HomeMy WebLinkAboutSB989 2011 SWRCB,January 2002 I IIIIIII IIIIIIII IIII 45 �e P of
IE
Secondary Containment Testing Report Form
This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the
appropriate pages of this form to report results for all components tested The completed form,written test procedures, and
printouts from tests(rf applicable),should be provided to the facility owner/operator for submittal to the local regulatory agency.
1. FACILITY INFORMATION
Facility Name: Fastrip#367 Date of Testing: 2/23/11
Facility Address: 8001 White Lane Bakersfield CA
Facility Contact: Jaco Hill Phone: 1-661-393-7000
Date Local Agency Was Notified of Testing: 2/16/11
Name of Local Agency Inspector(f present during testing):
2. TESTING CONTRACTOR INFORMATION
Company Name: Sunset Mechanical
Technician Conducting Test: Scott Olinger
Credentials: CSLB Licensed Contractor ❑SWRCB Licensed Tank Tester
License Type: C-36 C-10 License Number. 589517
Manufacturer Trainine
Manufacturer Component(s) Date Training Expires
Incon TS-STS INSPECTION EQUIPMENT 1/18/13
VEEDER ROOT MONITORING SYSTEM 1/15/12
ICC CAL UST SERVICE TECH 1/18/13
3. SUMMARY OF TEST RESULTS
Component Pass Fail Not Repairs Component Pass Fail Not Repairs
Tested Made Tested Made
UDC# 13-14 X ANN SPACE#2 X
UDC# 15-16 X ANN SPACE#3 X
UDC# 17-18 X ANN SPACE#4 X
UDC# 19-20 X PIPING RUN#1 X
UDC#21-22 X PIPING RUN#2 X
UDC #23-24 X PIPING RUN#3 X
STP 42 X PIPING RUN#4 X
STP#3 X PIPING RUN#5 X
STP#4 X PIPING RUN#6 X
FILL#2 X PIPING RUN#7 X
FILL#3 X PIPING RUN#8 X
FILL#4 X
If hydrostatic testing was performed,describe what was done with the water after completion of tests:
CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
To the best of my knowledge,the cts o in this document are accurate and in full compliance with legal requirements
Technician's Signature I IIIIIII VIII II II Date: 2-23-11
46
IE
SWRCB,January 2002 Page of
Secondary Containment Testing Report Form
Thisform is intendedfor use by contractors performingperiodic testing of USTsecondary containment systems. Use the
appropriate pages of this form to report results for all components tested The completed form, written test procedures, and
printouts from tests(f applicable),should be provided to the facility owner/operator for submittal to the local regulatory agency.
1. FACILITY INFORMATION
Facility Name: Fastrip#366 Date of Testing: 2/24/11
Facility Address: 8001 White Lane Bakersfield CA
Facility Contact: Jaco Hill Phone: 1-661-393-7000
Date Local Agency Was Notified of Testing: 2116/11
Name of Local Agency Inspector(fpresent during testing):
2. TESTING CONTRACTOR INFORMATION
Company Name: Sunset Mechanical
Technician Conduc ' g Test: Scott Olinger
Credentials: A CSLB Licensed Contractor ❑SWRCB Licensed Tank Tester
License Type. C-36 C-10 License Number. 589517
Manufacturer Training
Manufacturer Component(s) Date Training Expires
Incon TS-STS INSPECTION EQUIPMENT 1/18/13
VEEDER ROOT MONITORING SYSTEM 1/15/12
ICC CAL UST SERVICE TECH 1/18/13
3. SUMMARY OF TEST RESULTS
Not Repairs Not Repairs
Component Pass Fail Tested Made Component Pass Fail Tested Made
SPILL#1 X
SPILL#2 X
SPILL#3 X
SPILL#4 X
V SPILL#1 X
V SPILL#2 X
V SPILL#3 X
If hydrostatic testing was performed,describe what was done with the water after completion of tests:
CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
To the best of my knowledge,the t ed s this document are accurate and in full compliance with legal requirements
Technician's Signature: Date: 2-23-11
SWRCB,January 2002 Page of
4. TANK ANNULAR TESTING
Test Method Developed By: Tank Manufacturer ❑Industry Standard ❑Professional Engineer
❑Other(Spec)
Test Method Used: ❑Pressure Vacuum ❑Hydrostatic
❑Other(Specify)
Test Equipment Used:4"Gauge with Certs Equipment Resolution: 0-30
A
Tank#1 Tank#2 Tank#3 Tank#4
Is Tank Exempt From Testing?1 Yes 0 No ❑Yes WNo ❑Yes No ❑Yes No
Tank Capacity: 12,000 12,000 12,000 12,000
Tank Material: FIBERLASSS GLASS/STEEL GLASS/STEEL GLASS/STEEL
Tank Manufacturer. ZERXES MODERN MODERN MODERN
Product Stored: UNLEADED UNLEADED PREMIUM DIESEL
Wait time between applying
pressure/vacuum/water and 10 MIN 10 MIN 10 MIN
stattin g test:
Test Start Time: 9:30 9:30 9:30
Initial Reading(R1): IOHG IOHG 10HG
Test End Time: 10:30 10:30 10:30
Final Reading(RF): l OHG l OHG IOHG
Test Duration: 1 HR 1 HR I HR
Change in Reading(RF-R): 0 0 0
Pass/Fail Threshold or Criteria: 0 0 0
Test Resnlf D.Pass ,'O Fail Pass:": O Fail Pass C:Fail Pass O;Fail
Was sensor removed for testing? ❑Yes ❑No 0 NA es ❑No ❑NA Yes ❑No ❑NA MYes ❑No ❑NA
Was sensor properly replaced and
verified functional after testis ? Yes No NA es ❑No ❑NA Yes ❑No ❑NA es ❑No ❑NA
Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests)
' Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary
containment,such as systems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment
testing. (California Code of Regulations,Title 23,Section 2637(a)(6))
SWRCB,January 2002 Page of
5. SECONDARY PIPE TESTING
Test Method Developed By: &Piping Manufacturer ❑Industry Standard ❑Professional Engineer
❑Pther(Spec)
Test Method Used: 9Pressure ❑Vacuum ❑Hydrostatic
❑Other(Spec)
Test Equipment Used:4"Gel Filled Gauge W/Certs Equipment Resolution: 0-15
Piping Run#1 Piping Run#2 Piping Run#3 Piping Run#4
Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass
Piping Manufacturer. AO Smith AO Smith AO Smith AO Smith
Piping Diameter: 3" 3" 3" 3"&4"
Length of Piping Run: 180' 170' 160' 180'
Product Stored: UNL PREM DIESEL VAPOR
Method and location of Test Boot at UDC& Test Boot at UDC& Test Boot at UDC& Test Boot at UDC&
piping-run isolation: STP STP STP STP
Wait time between applying
pressure/vacuum/water and 10 Min 10 Min 10 Min 10 Min
starting test:
Test Start Time: 9:15 am 9:15 am 9:15 am 9:15 am
Initial Reading(Ri): 5.1 5.0 5.0 5.1
Test End Time: 10:15 am 10:15 am 10:15 am 10:15 am
Final Reading(RF): 5.1 5.0 5.0 5.1
Test Duration: 1 Hour 1 Hour 1 Hour 1 Hour
Change in Reading(RF-R,): 0 0 0 0
Pass/Fail Threshold or 0 0 0 0
Criteria:
Test.Result Pass ❑Fail Pass.. (I Fail Pass ,.b Fail s Passe Fail
Comments—(include information on repairs made prior to testing; and recommended follow-up for failed tests)
SWRCB,January 2002 Page of
5. SECONDARY PIPE TESTING
Test Method Developed By: tf Piping Manufacturer ❑Industry Standard ❑Professional Engineer
❑Other(Specify)
Test Method Used: dpressure ❑Vacuum ❑Hydrostatic
❑Other(Specify)
Test Equipment Used:4"Get Filled Gauge W/Certs Equipment Resolution: 0-15
M'- M—Lml I!
Piping Run#5 Piping Run#6 Piping Run#7 Piping Run#8
Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass
Piping Manufacturer. AO Smith AO Smith AO Smith AO Smith
Piping Diameter 3" 3" 3" 3"
Length of Piping Run: 60' 70' 80' 90'
Product Stored: UNL UNL PREM DIESEL
Method and location of Test Boot at UDC& Test Boot at UDC& Test Boot at UDC& Test Boot at UDC&
piping-run isolation: STP STP STP STP
Wait time between applying
pressure/vacuum/water and 10 Min 10 Min 10 Min 10 Min
starting test:
Test Start Time: 11:00 am 11:00 am 11:00 am 11:00 am
Initial Reading W: 5.0 5.2 5.2 5.2
Test End Time: 12:00 am 12:00 am 12:00 am 12:00 am
Final Reading(RF): 5.0 5.2 5.2 5.2
Test Duration: 1 Hour 1 Hour 1 Hour 1 Hour
Change in Reading(RF-R): 0 0 0 0
Pass/Fail Threshold or 0 0 0 0
Criteria:
Test Result; Pass D Fail Pass l7 Fail Pass ,O,Fa�I.'. Pass: O Fail, ;
Comments—(include irrfarmation on repairs made prior to testing; and recommended follow-up for failed tests)
SWRCB,January 2002 Page of
6. PIPING SUMP TESTING
Test Method Developed By: Sump Manufacturer 0 Industry Standard 0 Professional Engineer
O Other(Specify)
Test Method Used: ❑Pressure ❑Vacuum OtHydrostatic
O Other(Specify)
Test Equipment Used: Incon TS-STS Equipment Resolution: 0.0000
Samp#2 STP Sump#3 STP Sump#4 STP Sump#
Sump Diameter. 48" 48" 48"
Sump Depth: 61" 60" 59"
Sump Material: Fiberglass Fiberglass Fiberglass
Height from Tank Top to Top of 14" 16" 16"
HighestPiping Penetration:
Height from Tank Top to Lowest 14" 16" 16"
Electrical Penetration:
Condition of sump prior to testing: DRY DRY DRY
Portion of Sump Tested' 18" 18" 18"
Does turbine shut down when /
sump sensor detects liquid(both 14 Yes ❑No ❑NA D'Yes ❑No ❑NA R/Yes ❑No O NA O Yes ❑No ❑NA
product and water)?*
Turbine shutdown response time 20 Sec 20 Sec 20 Sec
Is system programmed for fail-safe
shutdown?' J Yes ❑No ❑NA (Yes O No ❑NA ►/Y
es ❑No ❑NA O Yes O No ❑NA
Was a -safe verified to be
operational?* VYes ❑No DNA //Yes O No DNA I jYes ❑No ❑NA ❑Yes ❑No ❑NA
Wait time between applying
pressure/vacuum/water and starting 15 Min 15 Min 15 Min
test:
Test Start Time: 11:28 11:28 10:20
Initial Reading(Ri): 5.0564 3.7462 4.7372
Test End Time: 11:43 11:43 10:35
Final Reading(RF): 5.0563 3.7455 4.7373
Test Duration: 15 MIN 15 MIN 15 MIN
Change in Reading(RF-R): .0001 .0007 .0001
Pass/Fait Threshold or Criteria: .002 .002 .002
Test Result Pass ;'O Fail✓ Pass.` ❑Fail Pass ❑Fail ;❑ Pass= '0 Fail
Was sensor removed for testing? es 0 No O NA Yes ❑No El NA alfes ❑No ❑NA 0 Yes ❑No ❑NA
Was sensor properly replaced and Yes O No ❑NA Yes ❑No ❑NA es ❑No 0 NA O Yes O No O NA
verified functional after testis ?
Comments—(include Information on repairs made prior to testing: and recommendedfollow-up forfailed tests)
'If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an
asterisk(s)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160)
SWRCB,January 2002 Page of
7. UNDER- ISPENSER CONTAINMENT WDO TESTING
Test Method Developed By: 9UDC Manufacturer ❑Industry Standard ❑Professional Engineer
❑Other(Spec)
Test Method Used: ❑Pressure ❑Vacuum Hydrostatic
❑Other(Spec)
Test Equipment Used: INCON TS-STS Equipment Resolution:0.0000
H UDC#13-14 UDC#15-16 UDC#17-18 UDC#19-20
UDC Manufacturer. Western Western Western Western
UDC Material: Fiberglass Fiberglass Fiberglass Fiberglass
UDC Depth: 31" 31" 31" 31"
Height from UDC Bottom to Top 12" 12" 12" 12"
of Highest Piping Penetration:
Height from UDC Bottom to 6" 6" 6" 6"
Lowest Electrical Penetration:
Condition of UDC prior to DRY DRY DRY DRY
testing:
Portion of UDC Tested 14" 14" 14" 14"
Does turbine shut down when l7// // !
UDC sensor detects liquid(both 4/Yes ❑No ❑NA Yes 13 No ❑NA As ❑No ❑NA Y Yes ❑No ❑NA
product and water)?'
Turbine shutdown response time 20 SEC 20 SEC 20 SEC 20 SEC
CT//
Is system programmed for fail- yes ❑No ❑NA Yes ❑No ❑NA 5kes ❑No ❑NA Yes ❑No ❑NA
safe shutdown?* // [�
Was fail-safe verified to be WYes 11 No ❑NA es ❑No ❑NA C�}I es ❑No ❑NA U7 es ❑No ❑NA
operational?*
Wait time between applying 10 Min 10 Min 10 Min 10 Min
pressure/vacuum/water and
starting test
Test Start Time: 10:37 8:58 8:58 10:37
Initial Readin (R): 7.1223 3.8034 5.1415 62832
Test End Time: 10:52 9:13 9:13 10:52
Final Reading 7.1221 3.8028 5.1415 62826
Test Duration: 15 Min 15 Min 15 Min 15 Min
Change in Reading RF-R : .0002 .0006 0 .0006
Pass/Fail Threshold or Criteria: .002 .002 .002 .002
-Test Restilf :Pass'. ,"❑Fail' Pass'"❑Fail Pass:,`. p Fail Pas§. C -Fail
Was sensor removed for testing? EfYes ❑No ❑NA _L-es ❑No ❑NA es ❑No ❑NA Yes ❑No ❑NA
Was sensor properly replaced and R Yes ❑No ❑NA @Y `es ❑No ❑NA f'Yes ❑No ❑NA es ❑No ❑NA
verified functional after testis 7
Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests)
If the entire depth of the UDC is not tested,specify how much was tested. If the answer to My of the questions indicated with an
asterisk(')is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160)
SWRCB,January 2002 Page of
7. ITT -DISPENSER CONTAINMENT aTQ TESTING
Test Method Developed By: "UDC Manufacturer ❑Industry Standard ❑Professional Engineer
D Other(Specify)
Test Method Used: ❑Pressure ❑Vacuum WHydrostatic
❑Other(Specify)
Test Equipment Used: INCON TS-STS Equipment Resolution:0.0000
UDC#9-10 UDC#11-12 UDC# UDC#
UDC Manufacturer: Western Western
UDC Material: Fiberglass Fiberglass
UDC Depth: 31" 31"
Height from UDC Bottom to Top 12" 12"
of Highest Piping Penetration:
Height from UDC Bottom to 6" 6"
Lowest Electrical Penetration:
Condition of UDC prior to DRY DRY
testing:
Portion of UDC Tested 14" 14"
Does turbine shut down when /
UDC sensor detects liquid(both (/Yes ❑No ❑NA Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA
product and water)?.
Turbine shutdown response time 20 SEC 20 SEC
Is system programmed for fail- p�Yes ❑No D NA Yes ❑No DNA ❑Yes D No ❑NA D Yes D No D NA
safe shutdown?* //
Was fail-safe verified to be y ❑No D NA D�Yes ❑No ❑NA ❑Yes ❑No 11 NA D Yes D No ❑NA
operational?*
Wait time between applying 10 Min 10 Min
pressure/vacuum/water and
starting test
Test Start Time: 8:58 8:58
Initial Readin 4.2513 4.7911
Test End Time: 9:13 9:13
Final Reading RF): 4.2510 4.7909
Test Duration: 15 Min 15 Min
Change in Readin (RF- .0003 .0002
Pass/Fail Threshold or Criteria: .002 .002
Test_Result. Pass ':,❑Fail Pass ❑Fail: 0 Pass:' ❑:Fall ❑ Pass ❑=Fail
Was sensor removed for testing? es ❑No D NA Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No D NA
fsensor properly replaced and Yes ❑No ❑NA es ❑No ❑NA D Yes ❑No D NA D Yes D No ❑NA
fied functional after testing?
Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests)
'If the entire depth of the UDC is not tested,specify how much was tested If the answer to Oy of the questions indicated with an
asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160)
SWRCB,January 2002 Page of
8. FILL RISER CONTAINMENT SUMP TESTING
Facility is Not Equipped With Fill Riser Containment Sums ❑
Fill Riser Containment Sumps are Pre t,but were Not Tested ❑
Test Method Developed By: 9Sump Manufacturer ❑Industry Standard ❑Professional Engineer
❑Other(Spec)
Test Method Used: ❑Pressure ❑Vacuum ydrostatic
❑Other(Spec)
Test Equipment Used: INCON TS-STS Equipment Resolution: 0.0000
,. Fill Sump#2 Fill Sump#3 Fill Sump#4 Fill Sump#
Sump Diameter: 42" 42" 42"
Sump Depth, 63" 62" 63"
Height from Tank Top to Top of 16" 14" 14"
Highest Piping Penetration:
Height from Tank Top to Lowest 12" 10" 10"
Electrical Penetration:
Condition of sump prior to DRY DRY DRY
testing:
Portion of Sump Tested 18" 18" 18"
Sump Material: - Fiberglass Fiberglass Fiberglass
Wait time between applying 10 Min 10 Min 10 Min
pressure/vacuum/water and
starting test:
Test Start Time: 1:20 11:28 11:28
Initial Reading 4.5840 2.7241 4.8444
Test End Time: 1:35 11:43 11:43
Final Reading 4.5829 2.7231 4.8441
Test Duration: 15 Min 15 Min 15 Min
Change in Reading(RF-R): .0011 .001 .0003
Pass/Fail Threshold or Criteria: .002 .002 r .002
Test:Result. f. ,. ass ° ❑:Fail ass .. ❑:Fail :. ass ❑Fail, ;❑ Pass O Fad
Is there a sensor in the sump? OtYes ❑No es ❑No Yes ❑No ❑Yes ❑No
Does the sensor alarm when // /
either.product or water is C3'Yes ❑No ❑NA Q'Yes ❑No ❑NA Qkes ❑No ❑NA ❑Yes ❑No ❑NA
detected?
Was sensor removed for testing? EdYes ❑No ❑NA es ❑No ❑NA gtLs ❑No ❑NA ❑Yes ❑No ❑NA
Was sensor properly replaced and ft/Yes ❑No ❑NA Okes ❑No ❑NA As ❑No ❑NA ❑Yes ❑No ❑NA
verified functional after testing?
Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests)
SWRCB,January 2002 Page of
9.SPILL/OVERFILL CONTAINMENT BOXES
Facility is Not ped With Spill/Overfill Containment Boxes ❑
Spill/Overfill Containment Boxes are Present,but were Not Tested ❑
Test Method Developed By: ❑Spill Bucket Manufacturer ❑Industry Standard ❑Professional Engineer
❑Other(Spec)
Test Method Used: ❑Pressure ❑Vacuum ❑Hydrostatic
❑Other(Specify)
Test Equipment Used:INCON TS-STS Equipment Resolution:0.0000
Spill Bog#V1 Spill Box#V2 Spill Box#V3 Spill Box#V4
Bucket Diameter. 12" 12" 12"
Bucket Depth: 12" 12" 12"
Wait time between applying
pressure/vacuum/water and 10 MIN 10 M1N 10 MIN
starting test:
Test Start Tine: 2:39 2:56 12:36
Initial Reading(R,): 3.2716 4.4908 2.3751
Test End Tine: 3:54 3:11 12:52
Final Reading(RF): 3.2724 4.4912 2.3749
Test Duration: 15 MIN 15 MIN 15 MIN
Change in Reading(RF-RO: .0008 .0004 .0002
Pass/Fail Threshold or .002 .002 .002
Criteria:
Test Results" Pass C Fail Pass Pass :❑`Fail ❑ Pass ❑Fail
Comments—(include it formation on repairs made prior to testing, and recommended follow-up for failed tests)
S WRCB,January 2002 Page of
9.SPHAJOVERFILL CONTAINMENT BOXES
-Facility is Not Equipped With Spill/Overfill Containment Boxes ❑
Spill/Overfill Containment Boxes are Pirsent,but were Not Tested ❑
Test Method Developed By: C#Spill Bucket Manufacturer ❑Industry Standard ❑Professional Engineer
❑Other(Spec)
Test Method Used: ❑Pressure ❑Vacuum Hydrostatic
❑Other(Spec)
Test Equipment Used:INCON TS-STS Equipment Resolution:0.0000
J Spill Box#1 Spill Box#2 Spill Box#3 Spill Box#4
Bucket Diameter. 12" 12" 12" 12"
Bucket Depth: 12" 12" 12" 12"
Wait time between applying
pressure/vacuum/water and 10 MIN 10 MIN 10 MIN 10 MIN
starting test:
Test Start Time: 2:39 2:39 12:36 12:36
Initial Reading M: 3.5356 3.5876 3.0359 3.8706
Test End Time: 2:54 2:54 12:52 12:52
Final Reading(RF): 3.5360 3.5883 3.0359 3.8706
Test Duration: 15 MIN 15 MIN 15 MIN 15 MIN
Change in Reading(RF-RO: .0006 .0007 0 0
Pass/Fail Threshold or .002 .002 .002 .002
Criteria:
Test Result: Pass .°`�Fail Pass ❑Fail Pass _ ❑Fail Pass, o Fail
Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests)
FASTNIP 36; FASTRIP 367 FASTRIP 367
8001 WHITE LANE. 8001 WHITE LANE 8001 VHITE LANE
BAKERSFIELD BAKERSFIELD BAKERSFIELD
SUNSET CONST SUNSET CONST SUNSET CONST*
1-800-584 6261; 1-800-984 6266 1-800-984-6256
02/23/2011 1114 AM 02/23/2011 12:00 PM 02%23/2011 2:54 PM
_sU11F.LEAK TI: T kEPCtiT SUMP LEAK TES 11 REPORT SUMP LEAK. TEST REPORT
STP 3 STP 3 SPILL 1
TEST STARTED 11:28 AM TEST STARTED 11:45-AM TEST STARTED 9 PM
TEST STARTED 02/23/2011 TEST STARTED 02/23/2011 TEST STARTED 02/23/2011
BEGIN LEVEL 3,7452 IN BEGIN LEVEL 3,7455 IN BEGIN LEVEL 3,5356 IN
END TIME 11:43 AM END TIME 12:00 PM END TIME 2:54 PM
END DATE 02/23/2011 END DATE 02121/2011 -END DATE 02/23/2011
END LEVEL 3,7455 IN END LEVEL 3,7453.IN END LEVEL 3,5360 114
LEAK THRESHOLD 0,002 TN LEAK THRESHOLD 1),002 IN LEAK THRESHOLD 0,0'02 IN
TEST RESULT PASSED TEST RESULT PASSED TEST RESULT PASSED
STP. 2 _STP 2 VSPILLT
TEST STAR'iED .11:28 AM TEST S'1ARTE0 11:45 AM TEST STARTED 2:33 PM
TEST STARTED 02/23112011 TEST STARTED 02/23/2011 TEST STARTED 02i23/2011
BEGIN-LEVEL 5.-C-564 `101 -- BEGIN' LEVEL 5,0563 IN BEGIN LEVEL 3,2716 IN
END TIME 11:43 AM END TIME 12:00 PM E14D TIME 2:54 PM
E14D DATE 02/23/2011 END DATE 02/23/2011 END DATE 02/23/2.011
END LEVEL 5,0563 IN END LEVEL 5.0561 IN END LEVEL 3.2724 IN
LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN LEAK THRESHOLO 0,002 IN
TEST RESULT PASSED TEST RESULT PASSED TEST RESULT PASSED
FILL 3 FILL 3 - SPILL '2
TEST STARTED 11:28 AM TEST STARTED 11:45 AM TEST STARTED 2:30 PM
TEST STARTED 02/23/2011 TEST STARTED 02/23/2011 TEST STARTED 02/23/2011
BEGIN LEVEL 2,7241 IN BEGIN LEVEL. 2,7125 IN BEGIN LEVEL 3,5876 IN
END TIME 11:43 AM END TIME 12:00 PM END TIME` 2:54 PM
END DATE 02/23/2011 END DATE 02/23/2011 END DATE 02,'23/2011
END LEVEL 2,7231 I11 END LEVEL ' 2,7220 IN END LEVEL 3,5883 IN
LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IPA . LEAK THRESHOLD 0,002 IN
TEST RESULT PASSED TEST RESULT PASSED TES1 RESULT PASSED
FILL 4 FILL 4 VSPILL2
}
TEST STARTED 11:28 AM TEST STARTED 11:45 AM, �`} TEST STARTED 2:39 PM
TEST STARTED 02/23/2011 7TEST STARTED 02/23/2011 TEST STARTED 02/23/2011
BEGIN LEVEL 4,8444 IN BEGIN LEVEL 4.84 43 II.1 6EGIN LEVEL 4,4904 IN
ENO TIME 11:43 AM END TIME 12:00 PM END TIME 2:54 PM
END DATE 02%23/2011 END DATE 02/23/2011 END DATE 0212312011
END LEVEL 4,8441 IN "END LEVEL 4.8440 IN END LEVEL 4,4905 IN
LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN
TEST RESULT PASSED TEST. RESULT PASSED TEST RESULT PASSED
FASTRIP 36. FASTRIP 367
FASTRIP. 67 8001 WHITE LANE 8001 61HITE LANE
8001 WHITE LANE BAKERSFIELD BAKERSFIELD
BAKERSFIELD SUNSET CONST -
SUNSET CONST SUNSET CONST.
1-800-984-6266 1-800=984-6266.
1-800-934-6266 - .
02/23/2011 $:32 Ali 02/23/2011 . 9:15 AM. G2I23/?.011 3:51 .PM
SUMP LEAK TEST REPORT SUMP LEAK TEST- REPDRT SUMP LEAK TEST REPORT
UDC1516 UDC1516 VBOX
TEST STARED 3:58 AM. TEST STARTED 3:36 PM
TEST STARTED 9:17 AM S TEST STARTED U2/23/2011
TEST ST 02/'�3/2u11 .
TEST STARTED 02/23/2011 BEGIN LEVEL 3,1 8177 IN
BEGIN LEVEL 3,802'4 Ird BEGIN LEVEL 3,8034 IN
END TIME - 9:32 AM END TIME 9:13 AM END TIME 3:51 PM
,: END DATE 02%23/2011 END DATE 02/23/2011
END DATE 02/23/2011 -END LEVEL 3,8028 IN END LEVEL 3,8177 IN
END LEVEL 3i8622 IN LEAK THRESfiDLD 0,�i02 IN
LEAK THRESHOLD 0;002 Ifd LEAK THRES}i0_D 0,Out itJ
TEST RESULT PASSED TEST RESULT PASSED; - -' TEST RESULT PASSED
UDC1718 UDC1718
TEST STARTED 8:53 AM .,---:-------- -
TEST STARTED 9:17 AM TEST STARTED 02.123/2011 ^ __
TEST STARTED 02/23/2011
BEGIN LEVEL 5. 1415 114 BEGIN LEVEL 5. 1415 IN
END TIME., 9:32 AM END TIME 9:13 AM
END DATE 02/23;2011 END: DATE 02/23/2011
END LEVEL 5,141fi IN END LEVEL 5,1415 IN .
LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,092 IN
TEST RESULT PASSED
TEST RESULT PASSED .
UDC2021 UDC2021
TEST STARTED 9:17 AM TEST STARTED 8:58 AM
TEST STARTED 02/23/2011 TEST STARTED 02/23%2011
BEGIN LEVEL. 4.2509 IN BEGIN LEVEL .4,2513 IN
END TIME 9:32 AM END TIME 9:13 AM
END DATE 02/23/2011 END DATE 02/23/201.1.
END LEVEL 4,2507 IN '- END LEVEL 4,2510 IN
LEAK THRESHOLD 0,002 IN � LEAK THRESHOLD 0:002 IN
TEST RESULT PASSED TEST RESULT PASSED
UDC2223 UDC2223
TEST STARTED 8:58 AM -
TEST STARTED 9:1t AM TEST STARTED 02123/2-011
TEST STARTED 02/23/2011 $EuIN LEVEL 4,7911 IN
BEGIN LEVEL 4,7909 IN °-END TIME 9:13 AM
END TIME 9:32 AM END DATE 02/23/2011
END DATE 02/23/2011 END LEVEL 4,7909 1 i
END LEVEL 4.7908 IN
LEAK THRESHOLD 0,002 IN LEAK_THRESHOLD- 0,002-IN
-- -
TEST RESULT PASSED TEST RESULT PASSED_
FASTRIP 367
8001 WHITE LANE FASTRIP 36! FASTRIP 307
BAKERSFIELD $001 WHITE LANE
SUNSET CONST BAKERSFIELD 8001 WHITE LANE
T BAKERSFIELD
1-800-984-6266
SUNSET CONS, SUNSET CONST
02/23/2011 1:35 PM i-800-984-6266 1-E00-984-0266
TEST 02/23/2011 10:52 AM 02/2312011 10:'35 AM
,EST
SUMP LEAK REPORT
FILL 2 SUMP LEAK TEST REPORT SUMP LEAK.TEST REPORT
UDC1314
TEST STARTED 1:20 PM UQC1314
TEST STARTED 02/23/2011 TEST STARTED 10:37 AM
BEGIN LEVEL 4,5840 IN TEST STARTED 10:20 AM
TEST STARTED 02/23!2011 TEST STARTED 02(231'2011
END TIME 1;35 PM
END DATE 02/2;,/2011 BEGIN LEVEL 7. 1223 iN BEGIN LEVEL -7.1222 IN
END LEVEL 4,5829 IN END TIME 10:57 AM END TIME 10:35 AM
LEAK THRESHOLD 0,002 IN END DATE 02%23/2011 END DATE 02123%2011
END LEVEL 7;1221 IN END LEVEL 7,1223 IN
TEST RESULT PASSED LEAK THRESHOLD 0,002 Ild LEAK ?HRESHDLG 0,002 1N,
TEST RESULT PASSED -0 RESULT PASS
SPILL 4
UDC1920 UDC1920
TEST STARTED 1:20 PM
TEST STARTED 02/23/2011 TEST STARTED 10:37 AM
TEST STARTED 10:20 AM
_ BEGIN LEJEi 0,000Q.IN _ TEST STARTED 02/23/2011 TEST STARTED 02/23/2011
END TIME 1:35 PM BEGIN LEVEL 6,2832 IN
END DATE 02/23/2011 END TIME 10:52 AM BEGIN LEVEL. 6,0:34 AM
END LEVEL 0,0000 IN END TIME° �- �" 10:35 AM--
LEAK THRESHOLD 0;002 IN END DATE 02/23/2011 END DATE ,11123/2011
END LEVEL 6.2826 IN END LEVEL 6,2835 IN
TEST RESULT PASSED LEAK THRESHOLD +),00? IN LEAK TnRESriOLC' U,002 IN
TEST RESULT PASSED TEST RESULT PASSED
SPILL 3
STP 4 STP 4
TEST STARTED 1:20 PM
TEST STARTED 02/23/2011 'TEST STARTED 10:37 AM , c. :
BEGIN LEVEL 0.4520 IN TEST STARTED 10 20 AM
TEST ST ARTED 02/2312011 TEST STARTED 02%23112011
END TIME 1:35 PM BEGIN LEVEL 4.7373 IN
END DATE 02/23/2011 BEGIN LEVEL 4,7372 IN
END TIME 10:5� AM END TIME 10:35 AM
.END LEVEL -0,0565 IN END DATE 02/23/2011 ors
LEAK THRESHOLD 0,002 IN EPJD. GATE U� c362011
END LEVEL C,7372 IN END LEVEL 4,7373 IN
TEST RESULT FAILED LEAK THRESHOLD 0,002 IN
LEAK THRESHOLD 0,002 IN
TEST RESULT PASSED "TEST RESULT PASSED
VSPILL3
FILL 4 FILL 4
TEST STARTED 1:20 PM
TEST STARTED 020/2011 . T,EST.STARTED 10:37 AM
BEGIN LEVEL VOLUME ERR TEST STARTED 02/23!2011 TEST STARTED 10:20 AM
END-TIME 1:21 PM TEST STARTED 02!2:}/2011
BEGIN LEVEL 0',0940 IN BEGIN LEVEL. 4,7007 IN
END DATE 02/2'3/2011 END TIME 10:52 AM
ENO TIME 10:35 AM
END LEVEL 0.0000 IN
.END DATE 02/23/2011. — END DATE 02/23/2011
LEAK THRESHOLD 0.0'j& IN END LEVEL 0,0997 IN END.LEVEL 4.5656 IN _
TEST RESULT ERROR 'LEAK THRESHOLD 0,002 IN
LEAK THRESHOLD 0.00? IN
TEST RESULT INCREASED TEST RESULT FAILED-
FASTRIP 367 FASTRIP 367
8001 RHITE LANE
.BAKERSFIELD 8001 WHITE LANE FASTRIP 367
SUNSET CONST BAKERSFIELD 3001 WHITE LANE
1-800=984-6266: SUNSET CONST BAKERSFIELD
1-800-984-6266 SUNSET CONST
02/23/2011 5:11 PPI 1-800-984-6266
0212312011 1:10 PM
SUMP LEAK TESI REPORT
' 02/23/2011 12:52 FM
SUMP LEAK TEST REPORT
SPILL 1 SUMP LEAK TEST REPORT .
FILL 2
TEST STARTED 2:56 Pm TEST 2
TEST STARTED p TEST STARTED 12:54 FM
2L23/241T TEST STARTED 02/23/2011 TEST STARTED 12:36 PM
BEGIN LEVEL VOLUME ERR BEGIN LEVEL 4,5865 IN..
END TIME 3:00 PM TEST STARTED 02/23/2011
END DATE 02/23/2011 END TIME 1:10 PM BEGIN LEVEL 4,5902 IN
END LEVEL END DATE 02/23/2011 END TIME 12:
LEAK THRE 52 Ph
VOLUME ERR END LEVEL 4,5860 IN END DATE 02/23/2011
SHOL D 0,004 IN LEAK THRESHOLD U,002 IN
TEST RESULT ERROR �° END LEVEL 4.5679 IN
TEST RESULT. PASSED LEAK THRESHOLD 0,002 IN
TEST RESULT FAILED
VSPILLI SPILL 4
TEST STARTED 2:56 PM SPILL 4
TEST STARTED 02/23/2011 TEST STARTED 12:54 Pli
BEGIN LEVEL . .'JiLUr1E ERR TEST STARTED 02/23/2011 TEST STARTED 12:36 PM
END TIME BEGIN LEVEL' 3,8706 IN TEST STARTED 02/23/2011
END DATE 2'� PM END TIME. 1:10 PM BEGIN LEVEL 3,8706 IN
02/23/2011 FEND DATE 02/23/2011 END TIME 12:52 PM
END LEVEL 0,0400 IN END LEVEL 3,8704 IN
LEAK THRESHOLD 0,004 IN END DATE 02/23/2011
TEST RESULT LEAK THRESHOLD 0,002 IN END LEVEE 3,$706 IN
ERROR TEST RESULT PASSED LEAK THE 0,002 IN
TEST RESULT PASSED
SPILL 2
SPILL 3
TEST STARTED 2:56 PM SPILL 3
TEST STARTED. 02123/2011 TEST STARTED 12:54 PM
BEGIN LEVEL VOLUME ERR. TEST STARTED 02/23/2011 TEST STARTED 12:36 PM
END TIME 2.58 BEGIN LEVEL, 3,0357 IN TEST STARTED 02/23/2011
END DATE END TIME 1:10 PM BEGIN LEVEL 3,0359 IN
U2/23/2011i 1 ND DATE 02/23/2011 END TIME 12:52 P.M
D LEVEL 0,0000 IN END.LEVEL 3,0351 IN
LEAK THRESHOLD 0,004 IN END DATE 02%23/'2011
TEST RESULT. LEAK THRESHOLD 0,602 IN END LEVEL 3,4355 IN'
ERROR TEST RESULT PASSED
LEAK THRESHOLD 0,002 IN -
TEST RESULT PASSED
VSPILL2 USPILL3
TEST STARTED 2:56 PM VSPILL3
TEST STARTED 02 2; 11 TEST STARTED 12:54 PM
20
BEGIN LEVEL / ^/ TEST STARTED 02/23/2011 TEST STARTED 12:36 PM
4,4508 IPJ BEGIN LEVEL 2,3751 IN TEST STARTED 02/23/2011
END TIME .3:11 PM END TIME 1:14 PM
END DATE 02%23/2011 BEGIN LEVEL 2,3751 iN
END LEVEL q END DATE 02/23/2011 END TIME 12:52 PM
4312 IN END LEVEL 2,3752 IN
LEAK THRESHOLD 0,002 IN END DATE 42/23/2011
TEST RESULT LEAK THRESHOLD 0,002 IN END LEVEL 2;3(49 IN
PASSED TEST RESULT PASSED
LEAK THRESHOLD 0,002 IN
TEST RESULT PASSED
FASTRIP 367
8001.WHITE LANE
BAKERSFIELD
SUNSET CONST .
1-800-984-6266
02/23/2011 2:38 PM
SUMP LEAK TEST RFPDc''f
SPILL 1
TEST STARTED 2:13 PM
TEST STARTED 02/23/2011
BEGIN,LEVEL 3,5373 IN
END TIME 2:38 PM
END DATE 02/23/2011
END LEVEL 3.5357 IN
LEAK THRESHOLD 0,002 IN
TEST RESULT PASSED
VSPILLI
TEST..STARTED . 2:23 PM
TEST STARTED --02723/2011
-TEST
LEVEL 3,2713 IN
END TIME 2:38 PM'
END DATE 02/23/2011`
END LEVEL 3,2716 IN
LEAK THRESHOLD 0,002 IN
TEST RESULT PASSED
SPILL 2
.TEST STARTED 2:23 PM
TEST STARTED 02/23/2011
BEGIN LEVEL 3,5838 IN
END TIME 2:38 PM
END DATE 02%23/2011
END LEVEL 3,5878 IN
LEAK THRESHOLD 0,002 IN
TEST RESULT PASSED
VSPILL2
TEST STARTED 2:23 PM
TEST STARTED 0212312611
BEGIN LEVEL 4,4927 IN
END TIME 2:38 PM
END DATE 02/23/2011
END LEVEL d,4906 IN
LEAK THRESHOLD 0,002 IN
TEST RESULT FAILED