.1 5.1
Test Duration: 1 Hour 1 Hour I Hour 1 Hour
Change in Reading(RF-R,): 0 0 0 0
Pass/Fail Threshold or 0 0 0 0
Criteria:
:Test`Result: - Pass.'. `❑Fail Pass '❑Fail Pass;," ❑Fail;. B�Pass ❑,Fail, .
Contments—(mdude information on repairs made prior to testing; and recommended follow-up for failed tests)
SWRCB,January 2002 Page of
5. SECONDARY PIPE TESTING
Test Method Developed By: Rf Piping Manufacturer ❑Industry Standard ❑Professional Engineer
❑ er(Spec)
Test Method Used: 9Pressure ❑Vacuum ❑Hydrostatic
❑Other(Spec)
Test Equipment Used:4"Gel Filled Gauge W/Certs Equipment Resolution: 0-15
+' Piping Run#5 Piping Run#6 Piping Run#7 Piping Run#4
Piping Material: Fiberglass Fiberglass Fiberglass
Piping Manufacturer: AO Smith AO Smith AO Smith
Piping Diameter: 3" 3" 3"
Length of Piping Run: 70' 80' 160'
Product Stored: UNL PREM DIESEL
Method and location of Test Boot at sump& Test Boot at sump& Test Boot at sump&
piping-run isolation: vent vent vent
Wait time between applying
pressurelvacuum/water and 10 Min 10 Min 10 Min
starting test:
Test Start Time: 12:30 12:30 12:30
Initial Reading(R4): 5.2 5.1 5.1
Test End Time: 1:30 1:30 1:30
Final Reading(RF): 52 5.1 5.1
Test Duration: 1 Hour 1 Hour 1 Hour
Change in Reading(RF-R,): 0 0 0
Pass/Fail Threshold or 0 0 0
Criteria:
Test.Resnit: Pass ..O Fail Pass_: ❑Fail,` Pass:,:_0 Fail 0.;Pass :F,a� s:.
Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests)
SWRCB,January 2002 Page of
6. PIPING SUMP TESTING
Test Method Developed By: Sump Manufacturer ❑Industry Standard ❑Professional Engineer
❑Other(Spec)
Test Method Used: ❑Pressure ❑Vacuum 16 Hydrostatic
❑Other(Spec)
Test Equipment Used: Incon TS-STS Equipment Resolution: 0.0000
Sump#1 STP Sump#2 STP Sump#3 STP Sump#
Sump Diameter. 48" 48" 48"
Sump Depth: 66" 68" 64"
Sump Material: Fiberglass Fiberglass Fiberglass
Height from Tank Top to Top of 16" 24" 18"
Highest Piping Penetration:
Height from Tank Top to Lowest 23" 24" 22"
Electrical Penetration:
Condition of sump prior to testing: DRY DRY DRY
Portion of Sump Tested' 20" 26" 20"
Does turbine shut down when / f
sump sensor detects liquid(both 1(Yes ❑No ❑NA ®Yes ❑No ❑NA Yes ❑No ❑NA ❑Yes ❑No ❑NA
product and water)?*
Turbine shutdown response time 20 Sec 20 Sec 20 Sec
Is system programmed for fail-safe
shutdown?* �}'� 11 No ❑NA L�'
1�!!
Yes ❑No ❑NA 94s ❑No ❑NA ❑Yes ❑No ❑NA
Was fail-safe verified to be 9(Yes ❑No ❑NA As ❑No ❑NA Yes ❑No ❑NA ❑Yes ❑No ❑NA
OP erational?*
Wait time between applying
pressure/vacuum/water and starting 10 Min 10 Min 10 Min
test:
Test Start Time: 10:47 10:47 10:47
Initial Reading(RO: 3.4989 6.0423 5.9227
Test End Time: 11:02 11:02 11:02
Final Reading(RF): 3.4977 6.0420 5.9223
Test Duration: 15 MIN 15 MIN 15 MIN
Change in Reading(RF-RO: .0012 .0003 .0004
Pass/Fail Threshold or Criteria: .002 .002 .002
Test Result Pass, ;❑:Fail Piss"'t Feil pass Fail ❑ Pass ❑Fail,.
Was sensor removed for testing? Yes ❑No ❑NA Ves ❑No ❑NA es ❑No ❑NA ❑Yes ❑No ❑NA
Was sensor properly replaced and Yes ❑No ❑NA Yes ❑No ❑NA Yes ❑No ❑NA ❑Yes ❑No ❑
verified functional after NA
testis ?
Comments—(include information on repairs made prior to testing, and recommended follow-up for,6 fled tests
'If the entire depth of the sump is not tested,specify how much was tested. If the answer to gBy of the questions indicated with an
asterisk(')is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160)
SWRCB,January 2002 Page of
7. UND R DISPENSER CONTAINMENT M9 TESTING
Test Method Developed By: Pf UDC Manufacturer ❑Industry Standard ❑Professional Engineer
❑Other(Spec)
Test Method Used: D Pressure ❑Vacuum WHydrostatic
0 Other(Spec)
Test Equipment Used: INCON TS-STS Equipment Resolution:0.0000
-2 -6 -8 UDC#1 C 4
UDC Manufacturer. Westem Western Western Western
UDC Material: Fiberglass Fiberglass Fiberglass Fiberglass
UDC Depth: 34" 35" 33" 34"
Height from UDC Bottom to Top 10" 10" 9" 9"
of Highest Piping Penetration:
Height from UDC Bottom to 15" 12" 15" 11"
Lowest Electrical Penetration:
Condition of UDC prior to DRY DRY DRY DRY
testing:
Portion of UDC Tested 12" 12" 12" 12"
Does turbine shut down when /
UDC sensor detects liquid(both 0/Yes ❑No ❑NA E(Yes D No ❑NA EVYes D No ❑NA elYes ❑No ❑NA
product and water)?*
Turbine shutdown response time 20 SEC 20 SEC 20 SEC 20 SEC
Is system programmed for fail- yes ❑No ❑NA es D No ❑NA C4es D No ❑NA O/Yes ❑No ❑NA
safe shutdown?
Was fail-safe verified to be
operational?* Yes D No 0 NA Yes 0 N ❑NA MTYes 0 No ❑NA es 0 N ❑NA
Wait time between applying 15 Min 15 Min 15 Min 15 Min
pressure/vacuum/water and
starting test
Test Start Time: 8:50 8:50 8:50 8:50
Initial Reading(R{): 3.6005 5.1581 3.2072 4.5246
Test End Time: 9:05 9:05 9:05 9:05
Final Reading(RF): 3.6003 5.1572 3.2069 4.5251
Test Duration: 15 Min 15 Min 15 Min 15 Min
Change in Reading(RF-Ri): .0002 .0009 .0003 .0005
Pass/Fail Threshold or Criteria: 002 .002 .002 .002
Test Result: :Pass ❑Fail -Pass [7 Fail. Pass 0 Fail Pass: ❑
Fail..::
Was sensor removed for testing? Yes ❑No ❑NA Yes ❑No DNA eYes ❑No DNA 21 Y ❑No DNA
Was sensor properly replaced and PJ Yes ❑No ❑NA ((Yes ❑No ❑NA � dYes D No ❑NA Yes ❑No ❑NA
verified functional after testing?
Comments--(include information on repairs made prior lo testing, and recommended follow-up for failed tests)
'If the entire depth of the UDC is not tested,specify how much was tested If the answer to any of the questions indicated with an
asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160)
SWRCB,January 2002 Page of
8. FILL RISER CONTAINMENT SUMP TESTING
Facility is Not Equipped With Fill Riser Containment Sums ❑
Fill Riser Containment Sumps are Prese t,but were Not Tested ❑
Test Method Developed By: Rf Sump Manufacturer ❑Industry Standard ❑Professional Engineer
❑Other(Spec)
Test Method Used: ❑Pressure ❑Vacuum Hydrostatic
❑Other(Spec)
Test Equipment Used: INCON TS-STS Equipment Resolution: 0.0000
'��t F"%' -..a. w• a� ,. -.+.atw. -�-.aan:-s-.�v.i :r,- - e. :m. ma. - z�.y: �c•.o. ....
Fill Sump#1 Fill Sump#2 Fill Sume#3 Fill Sump#4
Sump Diameter: 48" 48" 48" 42"
Sump Depth: 71" 72" 68" 72"
Height from Tank Top to Top of 13" 13" 13" 12"
Highest Piping Penetration:
Height from Tank Top to Lowest 15" 18" 16" 12"
Electrical Penetration:
Condition of sump prior to DRY DRY DRY DRY
testing:
Portion of Sump Tested 16" 16" 16" 14"
Sump Material: Fiberglass Fiberglass Fiberglass Fiberglass
Wait time between applying 15 Min 15 Min 15 Min 10 Min
pressure/vacuum/water and
starting test:
Test Start Time: 12:03 12:03 1:04 12:17
Initial Reading O: 5.5504 52784 3.5355 5.0244
Test End Time: 12:18 12:18 1:19 12:32
Final Reading(RF): 5.5504 5.2771 3.5361 5.0244
Test Duration: 15 Min 15 Min 15 Min 15 Min
Chan a in Reading(RF-R): 0 .0013 .0006 0
Pass/Fail Threshold or Criteria: .002 .002 .002 .002
Test;Resulft ass '.:❑Fail ss 0•Fail : _ Pass ❑Fail. ❑_ Pass.: Fail:,*.
Is there a sensor in the sump? 9Yes ❑No Yes ❑No es ❑No ❑Yes ❑No
Does the sensor alarm when / /
either product or water is dyes ❑No ❑NA As ❑No ❑NA As ❑No ❑NA ❑Yes ❑No ❑NA
detected?
Was sensor removed for testing? es ❑No ❑NA es ❑No ❑NA es ❑No ❑NA ❑Yes ❑No ❑NA
Was sensor properly replaced and Yes ❑No ❑NA WY//es ❑No ❑NA Yes ❑No ❑NA ❑Yes ❑No ❑NA
verified fractional after testing?
Comments—('include information on repairs made prior to testing, and recommended follow-up for failed tests)
0-1 4 C,4 c
CD r�r .5 t
m LLI
CD (0
Ci Ctf \ 2(,,q
<r- N CD to
IN r— N (0,
p CS) 1�
CS) -4
a.4r
Cry W CL
X 0" CP Lr;
L,-'tj C, en C-:� W,
CC L 41 L: L, _j 6' IT L. L..� 0� WHTT7 11
1 -.1 CL 6401.
C�
U., IT V w cr t 171• v7•LLJ fC F F- LU
co Of Z Lj e-_j ::j
: V) w S�j s
L,� �, Ce �-- J- I —
,j'T LLI CO
Uj -j :?m 2. x I I-- Lj 2 =>L-;Lj
F-EI. V, z 1- b., V.CO (,,-, -•CA L� W. w �Iri lv
Z
!�;I)MP 1-7AK TE—A REFORT >
LL y il Lo
c7c;7
W I,
ki
FO
Ex 7
0.
r- 7 G tPP-M,
T
p.ESI_
z (M Ld
�q �,-
Y)
i, D 'CIL-
r-, CO
'T
CK CL
C-� *1% L�-� -V c 1)
04 'j; iT I
0 Ui
co .71
V-- 02/2V:M-
C',
V.
1!Z ., — L�; ffE OLD
LI, . I a J,., 0, f Q 0- M
Ir! — L-� T
IL C: :6:- 5, U. w F-q
U Li V- LJ 4z Ld 4r 1-1 F- S, FEL
UJ U' F- 4T I.-
L:•. Lj F- CC* _j L,,�UJ
1j: Lj_ Ck�
ct: 1(0--" !�-,
Ld C; w -ST S T
a. CC :;L C7, =1- t; I--��, L,i T A R
('-., r a.I--C;i 7!- EA "Lz
CO C -J 43 o,
CO C'. 5T�RTED
L%
n LLJ CL
rf :;-, t� EG N LEU
U. THRE94OLD 0.102 IN
FAILED
RESULT
12:21 Pt",
ARTED
2?�
T��--;T STARTED
S .4
5.
.31N LE01
E:11D TIME 12:37 FM
02/22/2011
GATE
-ND LEIJFi a 6M5 114
K THRESHOLD 0.002 1
cr "T RESULT 'AILED
,
CL. F
ou-1 W,
Lj-
cQ 'CO
CO
C'
b4�7.i 4JH:;1 c Lrii•iL
?A. r'T _D ;F
SUNSET MMC:T
fa84-E.Z6
1":43_1 ri r
PI I
�?43� WHITE C LANE .. _ -Y
�=;i jM _7 A1. PEST ZEPCRT c ~`F F� 7 k 4J�� t j
cu CnNST 6431
ri°kE; r Lei_
FILL 1 ^-cr_ 4_S2AF cc1P4a � %ir'' ,
7 ',T ^TART[.) 12:Z Phi 22 f2F1i; 11:20 op,
T STARTED 02/242x20411 -
r�'Ir" ' .a3 J ) ( c.�, <.jprjjT t1iF f_'�n4;
TIME 12:37 PJw STP 1 STF
_ _ 0
M1 A r•
:. D , TF 222220 ^cT '" I cn2i2tf 11
LEVEL 0.0000 IN STAR TaRrr?��� �.��^4�hh
c TEC'
_^A�{ T!IFE:,SpLS 0.002 1N �r.y F rIJ�: 2k11i TSi'IE ,>iI2S2H 1
RESULT PASSED TihiE i,497d I�! }'tdD [,RTE z 4,9,64 rl
11.19 fit,
LE4JE L rd
=11�72r�q(1 ; -=i''
! 7.4, '=':t�! •-�.496,; -I - �1
IFY �T REBE L'
RESULT `S.ra2D b.OV IH
STARTED
12,2 i Phi POSED
T? 2
LEUELT 5.2749 IN PTP 7
E STARrLC
END T_ 12:31 ph :TRRTEG rr,T .3TARTFa. Q41 1ti
ATE 02i22/201 i - r i i:34 iN-LF-U-L 2 r<
THRESHOLD 5.727 IN 1 LEtic TART- 01/'3/1911 �'i}D IitE �
3.00E ir, 6.3419 Dr�TE 6,0418 IN
?r r '7F^,f r} 7 rrq� I� _l lr"L n
PflSSfp )ATE li:1q Ah! E}Gf r_ E�C�r It+
EBHGLC, 0' g
02/22Z20-11 rc4T Rr!=:31 !�SBL
F11 1 3 T b HRESHL�L D 0418 Itv
N
Trrc'T Pc e 'a'1132
T7T ^.T"R' 12:21 J(i_T "OFD 6-TF J
STARTED 0.2/ '.'2311
3FrTl•4 !-T!.JEL 5.1972 IN STF rT�9T[F� 11 34 Al
TIh1EF 12:37 Phi STRRTEE) 02/22/2011
Egan DATr- 02/222811. ,EST STA7 . S,;vz IN
EUEL 5.6681, IN START 11:04 At9 F� 11:1`3 tiPi
RESULT 1aF�H1LD 0,0T IN Ih1E Y Trq
STARTED °�922°11 cP1� !�?i l _
FAILED �, 11:19 Iy __._EVEL- _- �.9 f N.
EUEL --'AT B2i Ahi -a.. T_cc }[1:D .f!.Afl2 IN
aL' PASSED
5.9221 IN ;T RES!JLT
lP2Ll- 1 RESULT + 401 2N ------.
�t-
LT
STARTED 12:21 PM PASSED --
rrn*r !`Tri-� I r,122/7C,11
IN LEVEL 5.7371 IN
—:,!D TT7F 1t:17?11 ..-. ....
MTE 02/22/2011
LIM IM
THRESHOLD 0.002 IN
Tr-qT RF^f it_T FAf LID
_0
-i 7S;• Q - r-, u, t
V;7]z:-1`-f °_; - r' '_I-i:?-+• .. h�
!-M
f'--� !: •. j,� :.7 _r} -{.7 r-
7 ITl I'•1 .a t7 r j i"1s L ',) �t ,7 TI .y -7 U7 .,t - ,fj " ..z-_-�
.z I.7-A�-1 �i -1 -'TJ--� '-• ,-ry 2.;- s��� � C - - j 'a
r-u ..11 TI > r- `)'-).-.;TI ,� a,c. f-": '1 l i'i -tl rl > '
,- - �,� -
Ui tr
r l•-I 4 Q1=^ R) t.)`CD h-) h? �Ul lvJ h.)to - i 1 {'7 r- --1-i
5l mJI N.-- F] -• to�-- LTj'• ni r�rJ
Q tJ L1?r,j" �4 �y "r N Ql T�'1 R3 "O 1�)'yV h?_ CL r.� -Aw w.... ?
F r�. .--e W >-..,, 6j 65 a-I '� i,7�>-,6} -(7*' .'3'J U7 'T_
1-7 rl
6491 WHITE LAME ASTRIP
MA!ERSFIc.LD CA 6401 WHIT=LANE
SUNSt, CONST �.�
w'E^SF I FLD CA 6401 id Fit Ye. LANE
SUNSET T CONST
5050-984 ?1
SUSE C F+^
02/22/2011 9:22 Ai s.-800454X
11. 9:05 AM 1/101 1:1'� PI?
�''titr r.c Ai: TEST REPORT
UDC-1-2 ^S'M^ -F i r TEST REPORT ir. RE'
i
n
FILL
UDC 1-
T`'= STARTED '�:RE. AM �.
TE•iT STARTED 02/2L/2 @11 T ,+ T ^`7 •'Ti=iR7F, I
AR E1 0 5@ TEST TIDE 9:2i AM AM Rd vrq
?F.G7,N ._EV,_L 3,5003 Ii :ST STARTED 0212 r2t;_1
EIS STARTED @n�/z2/2011 �- n .;�
n r•�n 1 PFI TF! ', FI,VFL .3.6005 IN rr �- � %......,p N
END DATE 0'2�i/201 i END TIME 9:05 AM TIME ME 1:19 PM
END LEVEL 3.600_. IN ^.i;, D�TF /2n/ �-'"? ;A.Tr- r2r�i
?4; THRESHOLD 0.002 IN 22911 LEVEL � P2r??
TEST RESULT PASSED END LF-VFL 3.6003 IN ., 5-31 III
`'-•-`�; TNRF^HOLD 0.032 IN '��� " ��^TU @.7R1 IN
TEST RESULT PASSED RES`L PASSED
i1DC .:r4
g•06 AM _IDC 3-4 ''SRul
TEST 6TfRTr'?` _
TEST STARTED 02/22/201 TEST STARTED 8:50 AM STARTED
BEGIN, L[VEL 5.1551 It? G _ 1:04 Pp,
TEST STARTED 02/22/2011 h LEVEL T-�RT� @2_�17oj 1
71� T rn 9..11 AM BEGIN LEVEL 5.1581 IN ' 7.4SJ, III;
END DATE' 02/22/2011 :FND TT;.I 9:05 AM FWD TTMF � � 1:11 ?p
`r11.1 FJEL J.15 JJ IN Dr,,E 02/22r 201 l
LEAK THRE-HOLD 0.002 IN END DATE 025,157211 r.mD, ��
n 5,1.572 I N 7.t857 ?N
TEST RESULT �'� r . S THRESHOLD 0.0.02 Ih.
LEAF, THRESHOLD 0.0�J2 IN TE^T .�F^�;!_T ?ASSp
TEST r.
- PASSED
LEC 5-6
UDC 5-6 FILL
-rFc;T =.T A7,TED '?:0t. AM .,
��c� cT
TEST STARTEF 02/'2/2011. ,^T ^TyiTf t, �,:5@ AM T STARTED'nOTal 1.174 R
F3i,.1s LEVEL 3.2068 IN TEST STARTED 02/22/2011 `� 'T�:r , '22/2011
END TILE 9:21 AM ;757N , UFL 3 IN
FNr� 7tA7: 92/22/2011 UFO 3,2 @72 IN TIME'
END TIME 9:05 AC �:., ,;T- 1° .9 PM
END LEIEL 3.2066 IN �n `)ATF.. 02,•22/ 5,761•2IN
;•E,y}{ Ts{R�F,d'OLD @.002 IN - 2 @11 LEVEL 3.5361 Ilti
TEST R 4RE PASSED END LEVEL -3.2069 IN I r`w T`"'F'} U D M2 IN
TPK 7ARFSHOL.D 0.002 IN RESULT PASSED
TEST RESULT PASSED
?DC 7-4
TE^7 STARTED 9:06 AM
T'CCT ^TrgRTFD G /22/2 @11 STARTED 1:94 Pt
BEGIN LEVEL 4.5250 IN TEST STARTED 8:50 AM T��' ^TP4! TM +31/12/1011
F T11F 9:21. IM �^T STARTED 02/22'/2011 `! LEVEL 5.6151 I N
tif� T,. .. BEGIN LEVEL 4.5246 IN c41r.
END DATE 02/22/2011 EGI -EU iil DATE
END sum- 4.5250 I,�1 9:95 AM 02^/22/201.1
LEAF; THRESHOLD 0.002 It! END DATE 0.22/2011 5.P07 TH
Trs'T S�L T PASSED -4D I --=L d.5251 Ii �K THRESHOLD 0.002 Rf It,
-rrT
LEAF', THRESHOLD 0.092 IN "!'_T FAILED
7TS i!_T PASSED