HomeMy WebLinkAboutSB989 2011 SWRCB,January 2002 I IIIIIII VIII III IIII 43
IE Page of
Secondary Containment Testing Report Form
This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the
appropriate pages of thisform to report results for all components tested The completed form,written test procedures, and
printouts from tests(if applicable),should be provided to the facility owner/operator for submittal to the local regulatory agency.
1. FACILITY INFORMATION
Facility Name: Fastrip#366 Date of Testing: 2/24111
Facility Address: 8001 White Lane Bakersfield CA
Facility Contact: Jaco Hill Phone: 1-661-393-7000
Date Local Agency Was Notified of Testing: 2/16/11
Name of Local Agency Inspector(rf present during testing):
2. TESTING CONTRACTOR INFORMATION
Company Name: Sunset Mechanical
Technician Conduc ' g Test- Scott Olinger
Credentials: CSLB Licensed Contractor ❑SWRCB Licensed Tank Tester
License Type. C-36 C-10 License Number. 589517
Manufacturer Trainine
Manufacturer Component(s) Date Training Expires
Incon TS-STS INSPECTION EQUIPMENT 1/18/13
VEEDER ROOT MONITORING SYSTEM 1/15/12
ICC CAL UST SERVICE TECH 1/18/13
3. SUMMARY OF TEST RESULTS
Not Repairs Not Repairs
Component Pass Fail Tested Made Component Pass Fail Tested Made
UDC# 1-2 X FILL#1 X
UDC#3-4 X FILL#2 X
UDC#5-6 X FILL#3 X
UDC#7-8 X FILL#4 X
UDC#9-10 X PIPING RUN#1 X
UDC# 11-12 X PIPING RUN#2 X
STP#1 X PIPING RUN#3 X
STP#2 X PIPING RUN#4 X
STP#3 X PIPING RUN#5 X
STP#4 X PIPING RUN#6 X
ANN SPACE#1 X PIPING RUN#7 X
ANN SPACE#2 X PIPING RUN#8 XLI
If hydrostatic testing was performed,describe what was done with the water after completion of tests:
CERTIFICATION;LTECRdCIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
To the best of my knowledge,the din this document are accurate and in full compliance with legal requirements
Technician's Signature' Date: 2-24-11
IIIIIIIIIIIIIIIiilll 44
IE
SWRCB,January 2002 Page of
Secondary Containment Testing Report Form
This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the
appropriate pages of this form to report results for all components tested The completed form,written test procedures, and
printouts from tests(rf applicable),should be provided to the facility ownerloperator for submittal to the local regulatory agency.
1. FACILITY INFORMATION
Facility Name: Fastrip#366 Date of Testing: 2/24/11
Facility Address: 8001 White Lane Bakersfield CA
Facility Contact: Jaco Hill Phone: 1-661-393-7000
Date Local Agency Was Notified of Testing: 2/16/11
Name of Local Agency Inspector(if present during testing):
2. TESTING CONTRACTOR INFORMATION
Company Name: Sunset Mechanical
Technician Conducti Test: Scott Olinger
Credentials: CSLB Licensed Contractor ❑SWRCB Licensed Tank Tester
License Type: C-36 C-10 License Number: 589517
Manufacturer Trainine
Manufacturer Component(s) Date Training Expires
Incon TS-STS INSPECTION EQUIPMENT 1/18/13
VEEDER ROOT MONITORING SYSTEM 1/15/12
ICC CAL UST SERVICE TECH 1/18/13
3. SUMMARY OF TEST RESULTS
Not Repairs Not Repairs
Component Pass Fail Tested Made Component Pass Fail Tested Made
ANN SPACE#3 X
ANN SPACE#4 X
SPILL#1 X
SPILL#2 X
SPILL#3 X
SPILL#4 X
• SPILL#1 X
• SPILL#2 X
• SPILL#3 X
• SPILL#4 X
If hydrostatic testing was performed,describe what was done with the water after completion of tests:
CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
To the best of my knowledge,the facts stated in this document are accurate and in full compliance with legal requirements
Technician's Signature: Date: 2-24-11
SWRCB,January 2002 Page of
4. TANK ANNULAR TESTING
Test Method Developed By: Tank Manufacturer ❑Industry Standard ❑Professional Engineer
❑Other(Spec)
Test Method Used: ❑Pressure Vacuum ❑Hydrostatic
❑Other(Specify)
Test Equipment Used:4"Gauge with Certs Equipment Resolution: 0-30
Tank#1 Tank#2 Tank#3
Is Tank Exempt From Testing?' ❑Yes No ❑Yes No ❑Yes AO ❑Yes Ao
Tank Capacity: 12,000 12,000 12,000 12,000
Tank Material: GLASS/STEEL GLASS/STEEL GLASS/STEEL GLASS/STEEL
Tank Manufacturer. JOOR JOOR JOOR JOOR
Product Stored: UNLEADED UNLEADED PREMIUM DIESEL
Wait time between applying
pressure/vacuum/water and 10 MIN 10 MIN 10 MIN 10 MIN
starting test:
Test Start Time: 9:15 9:15 9:15 10:45
Initial Reading(R4): 12 HG 12HG 12HG 12 HG
Test End Time: 10:15 10:15 10:15 11:45
Final Reading(Rr): 12 HG 12HG 12HG 12 HG
Test Duration: 1 HR 1 HR 1 HR 1 HR
Change in Reading(RF-R): 0 0 0 0
Pass/Fail Threshold or Criteria: 0 0 0 0
Ot
Test Result Pass ;::❑Fail Pass ❑Fail Pass'.. ❑.Fail Pass ❑'Fail,
Was sensor removed for testing? V Yes ❑N-
o ❑NA 16 Yes ❑No ❑NA dYes ❑No ❑NA Yes ❑No ❑NA
Was sensor properly replaced and �j Yes ❑No ❑NA Yes ❑No ❑NA
verified functional after testis ? t/Yes ❑N=ONA Yes ❑No ❑NA
Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests)
' Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary
containment,such as systems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment
testing. (California Code of Regulations,Title 23,Section 2637(a)(6)}
S WRCB,January 2002 Page of
5. SECONDARY PIPE TESTING
Test Method Developed By: Piping Manufacturer ❑Industry Standard ❑Professional Engineer
❑Mer(Spec)
Test Method Used: Pressure ❑Vacuum ❑Hydrostatic
❑Other(Spec)
Test Equipment Used:4"Gel Filled Gauge W/Certs Equipment Resolution: 0-15
.� _
Piping Run#5 Piping Ran#6 Piping Run#7 Piping Run#8
Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass
Piping Manufacturer. AO Smith AO Smith AO Smith AO Smith
Piping Diameter: 3" 3" 3" 3"
Length of Piping Run: 60' 60' 60' 60'
Product Stored: UNL UNL PREM DIESEL
Method and location of Test Boot at STP& Test Boot at STP& Test Boot at STP& Test Boot at STP&
piping-run isolation: Line Line Line Line
Wait time between applying
pressure/vacuum/water and 10 Min 10 Min 10 Min 10 Min
starting test:
Test Start Time: 11:00 am 11:00 am 11:00 am 11:00 am
Initial Reading(R): 5.0 52 52 5.1
Test End Time: 12:00 am 12:00 am 12:00 am 12:00 am
Final Reading(RF): 5.0 52 5.2 5.1
Test Duration: 1 Hour I Hour 1 Hour 1 Hour
Change in Reading(RF-R): 0 0 0 0
Pass/Fail Threshold or 0 0 0 0
Criteria:
Test Result Pass .❑Fail Pass :Fad Pass ";.❑Fad Pass.. ❑Fail
Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests)
SWRCB,January 2002 Page of
5. SECONDARY PIPE TESTING
Test Method Developed By: KPiping Manufacturer ❑Industry Standard ❑Professional Engineer
❑Other(Spec)
Test Method Used: Vpressure ❑Vacuum ❑Hydrostatic
❑Other(Specify)
Test Equipment Used:4"Gel Filled Gauge W/Certs Equipment Resolution: 0-15
Piping Run#1 Piping Run#2 Piping Run#3 Piping Run#4
Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass
Piping Manufacturer: AO Smith AO Smith AO Smith AO Smith
Piping Diameter: 3" 3" 3" 3"
Length of Piping Run: 160' 160' 160' 160'
Product Stored: UNL PREM DIESEL VAPOR
Method and location of Test Boot at STP& Test Boot at STP& Test Boot at STP& Test Boot at STP&
piping-run isolation: Line Line Line Line
Wait time between applying
pressurelvacuum/water and 10 Min 10 Min 10 Min 10 Min
starting test:
Test Start Time: 9:10 am 9:10 am 9:10 am 9:10 am
Initial Reading(RI): 52 5.0 52 5.4
Test End Time: 10:10 am 10:10 am 10:10 am 10:10 am
Final Reading(RF): 5.2 5.0 5.2 5.4
Test Duration: I Hour 1 Hour 1 Hour 1 Hour
Change in Reading(RF-N: 0 0 0 0
Pass/Fail Threshold or 0 0 0 0
Criteria:
Test Result Pass :aj Fail Pass;` Fail :Pass: O Fair !Pass ❑Fail
Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests)
S WRCB,January 2002 Page of
6. PIPING SUMP TESTING
Test Method Developed By: 9Sump Manufacturer ❑Industry Standard ❑Professional Engineer
❑Other(Specify)
Test Method Used: ❑Pressure ❑Vacuum Hydrostatic
❑Other(Specify)
Test Equipment Used: Incon TS-STS Equipment Resolution: 0.0000
„�. ,� , Sump#1 STP Samp#2 STP Sump#3 STP Sump#4 STP
Sump Diameter: 48" 48" 48" 48"
Sump Depth: 74" 74" 70" 66"
Sump Material: Fiberglass Fiberglass Fiberglass Fiberglass
Height from Tank Top to Top of 14" 15" 14" 14"
Highest Piping Penetration:
Height from Tank Top to Lowest 22" 24" 12" 24"
Electrical Penetration:
Condition of sump prior to testing: DRY DRY DRY DRY
Portion of Sump Tested' 16" 16" 16" 16"
Does turbine shut down when / / /
sump sensor detects liquid(both ®Yes ❑No ❑NA 1dYes ❑No ❑NA 1Yes ❑No ❑NA �B'Yes ❑No ❑NA
prod uct and water)?*
Turbine shutdown response time 20 Sec 20 Sec 20 Sec 20 See
Is system programmed for fail-safe Yes ❑No ❑NA 9 Yes ❑No ❑NA &(Yes ❑No ❑NA V(Yes ❑No ❑NA
shutdown?*
Was fail-safe verified to be
operational?* ❑No ❑NA Yes ❑No ❑NA es ❑No ❑NA N Yes ❑No ❑NA
Wait time between applying
pressure/vacuum/water and starting 10 Min 10 Min 10 Min 10 Min
test:
Test Start Time: 10:17 11:03 11:03 12:17
Initial Reading(114): 2.4247 2.9531 5.4940 3.5519
Test End Time: 10:32 11:18 11:18 12:32
Final Reading(RF): 2.4246 2.9525 5.4938 5.5518
Test Duration: 15 MW 15 Min 15 Min 15 Min
Change in Reading(RF-Rj: .0001 .0006 .0002 .0001
Pass/Fail Threshold or Criteria: .002 .002 .002 .002
Test Result . °< Pass ❑Failc Pass` ❑Fail Pass. ❑Fail Pass' ❑Fail `..,
Was sensor removed for testing? es ❑No ❑NA dYes ❑No ❑NA --LLY--es ❑No ❑NA es ❑No ❑NA
Was sensor properly replaced and Yes ❑No ❑NA Yes ❑No ❑NA lk Yes ❑No ❑NA es ❑No ❑NA
verified functional after testin ?
Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests)
'if the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an
asterisk(•)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160)
SWRCB,January 2002 Page of
7. UNDER ISPENSER CONTAINMENT TESTING
Test Method Developed By: UDC Manufacturer ❑Industry Standard ❑Professional Engineer
❑Other(Specify)
Test Method Used: ❑Pressure ❑Vacuum WHydrostatic
❑Other(Spec)
Test Equipment Used: INCON TS-STS Equipment Resolution:0.0000
+�"�� '.f•v �.1:i.�tvsY. :d"'iC=rA.^;:+"P'&,.°s - '.F '33iiw tea'.'A.�l
z.. . UDC#1-2 UDC#3-4 UDC#5-6 UDC#7-8
UDC Manufacturer. Western Western Western Western
UDC Material: Fiber ass Fiber lass Fiberglass Fiberglass
UDC Depth: 30" 30" 30" 30"
Height from UDC Bottom to Top 8" 8" 8" 8"
of Highest Piping Penetration:
Height from UDC Bottom to 6" 6" 6" 6"
Lowest Electrical Penetration:
Condition of UDC prior to DRY DRY DRY DRY
testing:
Portion of UDC Tested 12" 12" 12" 12"
Does turbine shut down when _.,/ // /
UDC sensor detects liquid(both BH Yes ❑No ❑NA VYes ❑No ❑NA 'Yes ❑No ❑NA CYYes ❑No ❑NA
_product and water?•
Turbine shutdown response time 20 SEC 20 SEC 20 SEC 20 SEC
Is system programmed for fail-
safe shutdown?* Yes ❑No ❑NA As ❑No ❑NA Yes ❑No ❑NA Yes ❑No ❑NA
Was fail-safe verified to be
_operational?* Yes ❑No ❑NA Yes ❑No ❑NA 5/Yes ❑No ❑NA es ❑No ❑NA
Wait time between applying 10 Min 10 Min 10 Min 10 Min
pressure/vacuum/water and
starting test
Test Start Time: 10:17 8:53 8:53 8:53
Initial Reading( 5.0791 5.8525 4.7969 3.1071
Test End Time: 10:32 9:08 9:08 9:08
Final Reading Rr): 5.0787 5.8522 4.7960 3.1070
Test Duration. 15 Min 15 Min 15 Min 15 Min
Change in Reading &): .0004 .0003 .0009 .0001
Pass/Fail Threshold or Criteria: .002 .002 .002 .002
Test Result Pass .,`:❑ 0_Fail: Pass ❑Fail
Was sensor removed for testing? Yes ❑No ❑NA es ❑No ❑NA VYes ❑No ❑NA es ❑No ❑NA
Was sensor properly replaced and
verified functional after to ? Yes ❑No ❑NA Yes ❑No ❑NA es ❑No ❑NA Yes ❑No ❑NA
Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests)
'If the entire depth of the UDC is not tested,specify how much was tested. If the answer to W of the questions indicated with an
asterisk(")is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160)
SWRCB,January 2002 Page of
7. 12TE&RISPENSER CONTAINMENT QLDg TESTING
Test Method Developed By UDC Manufacturer ❑Industry Standard 0 Professional Engineer
❑Other(Specify)
Test Method Used: ❑Pressure ❑Vacuum StHydrostatic
❑Other(Sped)
Test Equipment Used: INCON TS-STS Equipment Resolution:0.0000
UDC#9-10 UDC#11-12 UDC# UDC#
UDC Manufacturer Western Western
UDC Material: Fiberglass Fiberglass
UDC 30" 30"
Height from UDC Bottom to Top 8" 8"
of Highest Piping Penetration:
Height from UDC Bottom to 6" 6"
Lowest Electrical Penetration:
Condition of UDC prior to DRY DRY
testing:
Portion of UDC Tested 12" 12"
Does turbine shut down when ` 5��"
UDC sensor detects liquid(both Yes ❑No 0 NA 5i Yes ❑No ❑NA 0 Yes El No ❑NA 0 Yes ❑No ❑NA
roduct and water)?` f�
Turbine shutdown response time 20 SEC 20 SEC
Is system programmed for fail-
safe shutdown?` Yes ❑No ❑NA es ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA Was fail-safe verified to be yes ❑No ❑NA R//Yes ❑No ❑NA ❑Yes 0 No 0 NA
❑Yes ❑No ❑NA
o tional?`
Wait time between applying 10 Min 10 Min
pressure/vacuum/water and
startin test
Test Start Time: 8:53 10:34
Initial Reading(114): 6.5541 3.9940
Test End Time: 9:08 10:49
Final Reading(Rr): 6.5549 3.9940
Test Duration: 15 Min 15 Min
Change in Reading R): .0008 .0
Pass/Fail Threshold or Criteria: .002 .002
Test idt " ;.; Pass . .p Fail - ;' :Pass ❑Fs�t<. 0,Pass ;: lj Fail; ❑ Pass. Ead
Was sensor removed for testing? es ❑No ❑NA es ❑No ONAI ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA
Was sensor properly replaced and Yes ❑No ❑NA IV//Yes ❑No ❑NA I ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA
verified functional after testin ?
Comments—(include information on repairs made prior to testing: and recommended follow-up for failed tests)
'If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an
asterisk(*)is"NOI or"NA",the entire UDC must be tested. (See SWRCB LG-160)
i
SWRCB,January 2002 Page of
8. FILL RISER CONTAINMENT SUMP TESTING
Facility is Not Equipped With Fill Riser Containment Sums ❑
Fill Riser Containment Sumps are Emnt but were Not Tested ❑
Test Method Developed By: Sump Manufacturer ❑Industry Standard ❑Professional Engineer
❑Other(Specify)
Test Method Used: ❑Pressure ❑Vacuum Hydrostatic
❑Other(Specify)
Test Equipment Used: INCON TS-STS Equipment Resolution: 0.0000
.. Fill Sump#1 Fill Sump#2 Fill Sump#3 Fill Sump#4
Sump Diameter. 42" 42" 42" 42"
Sump Depth: 79" 78" 72" 72"
Height from Tank Top to Top of 12" 12" 14" 12"
Highest Piping Penetration:
Height from Tank Top to Lowest 12" 12" 14" 12"
Electrical Penetration:
Condition of sump prior to DRY DRY DRY DRY
testing:
Portion of Sump Tested 14" 14" 14" 14"
Sump Material: Fib ass Fiberglass Fiberfjass Fibe ass
Wait time between applying 10 Min 10 Min 10 Min 10 Min
pressure/vacuum/water and
starting test:
Test Start Time: 10:17 12:17 1128 12:17
Initial Reading : 1.0962 2.3371 2.1847 5.0244
Test End Tune: 10:32 12:32 11:43 12:32
Final Reading 1.0959 2.3371 2.1846 5.0244
Test Duration.. 15 Min 15 Min 15 Min 15 Min
Change in Readin Ril: .0003 0 .0001 0
Pass/Fail Threshold or Criteria: .002 .002 .002 .002
Test-Result: Pass p Fail Pass - 0 Fair P s 0 Fail ass .❑:Fail ,
Is there a sensor in the sump? Yes ❑No 2 Yes ❑No QfYes ❑No es ❑No
Does the sensor alarm when L-
either product or water is E�'Yes ❑No ❑NA R Yes ❑No ❑NA Wares ❑No ❑NA 1 es ❑No ❑NA
detected?
Was sensor removed for testing? WYes ❑No ❑NA es ❑No ❑NA Fw(Yes ❑No ❑NA Yes ❑No ❑NA
Was sensor properly replaced and yes ❑No ❑NA Yes ❑No ❑NA R'Yes ❑No ❑NA Yes ❑No ❑NA
verified functional after testin ?
Comments—(include information on repairs made prior to testing and recommended follow-up for failed tests)
SWRCB,January 2002 Page of
9.SPILIJOVERFILL CONTAINMENT BOXES
Facili is Not Equipped With Spill/Overfill Containment Boxes ❑
Spill/Overfill Containment Boxes are sent,but were Not Tested ❑
Test Method Developed By: Spill Bucket Manufacturer ❑Industry Standard ❑Professional Engineer
❑Other(Specify)
Test Method Used: ❑Pressure ❑Vacuum gHydrostatic
❑Other(Spec)
Test Equipment Used:1NCON TS-STS Equipment Resolution:0.0000
Spill Box#V1 Spill Bog#V2 Spill Bog#V3 Spill Bog#V4
Bucket Diameter: 12" 12" 12" 12"
Bucket Depth: 12" 12" 12" 12"
Wait time between applying
pressure/vacuum/water and 10 MIN 10 MIN 10 MIN 10 MIN
starting test:
Test Start Time: 2:50 2:50 2:09 12:17
Initial Reading(R1): 3.0926 4.4142 3.0837 3.4593
Test End Time: 3:05 3:05 2:24 12:32
Final Reading(RF): 3.0935 4.4144 3.0819 3.4587
Test Duration: 15 MIN 15 MIN 15 MIN 15 MIN
Change in Reading(RF-R.): .0011 .0002 .0018 .0006
Pass/Fail Threshold or .002 .002 .002 .002
Criteria:
Test-Residt Pass..°❑Fail 'Pass ,'D Fail Pass -Fall` Pass ❑Fail'>
Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests)
SWRCB,January 2002 Page of _
9.SPILL/OVERFH L CONTAINMENT BOXES
Facility is Not Equipped With Spill/Overfill Containment Boxes ❑
Spill/Overfill Containment Boxes are sent,but were Not Tested ❑
Test Method Developed By. Spill Bucket Manufacturer 0 Industry Standard ❑Professional Engineer
❑Other(Spec)
Test Method Used: ❑Pressure ❑Vacuum YHydrostatic
❑Other(Specify)
Test Equipment Used:INCON TS-STS Equipment Resolution:0.0000
x Spill Box#1 Spill Box#2 Spill Boa#3 Spill Box#4
Bucket Diameter: 12" 12" 12" 12"
Bucket Depth: 12" 12" 12" 12"
Wait time between applying
pressure/vacuum/water and 10 MIN 10 M1N 10 MIN 10 MIN
starting test:
Test Start Time: 2:50 2:50 2:09 2:09
Initial Reading(R): 5.3632 4.5215 4.0680 3.8219
Test End Time: 3:05 3:05 2:24 2:24
Final Reading(RF): 5.3630 4.5215 4.0666 3.8219
Test Duration: 15 MIN 15 MIN 15 MIN 15 MIN
Change in Reading(RF-1?4): .0002 0 .0014 0
Pass/Fail Tbresbold or 002 .002 .002 .002
Criteria:
Test:Result: Pass ❑Fail, Pass`: p Fail Pass ; ❑FaiF Pass �'Feil
Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests)
FASTRIP 366 FASTRIP 366
FASTRIP 366 8001 WHITE LANE 8001 WHITE LANE
8001 WHITE LANE BAKERSFIELD BAKERSFIELD
BAKERSFIELD SUNSET CONST SUNSET.CONST
SUNSET CONST 1-800-984-6266 1-800-984-6266
1-800-984-6266
02/24/2011 2:40 PM 02/24/2011 3:05 PM
02/24/2011 2:24 PM
SUMP LEAK TEST REPORT SUMP LEAK TEST REPORT
SUMP LEAK TEST REPORT
SPILL4 VSPIL2
SPILL4
TEST STARTED 2:25 PM TEST STARTED 2:50 PM
TEST STARTED 2:09 PM TEST STARTED 02/24/2011 TEST STARTED 02/24/2011
TEST STARTED 02/24/2011 BEGIN LEVEL 3.8219 IN BEGIN LEVEL 4,4142 IN
BEGIN LEVEL 3.8219 IN END TIME 2:40 PM END TIME 3:05 PM
END TIME 2:24 PM END DATE 02/24/2011 END DATE 02/24/2011
END DATE 02/24/2011 END LEVEL 3.8219 IN END LEVEL 4,4144 IN
END LEVEL 3,8219 IN LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0.002 IN
LEAK THRESHOLD 0,002 IN TEST RESULT PASSED TEST RESULT PASSED
TEST RESULT PASSED
STILL3 VSPILI
STILL3
TEST STARTED 2:25 PM TEST STARTED 2:50 PM
TEST STARTED 2:09 PM TEST STARTED 02/24/2011 TEST STARTED 02/24/2011
TEST STARTED 02/24/2011 BEGIN LEVEL 4.0664 IN BEGIN LEVEL 3,0926 IN
BEGIN LEVEL 4,0680 IN END TIME 2:40 PM END TIME 3:05 PM
END TIME 2:24 PM END DATE 02/24/2011 END DATE 02/24/2011
END DATE 02/24/2011 END LEVEL 4,0666 IN END LEVEL 3,0935 IN
END LEVEL 4,0666 IN LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN
LEAK THRESHOLD 0,002 IN TEST RESULT PASSED TEST RESULT PASSED
TEST RESULT PASSED
VSPIL&: SPILL/
VSPIL3
TEST STARTED 2:25 PM TEST STARTED 2:50 PM
TEST STARTED 2:09 PM TEST STARTED 02/24/2011 TEST STARTED 02/24/2011
TEST STARTED 02/24/2011 BEGIN LEVEL 3.0820 IN BEGIN LEVEL 5,3632 IN
BEGIN LEVEL 3,0837 IN END TIME 2:40 PM END TIME 3:05 PM
END TIME 2:24 PM END DATE 02/24/2011 END DATE 02/24/2011
END-DATE 02/24/2011 END LEVEL 3,0824 IN END LEVEL 5.3630-IN
END LEVEL 3,0819 IN LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0.002 IN
LEAK THRESHOLD 0,002 IN TEST RESULT PASSED TEST RESULT PASSED
TEST RESULT PASSED
SPILL2 SPILL2
SPILL2
TEST STARTED 2:25 PM TEST STARTED 2:50 PM
TEST STARTED 2:09 PM TEST STARTED 02/24/2011 TEST STARTED 02/24/2011 =
TEST STARTED 02/24/2011 BEGIN LEVEL 4,5194 IN BEGIN LEVEL 4.5215 IN
BEGIN LEVEL 4,5223 IN END TIME 2:40 PM END TIME 3:05 PM
END TIME 2:24 PM END DATE 02/24/2011 END DATE 02/24/2011
END DATE 02/24/2011 END LEVEL 4.5177 IN END LEVEL 4,5215 IN
END LEVEL 4,5202 IN LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0.002 IN
LEAK THRESHOLD 0,002 IN TEST RESULT PASSED TEST RESULT PASSED
TEST RESULT FAILED
FASTRIP 366
8001 WHITE LANE FASTRIP 366 FASTRIP 366
BAKERSFIELD 8001 WHITE LANE 8001 WHITE LANE
SUNSET CONST BAKERSFIELD BAKERSFIELD
1-800-984-6266 SUNSET CONST SUNSET CONST
1-800-984-6266 1-800-984-6266
02/24/2011 11:44 AM 02/24/2011 12:33 PM
02/24/2011 12:55 PM
SUMP LEAK TEST REPORT
SUMP LEAK TEST REPORT SUMP LEAK TEST REPORT
STP 2
STP 4 STP 4
TEST STARTED 11:28 AM
TEST STARTED 02/24/2011 TEST STARTED 12:17 PM TEST STARTED 12:39 PM
BEGIN LEVEL 2,9528 IN TEST STARTED 02/24/2011 TEST STARTED 02/24/2011
END TIME 11:43 AM BEGIN LEVEL 5,5519 IN BEGIN LEVEL 5,5517 IN
END DATE 02/24/2011 END TIME 12:32 PM END TIME 12:55 PM
END LEVEL 2,9525 IN END DATE 02/24/2011 END DATE 02/24/2011
LEAK THRESHOLD 0,002 IN END LEVEL 5,5518 IN END LEVEL 5.5514..IN
TEST RESULT PASSED LEAK THRESHOLD 0.002 IN LEAK THRESHOLD 0,002 IN
TEST RESULT PASSED TEST RESULT PASSED
STP 3
FILL 4 FILL 4
TEST STARTED 11:28 AM
TEST STARTED 02/24/2011 TEST STARTED 12:17 PM TEST STARTED 12:39 PM
BEGIN LEVEL 5.4937 IN TEST STARTED 02/24/2011 TEST STARTED 02/24/2011
END TIME 11:43 AM BEGIN LEVEL 5.0244 IN BEGIN LEVEL 5.0243 IN
END DATE 02/24/2011 END TIME 12:32 PM END TIME 12:55 PM
END LEVEL 5.4935 IN END DATE 02/24/2011 END DATE 02/24/2011
LEAK THRESHOLD 0,002 IN END LEVEL 5.0244 IN END LEVEL 5,0238 IN
TEST RESULT PASSED LEAK THRESHOLD 0.002 IN LEAK THRESHOLD 0,002 IN
TEST RESULT PASSED TEST RESULT PASSED
FILL 2
VSPIL4 VSPIL4
TEST STARTED 11:28 AM TEST STARTED 12:17 PM
TEST STARTED 02/24/2011 ST STARTED 02/24/2011 TEST STARTED 12:39 PM
TEST BEGIN LEVEL 2,6657 IN TEST STARTED 02/24/2011
END TIME 11:43 AM BEGIN LEVEL 3,4593 IN BEGIN LEVEL 3,4579 IN
END DATE 02/24/2011 END TIME 12:32 PM END TIME 12:55 PM
END LEVEL 2,6706 IN END DATE 02/24/2011 END DATE 02/24/2011
LEAK THRESHOLD 0,002 IN END LEVEL 3,4587.IN END LEVEL 3.4571 'IN
TEST RESULT INCREASED LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN
TEST RESULT PASSED TEST RESULT PASSED
FILL 3
FILL 2 FILL 2
TEST STARTED 11:28 AM TEST STARTED 12:17 PM
TEST STARTED 02/24/2011 TEST STARTED 12:39 PM
BEGIN LEVEL 2. 1847 IN TEST STARTED 02/24/2011 TEST STARTED 02/24/2011
END TIME 11:43 AM BEGIN LEVEL 2.3371 IN BEGIN LEVEL 2,3371 IN
END DATE 02/24/2011 END TIME 12:32 PM END TIME 12:55 PM
END LEVEL 2.1846 IN END DATE 02/24/2011 END DATE 02/24/2011
LEAK THRESHOLD 0,002 IN END LEVEL 2,3371 IN END LEVEL 2,3371 IN
TEST RESULT PASSED LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN
TEST RESULT PASSED TEST RESULT PASSED
FASTRIP 366
8001 WHITE LANE
FASTRIP 366 BAKERSFIELD
O3SSHd 11{1S3d 1S31 8001 WHITE,LANE
NT 200'0 O1DHS3L�H1 X131 ' SUNSET CONST
BAKERSFIELD 1-800-984-6266
%I V960't 13,31 ON3 SUNSET IONST
u OZ VW0 3iVO ON3: 1-800-934-6266
WH bt:01 3WI1 ON3`:' 02/24/2011 11:28 AM
NI - 960't 13,31 N1939 02/24/2011 10:49 AM SUMP LEAK TEST REPORT
llOUVUZO 131�VIS 1531
wv 69:6 O318H1S 1S31 SUMP LEAK TEST REPORT STP 2
l 11I3 UDC 1-2 TEST STARTED 11:03 AM
TEST STARTED 02/24/2011
.TEST STARTED 10:34 AM BEGIN LEVEL 2,9531 IN
03SSUd iinS38 1S31. TEST STARTED 02/24/2011 END TIME 11:18 AM
P:I Z00'C iIiOHS3b1+1 Xti31 BEGIN LEVEL 0,OU00 IN END DATE 02/24/2011
MI 8bZb'Z 13A31 ON3 END TIME 10:49 AM END LEVEL 2,9525 IN
IIOZ/WO 31VO OIN3 END DATE C,2/2&/2611 LEAK THRESHOLD 0,002 IN
WV bl:0l 3WIl ON3 END LEVEL 0,0000 IN TEST RESULT PASSED
NI 05Zb'Z 13A31 1,111539 LEAK THRESHOLD 0.002 IN
ItOZ/bZ/Z0 OhdV1S iS3i TEST RESULT PASSED.
WV 6S:6 031dViS 1S31 ;- STP 3
L d1S UDC1112
TEST STARTED 11:03 AM
TEST STARTED 02/24/2011
.TEST STARTED 10:34 AM BEGIN LEVEL 5,4940 IN
03SSVd 11f1S3a 1S31 TEST.STARTED .02/24112011 END TIME 11:18 AM
NI Z03'0 0lOHS3MHi XV31• BEGIN LEVEL 3,9940 IN END DATE 02/24/2011
NI Zl66'£ 13A31 ON3 ` END TIME 10:49 AM END LEVEL 5,4938 IN
llOZ/bZ/ZO 31NO ONE END DATE' 02/24/2011', : LEAK THRESHOLD 0,002 IN
WH bl:Ol 3WI1 ON3:,. -`END LEVEL:. 3.9,940 IN TEST RESULT PASSED
NI Z166'S 13A31 NI939 LEAK THRCE ROLD 0.002 IN
ltOc/bZ%Z0 O31'ddiS IS31 TEST RESULT PASSED
0318VIS 1S31
FILL 2
ZtllDOf1 STP 1
_. TEST STARTED 11:03 AM
TEST STARTED 02/24/2011
TEST STARTED 10:34 A-M BEGIN LEVEL 2,6438 IN
03SSbd 10.S38 IS31 TESTS U2/L'4i2O11
NI 200'0 O10HS38Hi XV31 END TIME 11:18 AM
BEGIN LEVEL 0:1205 iN END DATE 02/24/2011
NI 062-O'S 131131 ON3 END TIME . 10:4G AM END LEVEL 2,6624 IN
u OZ/bZ!ZO 31VfJ ON3 ,END DATE 02/24/2011 LEAK THRESHOLD 0,002 IN
WV bl:Ot . 3WIi.ON3' END LEVEL 0;0151 IN TEST RESULT IPICREASED
NI l6}0'S 13A31 Ni938 LEAK THRESHOLD 0,002 IN
1LOZ/WZ0 031dViS-IS31 TEST RESULT FAILED
WV 6S:6 , 031dVlS 1S31 FILL 3
Z-1 ion FILL. 1
TEST STARTED 11:03 AM
IdN]8 1S31 Xtl3l dons TEST STARTED 02/24/2011 =
TEST STARTED 10:34 AM BEGIN LEVEL 2,1852 IN
TEST STARTED 02/24/2011 END TIME= 11:18 AM
Wt+ Sl:OI II02/Z0 BEGIN LEVEL 3:8751 IN,- END DATE 02/24/2011
ENO TIME 10:49 AM END LEVEL . 2,1848 IN
9929-G86-00$-1 END DATE 02/24/2011
P•iD1 13SN(1S LEVEL - LEAK THRESHOLD 0.002 IN
1S
END LEVEL . 3,875., IN TEST RESULT PASSED
013IdS83NVO LEAK THRESHOLD 0,002 IN
31,41 311HA 100S TEST RESULT PASSED
99S dlal_SVd
FASTRIP 356 FASTRIP 366 FASTRIP 366
8001 `dHITE LANE 8001 VHITE LANE 8001 UNITE LANE
BAKERSFIELD BAKERSFIELD BAKERSFIELD
SUNSET CONST SUNSET CONST. SUNSET CONST
17400-984-6266 1-800-984-6266 1-800-984-6265
02/24/2011 9:08 AM 02/24/2011 .9:26 Ail 02/24/2011 10:32 AM
SUMP LEAK TEST REPORT SUMP LEAK TEST REPORT SUMP LEAK TEST REPORT
UDC 3-4 UDC 3-4 UDC 1-2
TEST STARTED 8'53 AM TEST STARTED ::10 AM TEST STARTED 10:17 AM
TEST STARTED 02±24/2011 TEST STAkTEU 02/14;'2011 TEST STARTED 02/24/2011
BEGIN LEVEL 5,8525 IN BEGIN LEVEL 5,8523 IN BEGIN LEVEL 5.0791 IN
END TIME 9:08 AM END TIME 9:26 AM END TIME 10:32 AM
END DATE 02/24/2011 END DATE 02/24/2011 END DATE 02/24/2011
END LEVEL 5,8522 IN
END LEVEi_ 5,852 2 IN END LEVEL 5,0787 IN
LEAK THRESHOLD 0.002 IN LEAK THRESHOLD 0.002 IN LEAK THRESHOLD 0,002 IN
TES*f RESULT PASSED TEST RESULT PASSED TEST RESULT PASSED
UDC 5-6 UDC 5-6 UDC1112
TEST STARTED -,s:53 AM LEST STARTED 9:10 AM
TEST STARTED 10:17 AM
TEST STARTED 02/2412011 TEST STARTED 62/24/2011 TEST STARTED 02/24%2011
BEGIN LEVEL 4,79b9 IN BEGIN LEVEL 4.7949:IN BEGIN LEVEL 3,9808 IN
END TIME 9:O8 AM END TIME 9:26 AM END TIME 10:32 AM
�n
END DATE 02i24/2011 ENG DATE 02/24/2011 END DATE 02/24112011
END LEVEL 4,7960 IN END LEVEL 4,7946 IN END LEVEL 3,9944 IN
LEAK THRESHOLD O, J2 IN 'LEAK THRESHGLO 0,GO2 IN LEAK THRESHOLD 0 002 IN
TEST RESULT PASSED TEST RESULT. PASSED TEST RESULT INCREASED
UDC 7-8 UDC 7-$ STP 1
TEST STARTED 8:53 AM
TEST STARTED 02/24/2011 TEST STARTED 9:10 AM. TEST STARTED 10:17 AM
TEST STARTED 02/24/2011 TEST STARTED 02/2L/2011i
.BEGIN LEVEL 3. 1071 IN BEGIN LEVEL 3, 1066 IN BEGIN LEVEL 2.L07 IN
END TIME 9:08 AM END TIME 9:26 AM END TIME 10:32 AM
END DATE 02/242011 END DATE 02/24/2011 END. DATE 0212412011
END LEVEL 3,1070 IN END LEVEL 3, 1054 IN END LEVEL 2.4246 IN
LEAK THRESHOLD 0.002 I'rJ LEAK THRESHOLD' Cl.OD% 1N
?ASSEU LEAK THRESH 0,002 IN.
TEST RESULT TEST RESULT PASSED TEST RESULT PASSED
UDC9-10 UDC9-10 FILL 1
TEST STARTED 8:53 AM TEST STARTED 9:10 AM TEST STARTED 10:17 AM
TEST STARTED 02/24/'2011 TEST STARTED G2/2t'/2011 TEST STARTED 02/24/2011
BEGIN LEVEL 6,5541 It! BEGIN LEVEL 6,5554 IN BEGIN LEVEL 1.6962 IN
END TIME 9:08 AM END TIME 9:26 AM END TIME 10:32 AM
END DATE 02/24/2011
6.5549 IN END DATE 02j24/2011 END. OATE 02/24/2011
END LEVEL END LEVEL 6;5562 IN END LEVEL 1,0959 IN
LEAK THRESHOLD 0:002 TN END
THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN
TEST RESULT PASSED TEST RESULT PASSED TEST RESULT PASSED