Loading...
HomeMy WebLinkAboutSB989 2011 SWRCB,January 2002 I IIIIIII IIIIIIII IIII 45 �e P of IE Secondary Containment Testing Report Form This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the appropriate pages of this form to report results for all components tested The completed form,written test procedures, and printouts from tests(rf applicable),should be provided to the facility owner/operator for submittal to the local regulatory agency. 1. FACILITY INFORMATION Facility Name: Fastrip#367 Date of Testing: 2/23/11 Facility Address: 8001 White Lane Bakersfield CA Facility Contact: Jaco Hill Phone: 1-661-393-7000 Date Local Agency Was Notified of Testing: 2/16/11 Name of Local Agency Inspector(f present during testing): 2. TESTING CONTRACTOR INFORMATION Company Name: Sunset Mechanical Technician Conducting Test: Scott Olinger Credentials: CSLB Licensed Contractor ❑SWRCB Licensed Tank Tester License Type: C-36 C-10 License Number. 589517 Manufacturer Trainine Manufacturer Component(s) Date Training Expires Incon TS-STS INSPECTION EQUIPMENT 1/18/13 VEEDER ROOT MONITORING SYSTEM 1/15/12 ICC CAL UST SERVICE TECH 1/18/13 3. SUMMARY OF TEST RESULTS Component Pass Fail Not Repairs Component Pass Fail Not Repairs Tested Made Tested Made UDC# 13-14 X ANN SPACE#2 X UDC# 15-16 X ANN SPACE#3 X UDC# 17-18 X ANN SPACE#4 X UDC# 19-20 X PIPING RUN#1 X UDC#21-22 X PIPING RUN#2 X UDC #23-24 X PIPING RUN#3 X STP 42 X PIPING RUN#4 X STP#3 X PIPING RUN#5 X STP#4 X PIPING RUN#6 X FILL#2 X PIPING RUN#7 X FILL#3 X PIPING RUN#8 X FILL#4 X If hydrostatic testing was performed,describe what was done with the water after completion of tests: CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING To the best of my knowledge,the cts o in this document are accurate and in full compliance with legal requirements Technician's Signature I IIIIIII VIII II II Date: 2-23-11 46 IE SWRCB,January 2002 Page of Secondary Containment Testing Report Form Thisform is intendedfor use by contractors performingperiodic testing of USTsecondary containment systems. Use the appropriate pages of this form to report results for all components tested The completed form, written test procedures, and printouts from tests(f applicable),should be provided to the facility owner/operator for submittal to the local regulatory agency. 1. FACILITY INFORMATION Facility Name: Fastrip#366 Date of Testing: 2/24/11 Facility Address: 8001 White Lane Bakersfield CA Facility Contact: Jaco Hill Phone: 1-661-393-7000 Date Local Agency Was Notified of Testing: 2116/11 Name of Local Agency Inspector(fpresent during testing): 2. TESTING CONTRACTOR INFORMATION Company Name: Sunset Mechanical Technician Conduc ' g Test: Scott Olinger Credentials: A CSLB Licensed Contractor ❑SWRCB Licensed Tank Tester License Type. C-36 C-10 License Number. 589517 Manufacturer Training Manufacturer Component(s) Date Training Expires Incon TS-STS INSPECTION EQUIPMENT 1/18/13 VEEDER ROOT MONITORING SYSTEM 1/15/12 ICC CAL UST SERVICE TECH 1/18/13 3. SUMMARY OF TEST RESULTS Not Repairs Not Repairs Component Pass Fail Tested Made Component Pass Fail Tested Made SPILL#1 X SPILL#2 X SPILL#3 X SPILL#4 X V SPILL#1 X V SPILL#2 X V SPILL#3 X If hydrostatic testing was performed,describe what was done with the water after completion of tests: CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING To the best of my knowledge,the t ed s this document are accurate and in full compliance with legal requirements Technician's Signature: Date: 2-23-11 SWRCB,January 2002 Page of 4. TANK ANNULAR TESTING Test Method Developed By: Tank Manufacturer ❑Industry Standard ❑Professional Engineer ❑Other(Spec) Test Method Used: ❑Pressure Vacuum ❑Hydrostatic ❑Other(Specify) Test Equipment Used:4"Gauge with Certs Equipment Resolution: 0-30 A Tank#1 Tank#2 Tank#3 Tank#4 Is Tank Exempt From Testing?1 Yes 0 No ❑Yes WNo ❑Yes No ❑Yes No Tank Capacity: 12,000 12,000 12,000 12,000 Tank Material: FIBERLASSS GLASS/STEEL GLASS/STEEL GLASS/STEEL Tank Manufacturer. ZERXES MODERN MODERN MODERN Product Stored: UNLEADED UNLEADED PREMIUM DIESEL Wait time between applying pressure/vacuum/water and 10 MIN 10 MIN 10 MIN stattin g test: Test Start Time: 9:30 9:30 9:30 Initial Reading(R1): IOHG IOHG 10HG Test End Time: 10:30 10:30 10:30 Final Reading(RF): l OHG l OHG IOHG Test Duration: 1 HR 1 HR I HR Change in Reading(RF-R): 0 0 0 Pass/Fail Threshold or Criteria: 0 0 0 Test Resnlf D.Pass ,'O Fail Pass:": O Fail Pass C:Fail Pass O;Fail Was sensor removed for testing? ❑Yes ❑No 0 NA es ❑No ❑NA Yes ❑No ❑NA MYes ❑No ❑NA Was sensor properly replaced and verified functional after testis ? Yes No NA es ❑No ❑NA Yes ❑No ❑NA es ❑No ❑NA Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) ' Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary containment,such as systems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment testing. (California Code of Regulations,Title 23,Section 2637(a)(6)) SWRCB,January 2002 Page of 5. SECONDARY PIPE TESTING Test Method Developed By: &Piping Manufacturer ❑Industry Standard ❑Professional Engineer ❑Pther(Spec) Test Method Used: 9Pressure ❑Vacuum ❑Hydrostatic ❑Other(Spec) Test Equipment Used:4"Gel Filled Gauge W/Certs Equipment Resolution: 0-15 Piping Run#1 Piping Run#2 Piping Run#3 Piping Run#4 Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass Piping Manufacturer. AO Smith AO Smith AO Smith AO Smith Piping Diameter: 3" 3" 3" 3"&4" Length of Piping Run: 180' 170' 160' 180' Product Stored: UNL PREM DIESEL VAPOR Method and location of Test Boot at UDC& Test Boot at UDC& Test Boot at UDC& Test Boot at UDC& piping-run isolation: STP STP STP STP Wait time between applying pressure/vacuum/water and 10 Min 10 Min 10 Min 10 Min starting test: Test Start Time: 9:15 am 9:15 am 9:15 am 9:15 am Initial Reading(Ri): 5.1 5.0 5.0 5.1 Test End Time: 10:15 am 10:15 am 10:15 am 10:15 am Final Reading(RF): 5.1 5.0 5.0 5.1 Test Duration: 1 Hour 1 Hour 1 Hour 1 Hour Change in Reading(RF-R,): 0 0 0 0 Pass/Fail Threshold or 0 0 0 0 Criteria: Test.Result Pass ❑Fail Pass.. (I Fail Pass ,.b Fail s Passe Fail Comments—(include information on repairs made prior to testing; and recommended follow-up for failed tests) SWRCB,January 2002 Page of 5. SECONDARY PIPE TESTING Test Method Developed By: tf Piping Manufacturer ❑Industry Standard ❑Professional Engineer ❑Other(Specify) Test Method Used: dpressure ❑Vacuum ❑Hydrostatic ❑Other(Specify) Test Equipment Used:4"Get Filled Gauge W/Certs Equipment Resolution: 0-15 M'- M—Lml I! Piping Run#5 Piping Run#6 Piping Run#7 Piping Run#8 Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass Piping Manufacturer. AO Smith AO Smith AO Smith AO Smith Piping Diameter 3" 3" 3" 3" Length of Piping Run: 60' 70' 80' 90' Product Stored: UNL UNL PREM DIESEL Method and location of Test Boot at UDC& Test Boot at UDC& Test Boot at UDC& Test Boot at UDC& piping-run isolation: STP STP STP STP Wait time between applying pressure/vacuum/water and 10 Min 10 Min 10 Min 10 Min starting test: Test Start Time: 11:00 am 11:00 am 11:00 am 11:00 am Initial Reading W: 5.0 5.2 5.2 5.2 Test End Time: 12:00 am 12:00 am 12:00 am 12:00 am Final Reading(RF): 5.0 5.2 5.2 5.2 Test Duration: 1 Hour 1 Hour 1 Hour 1 Hour Change in Reading(RF-R): 0 0 0 0 Pass/Fail Threshold or 0 0 0 0 Criteria: Test Result; Pass D Fail Pass l7 Fail Pass ,O,Fa�I.'. Pass: O Fail, ; Comments—(include irrfarmation on repairs made prior to testing; and recommended follow-up for failed tests) SWRCB,January 2002 Page of 6. PIPING SUMP TESTING Test Method Developed By: Sump Manufacturer 0 Industry Standard 0 Professional Engineer O Other(Specify) Test Method Used: ❑Pressure ❑Vacuum OtHydrostatic O Other(Specify) Test Equipment Used: Incon TS-STS Equipment Resolution: 0.0000 Samp#2 STP Sump#3 STP Sump#4 STP Sump# Sump Diameter. 48" 48" 48" Sump Depth: 61" 60" 59" Sump Material: Fiberglass Fiberglass Fiberglass Height from Tank Top to Top of 14" 16" 16" HighestPiping Penetration: Height from Tank Top to Lowest 14" 16" 16" Electrical Penetration: Condition of sump prior to testing: DRY DRY DRY Portion of Sump Tested' 18" 18" 18" Does turbine shut down when / sump sensor detects liquid(both 14 Yes ❑No ❑NA D'Yes ❑No ❑NA R/Yes ❑No O NA O Yes ❑No ❑NA product and water)?* Turbine shutdown response time 20 Sec 20 Sec 20 Sec Is system programmed for fail-safe shutdown?' J Yes ❑No ❑NA (Yes O No ❑NA ►/Y es ❑No ❑NA O Yes O No ❑NA Was a -safe verified to be operational?* VYes ❑No DNA //Yes O No DNA I jYes ❑No ❑NA ❑Yes ❑No ❑NA Wait time between applying pressure/vacuum/water and starting 15 Min 15 Min 15 Min test: Test Start Time: 11:28 11:28 10:20 Initial Reading(Ri): 5.0564 3.7462 4.7372 Test End Time: 11:43 11:43 10:35 Final Reading(RF): 5.0563 3.7455 4.7373 Test Duration: 15 MIN 15 MIN 15 MIN Change in Reading(RF-R): .0001 .0007 .0001 Pass/Fait Threshold or Criteria: .002 .002 .002 Test Result Pass ;'O Fail✓ Pass.` ❑Fail Pass ❑Fail ;❑ Pass= '0 Fail Was sensor removed for testing? es 0 No O NA Yes ❑No El NA alfes ❑No ❑NA 0 Yes ❑No ❑NA Was sensor properly replaced and Yes O No ❑NA Yes ❑No ❑NA es ❑No 0 NA O Yes O No O NA verified functional after testis ? Comments—(include Information on repairs made prior to testing: and recommendedfollow-up forfailed tests) 'If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an asterisk(s)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) SWRCB,January 2002 Page of 7. UNDER- ISPENSER CONTAINMENT WDO TESTING Test Method Developed By: 9UDC Manufacturer ❑Industry Standard ❑Professional Engineer ❑Other(Spec) Test Method Used: ❑Pressure ❑Vacuum Hydrostatic ❑Other(Spec) Test Equipment Used: INCON TS-STS Equipment Resolution:0.0000 H UDC#13-14 UDC#15-16 UDC#17-18 UDC#19-20 UDC Manufacturer. Western Western Western Western UDC Material: Fiberglass Fiberglass Fiberglass Fiberglass UDC Depth: 31" 31" 31" 31" Height from UDC Bottom to Top 12" 12" 12" 12" of Highest Piping Penetration: Height from UDC Bottom to 6" 6" 6" 6" Lowest Electrical Penetration: Condition of UDC prior to DRY DRY DRY DRY testing: Portion of UDC Tested 14" 14" 14" 14" Does turbine shut down when l7// // ! UDC sensor detects liquid(both 4/Yes ❑No ❑NA Yes 13 No ❑NA As ❑No ❑NA Y Yes ❑No ❑NA product and water)?' Turbine shutdown response time 20 SEC 20 SEC 20 SEC 20 SEC CT// Is system programmed for fail- yes ❑No ❑NA Yes ❑No ❑NA 5kes ❑No ❑NA Yes ❑No ❑NA safe shutdown?* // [� Was fail-safe verified to be WYes 11 No ❑NA es ❑No ❑NA C�}I es ❑No ❑NA U7 es ❑No ❑NA operational?* Wait time between applying 10 Min 10 Min 10 Min 10 Min pressure/vacuum/water and starting test Test Start Time: 10:37 8:58 8:58 10:37 Initial Readin (R): 7.1223 3.8034 5.1415 62832 Test End Time: 10:52 9:13 9:13 10:52 Final Reading 7.1221 3.8028 5.1415 62826 Test Duration: 15 Min 15 Min 15 Min 15 Min Change in Reading RF-R : .0002 .0006 0 .0006 Pass/Fail Threshold or Criteria: .002 .002 .002 .002 -Test Restilf :Pass'. ,"❑Fail' Pass'"❑Fail Pass:,`. p Fail Pas§. C -Fail Was sensor removed for testing? EfYes ❑No ❑NA _L-es ❑No ❑NA es ❑No ❑NA Yes ❑No ❑NA Was sensor properly replaced and R Yes ❑No ❑NA @Y `es ❑No ❑NA f'Yes ❑No ❑NA es ❑No ❑NA verified functional after testis 7 Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) If the entire depth of the UDC is not tested,specify how much was tested. If the answer to My of the questions indicated with an asterisk(')is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) SWRCB,January 2002 Page of 7. ITT -DISPENSER CONTAINMENT aTQ TESTING Test Method Developed By: "UDC Manufacturer ❑Industry Standard ❑Professional Engineer D Other(Specify) Test Method Used: ❑Pressure ❑Vacuum WHydrostatic ❑Other(Specify) Test Equipment Used: INCON TS-STS Equipment Resolution:0.0000 UDC#9-10 UDC#11-12 UDC# UDC# UDC Manufacturer: Western Western UDC Material: Fiberglass Fiberglass UDC Depth: 31" 31" Height from UDC Bottom to Top 12" 12" of Highest Piping Penetration: Height from UDC Bottom to 6" 6" Lowest Electrical Penetration: Condition of UDC prior to DRY DRY testing: Portion of UDC Tested 14" 14" Does turbine shut down when / UDC sensor detects liquid(both (/Yes ❑No ❑NA Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA product and water)?. Turbine shutdown response time 20 SEC 20 SEC Is system programmed for fail- p�Yes ❑No D NA Yes ❑No DNA ❑Yes D No ❑NA D Yes D No D NA safe shutdown?* // Was fail-safe verified to be y ❑No D NA D�Yes ❑No ❑NA ❑Yes ❑No 11 NA D Yes D No ❑NA operational?* Wait time between applying 10 Min 10 Min pressure/vacuum/water and starting test Test Start Time: 8:58 8:58 Initial Readin 4.2513 4.7911 Test End Time: 9:13 9:13 Final Reading RF): 4.2510 4.7909 Test Duration: 15 Min 15 Min Change in Readin (RF- .0003 .0002 Pass/Fail Threshold or Criteria: .002 .002 Test_Result. Pass ':,❑Fail Pass ❑Fail: 0 Pass:' ❑:Fall ❑ Pass ❑=Fail Was sensor removed for testing? es ❑No D NA Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No D NA fsensor properly replaced and Yes ❑No ❑NA es ❑No ❑NA D Yes ❑No D NA D Yes D No ❑NA fied functional after testing? Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) 'If the entire depth of the UDC is not tested,specify how much was tested If the answer to Oy of the questions indicated with an asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) SWRCB,January 2002 Page of 8. FILL RISER CONTAINMENT SUMP TESTING Facility is Not Equipped With Fill Riser Containment Sums ❑ Fill Riser Containment Sumps are Pre t,but were Not Tested ❑ Test Method Developed By: 9Sump Manufacturer ❑Industry Standard ❑Professional Engineer ❑Other(Spec) Test Method Used: ❑Pressure ❑Vacuum ydrostatic ❑Other(Spec) Test Equipment Used: INCON TS-STS Equipment Resolution: 0.0000 ,. Fill Sump#2 Fill Sump#3 Fill Sump#4 Fill Sump# Sump Diameter: 42" 42" 42" Sump Depth, 63" 62" 63" Height from Tank Top to Top of 16" 14" 14" Highest Piping Penetration: Height from Tank Top to Lowest 12" 10" 10" Electrical Penetration: Condition of sump prior to DRY DRY DRY testing: Portion of Sump Tested 18" 18" 18" Sump Material: - Fiberglass Fiberglass Fiberglass Wait time between applying 10 Min 10 Min 10 Min pressure/vacuum/water and starting test: Test Start Time: 1:20 11:28 11:28 Initial Reading 4.5840 2.7241 4.8444 Test End Time: 1:35 11:43 11:43 Final Reading 4.5829 2.7231 4.8441 Test Duration: 15 Min 15 Min 15 Min Change in Reading(RF-R): .0011 .001 .0003 Pass/Fail Threshold or Criteria: .002 .002 r .002 Test:Result. f. ,. ass ° ❑:Fail ass .. ❑:Fail :. ass ❑Fail, ;❑ Pass O Fad Is there a sensor in the sump? OtYes ❑No es ❑No Yes ❑No ❑Yes ❑No Does the sensor alarm when // / either.product or water is C3'Yes ❑No ❑NA Q'Yes ❑No ❑NA Qkes ❑No ❑NA ❑Yes ❑No ❑NA detected? Was sensor removed for testing? EdYes ❑No ❑NA es ❑No ❑NA gtLs ❑No ❑NA ❑Yes ❑No ❑NA Was sensor properly replaced and ft/Yes ❑No ❑NA Okes ❑No ❑NA As ❑No ❑NA ❑Yes ❑No ❑NA verified functional after testing? Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) SWRCB,January 2002 Page of 9.SPILL/OVERFILL CONTAINMENT BOXES Facility is Not ped With Spill/Overfill Containment Boxes ❑ Spill/Overfill Containment Boxes are Present,but were Not Tested ❑ Test Method Developed By: ❑Spill Bucket Manufacturer ❑Industry Standard ❑Professional Engineer ❑Other(Spec) Test Method Used: ❑Pressure ❑Vacuum ❑Hydrostatic ❑Other(Specify) Test Equipment Used:INCON TS-STS Equipment Resolution:0.0000 Spill Bog#V1 Spill Box#V2 Spill Box#V3 Spill Box#V4 Bucket Diameter. 12" 12" 12" Bucket Depth: 12" 12" 12" Wait time between applying pressure/vacuum/water and 10 MIN 10 M1N 10 MIN starting test: Test Start Tine: 2:39 2:56 12:36 Initial Reading(R,): 3.2716 4.4908 2.3751 Test End Tine: 3:54 3:11 12:52 Final Reading(RF): 3.2724 4.4912 2.3749 Test Duration: 15 MIN 15 MIN 15 MIN Change in Reading(RF-RO: .0008 .0004 .0002 Pass/Fail Threshold or .002 .002 .002 Criteria: Test Results" Pass C Fail Pass Pass :❑`Fail ❑ Pass ❑Fail Comments—(include it formation on repairs made prior to testing, and recommended follow-up for failed tests) S WRCB,January 2002 Page of 9.SPHAJOVERFILL CONTAINMENT BOXES -Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ Spill/Overfill Containment Boxes are Pirsent,but were Not Tested ❑ Test Method Developed By: C#Spill Bucket Manufacturer ❑Industry Standard ❑Professional Engineer ❑Other(Spec) Test Method Used: ❑Pressure ❑Vacuum Hydrostatic ❑Other(Spec) Test Equipment Used:INCON TS-STS Equipment Resolution:0.0000 J Spill Box#1 Spill Box#2 Spill Box#3 Spill Box#4 Bucket Diameter. 12" 12" 12" 12" Bucket Depth: 12" 12" 12" 12" Wait time between applying pressure/vacuum/water and 10 MIN 10 MIN 10 MIN 10 MIN starting test: Test Start Time: 2:39 2:39 12:36 12:36 Initial Reading M: 3.5356 3.5876 3.0359 3.8706 Test End Time: 2:54 2:54 12:52 12:52 Final Reading(RF): 3.5360 3.5883 3.0359 3.8706 Test Duration: 15 MIN 15 MIN 15 MIN 15 MIN Change in Reading(RF-RO: .0006 .0007 0 0 Pass/Fail Threshold or .002 .002 .002 .002 Criteria: Test Result: Pass .°`�Fail Pass ❑Fail Pass _ ❑Fail Pass, o Fail Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) FASTNIP 36; FASTRIP 367 FASTRIP 367 8001 WHITE LANE. 8001 WHITE LANE 8001 VHITE LANE BAKERSFIELD BAKERSFIELD BAKERSFIELD SUNSET CONST SUNSET CONST SUNSET CONST* 1-800-584 6261; 1-800-984 6266 1-800-984-6256 02/23/2011 1114 AM 02/23/2011 12:00 PM 02%23/2011 2:54 PM _sU11F.LEAK TI: T kEPCtiT SUMP LEAK TES 11 REPORT SUMP LEAK. TEST REPORT STP 3 STP 3 SPILL 1 TEST STARTED 11:28 AM TEST STARTED 11:45-AM TEST STARTED 9 PM TEST STARTED 02/23/2011 TEST STARTED 02/23/2011 TEST STARTED 02/23/2011 BEGIN LEVEL 3,7452 IN BEGIN LEVEL 3,7455 IN BEGIN LEVEL 3,5356 IN END TIME 11:43 AM END TIME 12:00 PM END TIME 2:54 PM END DATE 02/23/2011 END DATE 02121/2011 -END DATE 02/23/2011 END LEVEL 3,7455 IN END LEVEL 3,7453.IN END LEVEL 3,5360 114 LEAK THRESHOLD 0,002 TN LEAK THRESHOLD 1),002 IN LEAK THRESHOLD 0,0'02 IN TEST RESULT PASSED TEST RESULT PASSED TEST RESULT PASSED STP. 2 _STP 2 VSPILLT TEST STAR'iED .11:28 AM TEST S'1ARTE0 11:45 AM TEST STARTED 2:33 PM TEST STARTED 02/23112011 TEST STARTED 02/23/2011 TEST STARTED 02i23/2011 BEGIN-LEVEL 5.-C-564 `101 -- BEGIN' LEVEL 5,0563 IN BEGIN LEVEL 3,2716 IN END TIME 11:43 AM END TIME 12:00 PM E14D TIME 2:54 PM E14D DATE 02/23/2011 END DATE 02/23/2011 END DATE 02/23/2.011 END LEVEL 5,0563 IN END LEVEL 5.0561 IN END LEVEL 3.2724 IN LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN LEAK THRESHOLO 0,002 IN TEST RESULT PASSED TEST RESULT PASSED TEST RESULT PASSED FILL 3 FILL 3 - SPILL '2 TEST STARTED 11:28 AM TEST STARTED 11:45 AM TEST STARTED 2:30 PM TEST STARTED 02/23/2011 TEST STARTED 02/23/2011 TEST STARTED 02/23/2011 BEGIN LEVEL 2,7241 IN BEGIN LEVEL. 2,7125 IN BEGIN LEVEL 3,5876 IN END TIME 11:43 AM END TIME 12:00 PM END TIME` 2:54 PM END DATE 02/23/2011 END DATE 02/23/2011 END DATE 02,'23/2011 END LEVEL 2,7231 I11 END LEVEL ' 2,7220 IN END LEVEL 3,5883 IN LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IPA . LEAK THRESHOLD 0,002 IN TEST RESULT PASSED TEST RESULT PASSED TES1 RESULT PASSED FILL 4 FILL 4 VSPILL2 } TEST STARTED 11:28 AM TEST STARTED 11:45 AM, �`} TEST STARTED 2:39 PM TEST STARTED 02/23/2011 7TEST STARTED 02/23/2011 TEST STARTED 02/23/2011 BEGIN LEVEL 4,8444 IN BEGIN LEVEL 4.84 43 II.1 6EGIN LEVEL 4,4904 IN ENO TIME 11:43 AM END TIME 12:00 PM END TIME 2:54 PM END DATE 02%23/2011 END DATE 02/23/2011 END DATE 0212312011 END LEVEL 4,8441 IN "END LEVEL 4.8440 IN END LEVEL 4,4905 IN LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED TEST. RESULT PASSED TEST RESULT PASSED FASTRIP 36. FASTRIP 367 FASTRIP. 67 8001 WHITE LANE 8001 61HITE LANE 8001 WHITE LANE BAKERSFIELD BAKERSFIELD BAKERSFIELD SUNSET CONST - SUNSET CONST SUNSET CONST. 1-800-984-6266 1-800=984-6266. 1-800-934-6266 - . 02/23/2011 $:32 Ali 02/23/2011 . 9:15 AM. G2I23/?.011 3:51 .PM SUMP LEAK TEST REPORT SUMP LEAK TEST- REPDRT SUMP LEAK TEST REPORT UDC1516 UDC1516 VBOX TEST STARED 3:58 AM. TEST STARTED 3:36 PM TEST STARTED 9:17 AM S TEST STARTED U2/23/2011 TEST ST 02/'�3/2u11 . TEST STARTED 02/23/2011 BEGIN LEVEL 3,1 8177 IN BEGIN LEVEL 3,802'4 Ird BEGIN LEVEL 3,8034 IN END TIME - 9:32 AM END TIME 9:13 AM END TIME 3:51 PM ,: END DATE 02%23/2011 END DATE 02/23/2011 END DATE 02/23/2011 -END LEVEL 3,8028 IN END LEVEL 3,8177 IN END LEVEL 3i8622 IN LEAK THRESfiDLD 0,�i02 IN LEAK THRESHOLD 0;002 Ifd LEAK THRES}i0_D 0,Out itJ TEST RESULT PASSED TEST RESULT PASSED; - -' TEST RESULT PASSED UDC1718 UDC1718 TEST STARTED 8:53 AM .,---:-------- - TEST STARTED 9:17 AM TEST STARTED 02.123/2011 ^ __ TEST STARTED 02/23/2011 BEGIN LEVEL 5. 1415 114 BEGIN LEVEL 5. 1415 IN END TIME., 9:32 AM END TIME 9:13 AM END DATE 02/23;2011 END: DATE 02/23/2011 END LEVEL 5,141fi IN END LEVEL 5,1415 IN . LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,092 IN TEST RESULT PASSED TEST RESULT PASSED . UDC2021 UDC2021 TEST STARTED 9:17 AM TEST STARTED 8:58 AM TEST STARTED 02/23/2011 TEST STARTED 02/23%2011 BEGIN LEVEL. 4.2509 IN BEGIN LEVEL .4,2513 IN END TIME 9:32 AM END TIME 9:13 AM END DATE 02/23/2011 END DATE 02/23/201.1. END LEVEL 4,2507 IN '- END LEVEL 4,2510 IN LEAK THRESHOLD 0,002 IN � LEAK THRESHOLD 0:002 IN TEST RESULT PASSED TEST RESULT PASSED UDC2223 UDC2223 TEST STARTED 8:58 AM - TEST STARTED 9:1t AM TEST STARTED 02123/2-011 TEST STARTED 02/23/2011 $EuIN LEVEL 4,7911 IN BEGIN LEVEL 4,7909 IN °-END TIME 9:13 AM END TIME 9:32 AM END DATE 02/23/2011 END DATE 02/23/2011 END LEVEL 4,7909 1 i END LEVEL 4.7908 IN LEAK THRESHOLD 0,002 IN LEAK_THRESHOLD- 0,002-IN -- - TEST RESULT PASSED TEST RESULT PASSED_ FASTRIP 367 8001 WHITE LANE FASTRIP 36! FASTRIP 307 BAKERSFIELD $001 WHITE LANE SUNSET CONST BAKERSFIELD 8001 WHITE LANE T BAKERSFIELD 1-800-984-6266 SUNSET CONS, SUNSET CONST 02/23/2011 1:35 PM i-800-984-6266 1-E00-984-0266 TEST 02/23/2011 10:52 AM 02/2312011 10:'35 AM ,EST SUMP LEAK REPORT FILL 2 SUMP LEAK TEST REPORT SUMP LEAK.TEST REPORT UDC1314 TEST STARTED 1:20 PM UQC1314 TEST STARTED 02/23/2011 TEST STARTED 10:37 AM BEGIN LEVEL 4,5840 IN TEST STARTED 10:20 AM TEST STARTED 02/23!2011 TEST STARTED 02(231'2011 END TIME 1;35 PM END DATE 02/2;,/2011 BEGIN LEVEL 7. 1223 iN BEGIN LEVEL -7.1222 IN END LEVEL 4,5829 IN END TIME 10:57 AM END TIME 10:35 AM LEAK THRESHOLD 0,002 IN END DATE 02%23/2011 END DATE 02123%2011 END LEVEL 7;1221 IN END LEVEL 7,1223 IN TEST RESULT PASSED LEAK THRESHOLD 0,002 Ild LEAK ?HRESHDLG 0,002 1N, TEST RESULT PASSED -0 RESULT PASS SPILL 4 UDC1920 UDC1920 TEST STARTED 1:20 PM TEST STARTED 02/23/2011 TEST STARTED 10:37 AM TEST STARTED 10:20 AM _ BEGIN LEJEi 0,000Q.IN _ TEST STARTED 02/23/2011 TEST STARTED 02/23/2011 END TIME 1:35 PM BEGIN LEVEL 6,2832 IN END DATE 02/23/2011 END TIME 10:52 AM BEGIN LEVEL. 6,0:34 AM END LEVEL 0,0000 IN END TIME° �- �" 10:35 AM-- LEAK THRESHOLD 0;002 IN END DATE 02/23/2011 END DATE ,11123/2011 END LEVEL 6.2826 IN END LEVEL 6,2835 IN TEST RESULT PASSED LEAK THRESHOLD +),00? IN LEAK TnRESriOLC' U,002 IN TEST RESULT PASSED TEST RESULT PASSED SPILL 3 STP 4 STP 4 TEST STARTED 1:20 PM TEST STARTED 02/23/2011 'TEST STARTED 10:37 AM , c. : BEGIN LEVEL 0.4520 IN TEST STARTED 10 20 AM TEST ST ARTED 02/2312011 TEST STARTED 02%23112011 END TIME 1:35 PM BEGIN LEVEL 4.7373 IN END DATE 02/23/2011 BEGIN LEVEL 4,7372 IN END TIME 10:5� AM END TIME 10:35 AM .END LEVEL -0,0565 IN END DATE 02/23/2011 ors LEAK THRESHOLD 0,002 IN EPJD. GATE U� c362011 END LEVEL C,7372 IN END LEVEL 4,7373 IN TEST RESULT FAILED LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED "TEST RESULT PASSED VSPILL3 FILL 4 FILL 4 TEST STARTED 1:20 PM TEST STARTED 020/2011 . T,EST.STARTED 10:37 AM BEGIN LEVEL VOLUME ERR TEST STARTED 02/23!2011 TEST STARTED 10:20 AM END-TIME 1:21 PM TEST STARTED 02!2:}/2011 BEGIN LEVEL 0',0940 IN BEGIN LEVEL. 4,7007 IN END DATE 02/2'3/2011 END TIME 10:52 AM ENO TIME 10:35 AM END LEVEL 0.0000 IN .END DATE 02/23/2011. — END DATE 02/23/2011 LEAK THRESHOLD 0.0'j& IN END LEVEL 0,0997 IN END.LEVEL 4.5656 IN _ TEST RESULT ERROR 'LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0.00? IN TEST RESULT INCREASED TEST RESULT FAILED- FASTRIP 367 FASTRIP 367 8001 RHITE LANE .BAKERSFIELD 8001 WHITE LANE FASTRIP 367 SUNSET CONST BAKERSFIELD 3001 WHITE LANE 1-800=984-6266: SUNSET CONST BAKERSFIELD 1-800-984-6266 SUNSET CONST 02/23/2011 5:11 PPI 1-800-984-6266 0212312011 1:10 PM SUMP LEAK TESI REPORT ' 02/23/2011 12:52 FM SUMP LEAK TEST REPORT SPILL 1 SUMP LEAK TEST REPORT . FILL 2 TEST STARTED 2:56 Pm TEST 2 TEST STARTED p TEST STARTED 12:54 FM 2L23/241T TEST STARTED 02/23/2011 TEST STARTED 12:36 PM BEGIN LEVEL VOLUME ERR BEGIN LEVEL 4,5865 IN.. END TIME 3:00 PM TEST STARTED 02/23/2011 END DATE 02/23/2011 END TIME 1:10 PM BEGIN LEVEL 4,5902 IN END LEVEL END DATE 02/23/2011 END TIME 12: LEAK THRE 52 Ph VOLUME ERR END LEVEL 4,5860 IN END DATE 02/23/2011 SHOL D 0,004 IN LEAK THRESHOLD U,002 IN TEST RESULT ERROR �° END LEVEL 4.5679 IN TEST RESULT. PASSED LEAK THRESHOLD 0,002 IN TEST RESULT FAILED VSPILLI SPILL 4 TEST STARTED 2:56 PM SPILL 4 TEST STARTED 02/23/2011 TEST STARTED 12:54 Pli BEGIN LEVEL . .'JiLUr1E ERR TEST STARTED 02/23/2011 TEST STARTED 12:36 PM END TIME BEGIN LEVEL' 3,8706 IN TEST STARTED 02/23/2011 END DATE 2'� PM END TIME. 1:10 PM BEGIN LEVEL 3,8706 IN 02/23/2011 FEND DATE 02/23/2011 END TIME 12:52 PM END LEVEL 0,0400 IN END LEVEL 3,8704 IN LEAK THRESHOLD 0,004 IN END DATE 02/23/2011 TEST RESULT LEAK THRESHOLD 0,002 IN END LEVEE 3,$706 IN ERROR TEST RESULT PASSED LEAK THE 0,002 IN TEST RESULT PASSED SPILL 2 SPILL 3 TEST STARTED 2:56 PM SPILL 3 TEST STARTED. 02123/2011 TEST STARTED 12:54 PM BEGIN LEVEL VOLUME ERR. TEST STARTED 02/23/2011 TEST STARTED 12:36 PM END TIME 2.58 BEGIN LEVEL, 3,0357 IN TEST STARTED 02/23/2011 END DATE END TIME 1:10 PM BEGIN LEVEL 3,0359 IN U2/23/2011i 1 ND DATE 02/23/2011 END TIME 12:52 P.M D LEVEL 0,0000 IN END.LEVEL 3,0351 IN LEAK THRESHOLD 0,004 IN END DATE 02%23/'2011 TEST RESULT. LEAK THRESHOLD 0,602 IN END LEVEL 3,4355 IN' ERROR TEST RESULT PASSED LEAK THRESHOLD 0,002 IN - TEST RESULT PASSED VSPILL2 USPILL3 TEST STARTED 2:56 PM VSPILL3 TEST STARTED 02 2; 11 TEST STARTED 12:54 PM 20 BEGIN LEVEL / ^/ TEST STARTED 02/23/2011 TEST STARTED 12:36 PM 4,4508 IPJ BEGIN LEVEL 2,3751 IN TEST STARTED 02/23/2011 END TIME .3:11 PM END TIME 1:14 PM END DATE 02%23/2011 BEGIN LEVEL 2,3751 iN END LEVEL q END DATE 02/23/2011 END TIME 12:52 PM 4312 IN END LEVEL 2,3752 IN LEAK THRESHOLD 0,002 IN END DATE 42/23/2011 TEST RESULT LEAK THRESHOLD 0,002 IN END LEVEL 2;3(49 IN PASSED TEST RESULT PASSED LEAK THRESHOLD 0,002 IN TEST RESULT PASSED FASTRIP 367 8001.WHITE LANE BAKERSFIELD SUNSET CONST . 1-800-984-6266 02/23/2011 2:38 PM SUMP LEAK TEST RFPDc''f SPILL 1 TEST STARTED 2:13 PM TEST STARTED 02/23/2011 BEGIN,LEVEL 3,5373 IN END TIME 2:38 PM END DATE 02/23/2011 END LEVEL 3.5357 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED VSPILLI TEST..STARTED . 2:23 PM TEST STARTED --02723/2011 -TEST LEVEL 3,2713 IN END TIME 2:38 PM' END DATE 02/23/2011` END LEVEL 3,2716 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED SPILL 2 .TEST STARTED 2:23 PM TEST STARTED 02/23/2011 BEGIN LEVEL 3,5838 IN END TIME 2:38 PM END DATE 02%23/2011 END LEVEL 3,5878 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED VSPILL2 TEST STARTED 2:23 PM TEST STARTED 0212312611 BEGIN LEVEL 4,4927 IN END TIME 2:38 PM END DATE 02/23/2011 END LEVEL d,4906 IN LEAK THRESHOLD 0,002 IN TEST RESULT FAILED