Loading...
HomeMy WebLinkAbout2010 SPILL BUCKET IIIIIIIIIIIIIIIIIIII 53 IE SWRCB,January 2006 Spill Bucket Testing Report Form This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and printouts from tests(f applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. 1. FACILITY INFORMATION Facility Name: #360 Farrell's Fastrip Date of Testing: 09/24/2010 Facility 6401 White Lane,Bakersfield,CA 93309 Facility Contact: Omero Garcia I Phone: 661-393-7000 Date Local Agency Was Notified of Testing: 8/27/2010 Name of Local Agency Inspector(fpresent during testing): Ernie Medina 2. TESTING CONTRACTOR INFORMATION Company Name: Confidence UST Services, Inc. Technician Conducting Test: Bryan A Self Credentials: N CSLB Contractor 0 ICC Service Tech. ❑SWRCB Tank Tester ❑Other(Spec) License Number(s): CSLB# 804904 ICC# 8022804-UT 3. SPILL BUCKET TESTING INFORMATION Test Method Used: El Hydrostatic ❑Vacuum ❑Other Test Equipment Used: Lake Test Equipment Resolution: 0.0625" Identify Spill Bucket(By Tank 1 Diesel Fill 2 3 4 Number, Stored Product, etc.) Bucket Installation Type: ❑Direct Bury ❑Direct Bury ❑Direct Bury ❑Direct Bury ❑x Contained in Sump ❑Contained in Sump ❑Contained in Sump ❑Contained in Sum Bucket Diameter: 13.00" Bucket Depth: 11.00" Wait time between applying 5 Min. vacuum/water and start of test: Test Start Time(Tj): 10:45 am Initial Reading(Ri): 10.00" Test End Time(TF): 11:45 am Final Reading(RF): 10.00" Test Duration (TF—Tj): 1 Hour Change in Reading(RF-Ri): 0.00" Pass/Fail Threshold or 0.0625" Criteria: Test Result i _ 7' '� C'= t t nr ® }Pass '❑Fail ❑.Pass ❑�Fa z : ❑ Pass ❑Fa�lw �❑ Pass ❑=Fal. Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING I hereby certify that all the information contained in this report is true, ccurate,and in full compliance with legal requirements. Technician's Signature: Date: 9/24/2010 ' State laws and regulations do not currently require testing to be performed by a qualified contractor.However, local requirements may be more stringent. IIIIIIIIIIIIIIIIIIII 54 IE r 0O 4 Owe* uS t Invoice No: 24440B xr While retesting the diesel spill bucket we also had to change the diesel swivel. �7 Ada " Re uiredRe airs: ,Comments �. Updated 04/19/06 TATT Team i Us !, •CQVhJAMLE MTO COMilocu". Invoice No.: 24440 Site: #360 Farrell's Fastrip 6401 White Lane Bakersfield, CA 93309 Repairs completed: I first opened up the diesel fill sump and changed the fill S.B. While I was changed the S.B. I realized that there was no gasket on the swivel adaptor and that it was not turning so I replaced the swivel adaptor. Required Repairs, Still Pending: Technician Name: Bryan A Self Signature: � -� � Date: 8/27/10