HomeMy WebLinkAbout2011 RESULTS IIIIIB VIII III IIII 33
SWRCB,January 2002 IE Page of
Secondary Containment Testing Report Form
This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the
appropriate pages of this form to report results for all components tested The completed form,written test procedures, and
printouts from tests(if applicable),should be provided to the facility owner/operator for submittal to the local regulatory agency.
1. FACELXrY INFORMATION
Facility Name: Fastrip#346 Date of Testing: 3/10/11
Facility Address: 805 34TH Street,Bakersfield CA
Facility Contact: Jaco Hill Phone: 1-661-393-7000
Date Local Agency Was Notified of Testing: 3/4/11
Name of Local Agency Inspector(rf present during testing):
2. TESTING CONTRACTOR INFORMATION
Company Name: Sunset Mechanical
Technician Conduct' Test: Scott Olinger
Credentials: WCSLB Licensed Contractor ❑SWRCB Licensed Tank Tester
License Type. C-36 C-10 License Number. 589517
Manufacturer Training
Manufacturer Component(s) Date Training Expires
Incon TS-STS INSPECTION EQUIPMENT 1/18/13
VEEDER ROOT MONITORING SYSTEM 1/15/12
ICC CAL UST SERVICE TECH 1/18/13
3. SUMMARY OF TEST RESULTS
Not Repairs Not Repairs
Component Pass Fail Tested Made Component Pass Fail Tested Made
UDC# 1-2 X PIPING RUN#1 X
UDC#3-4 X PIPING RUN#2 X
UDC#5-6 X PIPING RUN#3 X
UDC# 7-8 X PIPING RUN#4 X
STP#1 X ANN SPACE#1 X
STP 92 X X ANN SPACE#2 X
STP#3 X X ANN SPACE#3 X
STP#4 X ANN SPACE#4 X
FILL#1 X SPILL#1 X
FILL#2 X SPILL#2 X
FILL#3 X SPILL#3 X
FILL#4 X SPILL#4 X
If hydrostatic testing was performed,describe what was done with the water after completion of tests:
CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
To the best of my knowledge,the facts stated in this document are accurate and in full compliance with legal requirements
Technician's Signature: Date:-2-24-11
IIIIIII VIII III IIII 34
IE
SWRCB,January 2002 Page of
Secondary Containment Testing Report Form
This form is intendedfor use by contractors performingperiodic testing of USTsecondwy containment systems. Use the
appropriate pages of thisform to report results for all components tested The completed form,written test procedures, and
printouts from tests(if applicable),should be provided to the facility owner/operator for submittal to the local regulatory agency.
1. FACILITY INFORMATION
Facility Name: Fastrip#346 Date of Testing: 3/10/11
Facility Address: 805 34TH Street,Bakersfield CA
Facility Contact.. Jaco Hill Phone: 1-661-393-7000
Date Local Agency Was Notified of Testing: 3/4/11
Name of Local Agency inspector(f present during testing):
2. TESTING CONTRACTOR INFORMATION
Company Name: Sunset Mechanical
Technician Conduc ' Test: Scott Olinger
Credentials: CSLB Licensed Contractor ❑SWRCB Licensed Tank Tester
License Type. C-36 C-10 License Number. 589517
Manufacturer Training
Manufacturer Component(s) Date Training Expires
Incon TS-STS INSPECTION EQUIPMENT 1/18/13
VEEDER ROOT MONITORING SYSTEM 1/15/12
ICC CAL UST SERVICE TECH 1/18/13
3. SUMMARY OF TEST RESULTS
Not Repairs Not Repairs
Component Pass Fail Tested Made Component Pass Fail Tested Made
TRANS#1 X X
TRANS#2 X X
V SPILL#1 X
V SPILL#2 X
V SPILL#3 X
V SPILL#4 X
If hydrostatic testing was performed,describe what was done with the water after completion of tests:
CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
To the best of my knowledge,the facts stated In this document are accurate and in full compliance with legal requirements
Technician's Signature: Date: 2-24-11
S WRCB,January 2002 Page of
4. TANK ANNULAR TESTING
Test Method Developed By: Tank Manufacturer ❑Industry Standard ❑Professional Engineer
❑Other(Spec)
Test Method Used ❑Pressure dvacuum ❑Hydrostatic
❑Other(Spec)
Test Equipment Used:4"Gel filled Gauge with Certs Equipment Resolution: 0-30
•=Mgt
. Tank#1 Tank#2 Tank#3 Tank#4
Is Tank Exempt From Testing?' ❑Yes dNo ❑Yes No ❑Yes o ❑Yes Ao
Tank Capacity: 12,000 12,000 12,000 12,000
Tank Material: GLASS/STEEL GLASS/STEEL GLASS/STEEL GLASS/STEEL
Tank Manufacturer. MODERN MODERN MODERN MODERN
Product Stored: UNLEADED UNLEADED PREMIUM DIESEL
Wait time between applying
pressure/vacuum/water and 10 MIN 10 MIN 10 MIN 10 MIN
starting test:
Test Start Time: 9:00 9:00 10:15 10:15
Initial Reading(RO: 8 HG 8 HG 9 HG 8 HG
Test End Time: 10:00 10:00 11:15 11:15
Final Reading(RF): 8 HG 8 HG 9 HG 8 HG
Test Duration: 1 HR - 1 HR 1 HR 1 HR
Change in Reading(RF-R4): 0 0 0 0
Pass/Fail Threshold or Criteria: 0 0 0 0
Test Result: Cy Pass 0-fail [ Pass' ❑Fail Pass p Fail Pass r Fail
Was sensor removed for testing? tomes ❑No ❑NA es ❑No ❑NA es ❑No ❑NA es ❑No ❑NA
Was sensor properly replaced and T dyes ❑No ❑NA Ukes ❑No ❑NA As ❑No ❑NA Yes ❑No ❑NA
verified functional after testing?.
Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests)
Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary
containment,such as systems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment
testing. (California Code of Regulations,Title 23,Section 2637(a)(6))
SWRCB,January 2002 Page of
5. SECONDARY PIPE TESTING
Test Method Developed By: 91 Piping Manufacturer ❑Industry Standard ❑Professional Engineer
❑Other(Sped)
Test Method Used: ❑Pressure ❑Vacuum WHydrostatic
❑Other(Spec)
Test Equipment Used:INCON TS-STS Equipment Resolution: 0.0000
Piping Run#1 Piping Run#Z Piping Run#3 Piping Rua#4
Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass
Piping Manufacturer. AO Smith AO Smith AO Smith AO Smith
Piping Diameter. 3" 3" 3" 3"
Length of Piping Run: 80, 907 100' 110,
Product Stored: UNL UNL PREM DIESEL
Method and location of Test Boot at STP Test Boot at STP Test Boot at STP Test Boot at STP
i in -run isolation:
Wait time between applying
pressure/vacuum/water and 20 Min 20 Min 20 Min 20 Min
starting test:
Test Start Time: 8:30 8:30 8:30 am 8:30
Initial Reading(RO: 62910 6.3809 6.3426 5.4560
Test End Time: 8:45 8:45 8:45 8:45
Final Reading(RF): 62909 6.3805 6.3427 5.4554
Test Duration: 15 MIN 15 MIN 15 MIN 15 MIN
Change in Reading(RF-RO: .0001 .0004 .0001 .0006
Pass/Fail Threshold or 002 .002 .002 .002
Criteria:
TesYResult Pass ..O Fail Pass.=-❑Fail;;: Pass;. ❑'Fail Pass O'Fail
Comments—(include information on repairs made prior to testing: and recommended follow-up for failed tests)
SWRCB,January 2002 Page of
6. PIl'ING SUMP TESTING
Test Method Developed By: I Sump Manufacturer ❑Industry Standard O Professional Engineer
❑Other(Spec)
Test Method Used: ❑Pressure ❑Vacuum Wydrostatic
❑Other(Spec)
Test Equipment Used: incon TS-STS Equipment Resolution: 0.0000
MUM%0 M W,W7-
' Sump#1 STP Sump#2 STP Sump#3 STP Sump#4 STP
r.�
Sump Diameter. 48" 48" 48" 48"
Sump Depth: 60" 60" 58" 57"
Sump Material: Fiberglass Fiberglass Fiberglass Fiberglass
Height-from Tank Top to Top of 16" 16" 16" 16"
Highest Piping Penetration:
Height from Tank Top to Lowest 24" 20" 24" 24"
Electrical Penetration:
Condition of sump prior to testing: DRY DRY DRY DRY
Portion of Sump Tested' 18"
Does turbine shut down when ll� //
sump sensor detects liquid(both dYes ❑No ❑NA Vies ❑No ❑NA [/Yes ❑No ❑NA 8'Yes ❑No ❑NA
product and water)?*
Turbine shutdown response time 20 See 20 See 20 See 20 See
Is system programmed for fail-safe R(Yes O No DNA l3'Yes ❑No ❑NA l7'Yes ❑No 11 NA E Yes O No ❑NA
shutdown?' //
Was fail-safe verified to be E Yes O No ❑NA Ul'es ❑No ❑NA Yes O No ❑NA 6/Yes ❑No ❑NA
op erational?
Wait time between applying
pressure/vacuum/water and starting 10 Min 10 Min 10 Min 10 Min
test:
Test Start Time: 10:21 1:46 2:05 12:31
Initial Reading(Rj): 6.2166 2.5326 5.1492 53011
Test End Time: 10:36 2:01 2:21 12:46
Final Reading.(RF): 3.2162 2.5324 5.1491 53010
Test Duration: 15 MIN 15 Min 15 Min 15 Min
Change in Reading(RF-RO: .0004 .0002 .0001 .0001
Pass/Fail Threshold or Criteria: .002 .002 .002 .002
;Test Result: - Pass': O Fail :Pass. . EFaiF Pasg —OF" Pass Fail
Was sensor removed for testing? Yes ❑No ❑NA es ❑No ❑NA es ❑No DNA 9(Yes ❑No ❑NA
Was sensor properly replaced and
verified functional after testin ? Yes ❑No ❑NA Yes ❑No ❑NA Yes O No ❑NA es ❑No ❑NA
CoMMCnts—(include information on repairs made prior to testing, and recommended follow-up for failed tests)
' If the entire depth of the sump is not tested,specify how much was tested. If the answer to gny of the questions indicated with an
asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160)
S WRCB,January 2002 Page of
6. PIPING SUMP TESTING
Test Method Developed By: 0 Sump Manufacturer ❑Industry Standard ❑Professional Engineer
❑Other(Spec)
Test Method Used: ❑Pressure O Vacuum Hydrostatic
❑Other(Spec)
Test Equipment Used: Incon TS-STS Equipment Resolution: 0.0000
OffIRAN#1 TRAN#2
Sump Diameter. 18"X 24" 18"X 24"
Sump Depth: 31" 31"
Sump Material: Fiberglass Fiberglass
Height from Tank Top to Top of 12" 12"
Highest Piping Penetration:
Height from Tank Top to Lowest 8" 8"
Electrical Penetration:
Condition of sump prior to testing: DRY DRY
Portion of Sump Tested' 14" 14"
Does turbine shut down when
sump sensor detects liquid(both L(Yes ❑No ❑NA Yes ❑No DNA ❑Yes O No ❑NA O Yes ❑No ❑NA
product and water)?. 6f
Turbine shutdown response time 20 See 20 Sec
Is system programmed for fail-safe
shutdown?` Yes O No ❑NA 4Yes O No ❑NA ❑Yes ❑No ❑NA O Yes O No O NA
Was fail-safe verified to be
operational?* dyes ❑No O NA C(Yes ❑No 11 NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA
Wait time between applying
pressure/vacuum/water and starting 10 Min 10 Min
test:
Test Start Tune: 1:30 1:30
Initial Reading(R): 3.1019 2.3009
Test End Time: 1:45 1:45
Final Reading(RF): 3.1017 2.3004
Test Duration: 15 MIN 15 Min
Change in Reading(RF-1Q: .0002 .0005
Pass/Fail Threshold or Criteria: .002 .002
Test Result Pass ;= -Fail `Passe , ❑Fail ❑ Pass` D,Fail ❑:,Pass ❑Fad's
Was sensor removed for testing? Yes ❑No O NA C(Yes O No O NA ❑Yes ❑No ❑NA O Yes ❑No ❑NA
Was sensor properly replaced and /
tin ? Yes 11 No ❑NA 8 Yes ❑No ❑NA ❑Yes O No ❑NA ❑Yes ❑No ❑NA
verified functional after tes
Comments—(include information on repairs made prior to testinp, and recommended follow-up for failed tests)
' If the entire depth of the sump is not tested,specify bow much was tested. If the answer to Any of the questions indicated with an
asterisk M is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160)
SWRCB,January 2002 Page of
7. UNDER ISPENSER CONTAINMENT C TESTING
Test Method Developed By. UDC Manufacturer ❑Industry Standard 0 Professional Engineer
0 Other(Spec)
Test Method Used: ❑Pressure ❑Vacuum Hydrostatic
❑Other(Spec)
Test Equipment Used: INCON TS-STS Equipment Resolution:0.0000
UDC#1-2 UDC#3-4 UDC#5-6 UDC#7-8
UDC Manufacturer. AM CON AM CON AM CON AM CON
UDC Material: Fiberglass Fibe ass Fiberglass Fiberglass
UDC Depth: 31" 32" 32" 33"
Height from UDC Bottom to Top 9" 10" 12" 11"
of Highest Piping Penetration:
Height from UDC Bottom to 5" 8" 8" 8"
Lowest Electrical Penetration:
Condition of UDC prior to DRY DRY DRY DRY
testing:
Portion of UDC Tested 14" 14" 14" 14"
Does turbine shut down when // !!--
"UDC sensor detects liquid(both E/Yes ❑No ❑NA ( Yes ❑No ❑NA 9� es 11 No ❑NA W&s ❑No ❑NA
product and water)?*
Turbine shutdown response time 20 SEC 20 SEC // 20 SEC 20 SEC
Is system programmed for fail- d Yes ❑No ❑NA Wkes 0 No ❑NA 9/Yes ❑No ❑NA E/Yes ❑No ❑NA
safe shutdown?* //
Was fail-safe verified to be es 0 No ❑NA es ❑No ❑NA es ❑No ❑NA As ❑No 0 NA
operational?*
Wait time between applying 20 Min 20 Min 20 MIN 20 MIN
pressurelvacuum/water and
starting test
Test Start Time: 8:09 8:09 8:09 8:09
Initial Reading W: 6.2913 6.3808 6.3421 5.4563
Test End Time: 8:24 8:24 8:24 8:24
Final Reading(RF): 62910 6.3808 6.3428 5.4561
Test Duration: 15 Min 15 Min 15 MIN 15 MIN
Change in Reading F-": .0003 .0000 .0007 .0002
Pass/Fail Threshold or Criteria: .002 .002 .002 .002
Test,Resiilt. Pass °OF Pass-: ❑Fait Pas ❑=Fail . Pass t7;Fail:'
Was sensor removed for testing? VYes ❑No ❑NA /Yes ❑No 11 NA es 0 No 0 NA /es ❑No ❑NA
Was sensor property replaced and yes 0 No ❑NA �J Yes ❑No ❑NA Yes ❑No ❑NA 9 Yes ❑No ❑NA
verified functional after testin ?
Comments—(include information on repairs made prior to testing: and recommended follow-up for failed tests)
If the entire depth of the UDC is not tested,specify how much was tested. If the answer to M of the questions indicated with an
asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160)
SWRCB,January 2002 Page of
8. FILL RISER CONTAINMENT SUMP TESTING
Facility is Not Equipped With Fill Riser Containment Sums ❑
Fill Riser Containment Sumps are t,but were Not Tested ❑
Test Method Developed By: 1JSump Manufacturer ❑Industry Standard ❑Professional Engineer
❑Other(Specify)
Test Method Used: ❑Pressure ❑Vacuum Hydrostatic
❑Other(Specify)
Test Equipment Used: INCON TS-STS Equipment Resolution: 0.0000
Fill Sump#1 Fill Sump#2 Fill Sum #3 Fill Sump#4
Sump Diameter. 42" 42" 42" 42"
Sum De the 60"
Height from Tank Top to Top of N/A" N/A" N/A" N/A"
Highest Piping Penetration:
Height from Tank Top to Lowest N/A N/A N/A N/A
Electrical Penetration:
Condition of sump-prior to DRY DRY DRY DRY
testis :
Portion of Sump Tested 12" 12" 12" 12"
Sump Material: Fiberglass Fiberglass Fiberglass Fiberglass
Wait time between applying 10 Min 10 Min 10 Min 10 Min
pressure/vacuum/water and
starting test:
Test.Start Time: 10:21 1021 11:47 11:47
Initial Reading O: 4.2065 4.9808 3.6388 3.1287
Test End Time: 10:36 10:36 12:02 12:02
Final Reading(RF): 4.2065 4.9806 3.6383 3.1287
Test Duration: 15 Min 15 Min 15 Min 15 Min
Chan a in Readin .0000 .0002 .0005 .0000
—_ ._
Pass/Fail Threshold or Criteria: .002 .002 .002 .001
Test Resnlh s_:, Pass d_Fail =Pass ❑Fail :. Pass ❑Fall Pass ❑'F �F.:
Is there a sensor in the sump? ❑Yes A No ❑Yes VNo ❑Yes VNo ❑Yes KNO
Does the sensor alarm when
either product or water is ❑Yes ❑No &i4A ❑Yes ❑No AA ❑Yes ❑No AA ❑Yes ❑No AA
detected?
Was sensor removed for testing? ❑Yes ❑No /A tO Yes ❑No A ❑Yes ❑No A 11 Yes ❑No A
Was sensor properly replaced and ❑Yes ❑No AA ❑Yes ❑No dNA ❑Yes ❑No AA ❑Yes ❑No AA
-verified functional after testing?
Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests)
SWRCB,January 2002 Page of
9.SPILL/OVERFILL CONTAINMENT BOXES
Facility is Not Equipped With Spill/Overfill Containment Boxes ❑
Spill/Overfill Containment Boxes.are nMnt,but were Not Tested ❑
Test Method Developed By: 4 Spill Bucket Manufacturer 0 Industry Standard ❑Professional Engineer
❑Other(Spec)
Test Method Used: ❑Pressure ❑Vacuum Hydrostatic
❑Other(Spec)
Test Equipment Used:INCON TS-STS Equipment Resolution:0.0000
Spill Box#Vl Spill Boa#V2 Spill Box#V3 Spill Box#V4
Bucket Diameter. 12" 12" 12" 12"
Bucket Depth: 14" 14" -14" -14"
Wait time between applying
pressurelvacuum/water and 10 MIN 10 MIN 10 MIN 10 MIN
starting test:
Test Start Time: 2:22 1:46 1:12 1:12
Initial Reading W: 4.5024 2.7912 4.5590 4.5772
Test End Time: 2:37 2:01 1:27 1:27
Final Reading(RF): 4.5024 2.7911 4.5587 4.5767
Test Duration: 15 MIN 15 MIN 15 MIN 15 MIN
-Change in Reading(RF-114): .0000 .0001 .0018 .0005
Pass/Fail Threshold or .002 .002 .002 .002
Criteria:
Test Resnit 1Pass :Fail Pass,;u;❑Fail;` Passe. ❑Fail Pass ❑.Failf
Comments—(include information on repairs made prior to testin& and recommended follow-up for failed tests)
I
SWRCB,January 2002 Page of
9. SPILL/OVERFILL CONTAINMENT BOXES
Facility is Not Eq ui With Spill/Overfill Containment Boxes ❑
Spill/Overfill Containment Boxes are Present,but were Not Tested ❑
Test Method Developed By: IJ Spill Bucket Manufacturer - ❑Industry Standard ❑Professional Engineer
❑Other(Specify)
Test Method Used: ❑Pressure ❑Vacuum d Hydrostatic
❑Other(Specify)
Test Equipment Used:INCON TS-STS Equipment Resolution:0.0000
Spill Box#1 Spill Box#2 Spill Bog#3 Spill Box#4
Bucket Diameter. 12" 12" 12" 12"
Bucket Depth: 14" 14" 14" 14"
Wait time Between applying
pressure/vacuum/water and 10 MIN 10 MIN 10 NUN 10 MIN
starting test:
Test Start Time: 2:05 2:05 1:12 1:12
Initial Reading(114): 4.9510 4.4376 42092 4.5772
Test End Time: 2:21 2:21 1;27 1:27
Final Reading(RF): 5.9513 4.4379 4.2091 4.5767
Test-Duration: .1.5 MIN 15.MIN 15 MIN 15 MIN
Change in Reading(PIF-RD: .0003 .0003 .0001 .0005
Pass/Fail Threshold or 002 .002 .002 .002
Criteria:
:Test Result Pass, ❑'Fad Pass O Fad Pass ❑Fair Pass Fa�k,
Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests)
FASTRIP 346 FASTRIP 346
FASTRIP 346 . 805 34Th 805 34TH
805 34TH BAKERSFIELD CA
BAKERSFIELD CA SUNSET CONST BAKERSFIELD CA
SUNSET CONST 1-800-984-6266 SUNSET 4 CONST
1-800-984-6266 1-800-984-626-626
6
03J10/2011 9:47 AM 03/10/2011 2:37 PM 03/10/2011 12:03 PM
SUMP LEAK TEST REPORT SUMP LEAK TEST REPORT SUMP LEAK TEST REPORT
TRAN1 STP 3 STP 3
TEST STARTED 2:22 PM TEST STARTED 11:47 AM
TEST STARTED 9:31 AM TEST STARTED 03/10/2011
TEST STARTED 03/10/2011
TEST STARTED 03/10j2011
BEGIN LEVEL 5.1490 IN BEGIN LEVEL 4,1428 IN
BEGIN LEVEL 3,4375 IN END TIME 2:37 PM
EN
END TIME 9:47 AM Q1D DATE 03/10/2011 TIME 12:02 PM
END DATE 03/10/2011 END LEVEL 5,1490 IN END D DATE 03/10/2011
END LEVEL 3.4329 IN END LEVEL 4,1179 IN
LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN
LEAK THRESHOLD 0.002 IN TEST RESULT PASSED
TEST RESULT FAILED TEST RESULT FAILED
TRAN2 SPILLI STP 4
TEST STARTED 2:22 PM TEST STARTED 11:47 AM
TEST STARTED 9:31 AM TEST STARTED 03/10/2011 . TEST STARTED 03/10/2011
TEST STARTED 03/10/2011 BEGIN LEVEL 4,9512 IN
BEGIN LEVEL 5,3022 IN
BEGIN LEVEL 6,0632 IN
END TIME 2:37 PM END TIME 12:02 PN
END TIME 9:47 AM END DATE 03/10/2011= END DATE 03/10/2011
END DATE 03/10/2011 END LEVEL 4.9511 IN
END LEVEL 5.4312 IN LEAK THRESHOLD 0.002 IN END LEVEL 5,3017 IN
LEAK THRESHOLD 0,002 IN
LEAK THRESHOLD 0,002 IN TEST RESULT PASSED
TEST RESULT FAILED TEST RESULT PASSED
STP 1 SPIL1.2 FILL 3
TEST STARTED 2:22 PM TEST STARTED 11:47 AM
TEST STARTED 9:31 AM TEST STARTED 03/10/2011 TEST STARTED 03/10/2011
TEST STARTED 03/10/2011 BEGIN LEVEL 4.4377 IN
- BEGIN LEVEL 3,6388 IN
BEGIN LEVEL 3,4171 IN
END TIME 2:37 PM END TIME 12:02 PM
END TIME 9:47 AM END DATE 03/10/2011 END DATE 03/10/2011
END DATE 03/10/2011 END LEVEL 4.4375 IN END LEVEL 3.M IN
DID LEVEL 3;4183 IN LEAK THRESHOLD 0.002 IN
LEAK THRESHOLD 0.002 IN TEST RESULT PASSED LEAK THRESHOLD 0,002 IN
TEST RESULT PASSED TEST RESULT PASSED
VSPILLI FILL 4
FILL 1
TEST STARTED 2:22 PM TEST STARTED 11:47 AM
TEST STARTED 9:31 AM TEST STARTED 03/10/2011 TEST STARTED 03/10/2011
TEST STARTED 03/10/2011 BEGIN LEVEL 4,5024 IN BEGIN LEVEL 3.1287 IN
BEGIN LEVEL 6.1957 IN END TIME 2:37 PM END TIME 12:02 PM
END TIME 9:47 AM END DATE 03/10/2011 END DATE 03/10/2011
END DATE 03/10/2011 END LEVEL 4.5024 IN END LEVEL 3.1287 IN
END LEVEL 6.1968 IN LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0.002 IN
LEAK THRESHOLD 0.002 IN TEST RESULT PASSED TEST RESULT PASSED
TEST RESULT PASSED -- - _ - --
FASTRIP 346 FASTRIP 346 FASTRIP 346
805 34TH 805 34TH 805 34TH
BAKERSFIELD CA BAKERSFIELD CA BAKERSFIELD CA
SUNSET CONST SUNSET CONST SUNSET CONST
1-800-984-6266 1-800-984-6266 1-800-984-6266
03/10/2011 2:21 PM 03/10/2011 2:01 PM 03/10/2011 1:45 PM
SUMP LEAK TEST REPORT SUMP LEAK TEST REPORT SUMP LEAK TEST REPORT
STP 3 STP 2 STP 2
TEST STARTED 2:05 PM TEST STARTED 1:46 PM TEST STARTED 1:30 PM
TEST STARTED 03/10/2011 TEST STARTED 03/10/2011 TEST STARTED 03/10/2011
BEGIN LEVEL 5,1492 IN BEGIN LEVEL 2,5326 IN -BEGIN LEVEL 2.5325 IN
END TIME 2:21 PM END TIME 2:01 PM END TIME 1:45 PM
END DATE 03/10/2011 END DATE 03/10/2011 END DATE 03/10/2011
END LEVEL 5, 1491 IN END LEVEL 2,5324 IN END LEVEL 2.5326 IN
LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN
TEST RESULT PASSED TEST RESULT PASSED TEST RESULT PASSED
SPILLI TRAN1 TRAM
TEST STARTED 2:05 PM TEST STARTED 1:46 PM TEST STARTED 1:30 PM
TEST STARTED 03/10/2011 TEST STARTED 03/10/2011 TEST STARTED 03/10/2011
BEGIN LEVEL 4.9510 IN - BEGIN LEVEL 3,1018 IN BEGIN LEVEL 3,1019 IN
END TIME 2:21 PM END TIME 2:01 PM END TIME 1:45 PM
END DATE 03/10/2011 END DATE 03/10/2011 END DATE 03/10/2011
END LEVEL 4,9513 IN END LEVEL 3.1018 IN END LEVEL 3.1017 IN
LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN
TEST RESULT PASSED TEST RESULT PASSED TEST RESULT PASSED
SPILL2 TRAN 2 TRAN 2
TEST STARTED 2:05 PM TEST STARTED 1:40 PM TEST STARTED 1:30 PM
TEST STARTED 03/10/2011 TEST STARTED 03/10/2011 TEST STARTED 03/10/2011
BEGIN LEVEL 4,4376 IN BEGIN LEVEL 2,3004 IN BEGIN LEVEL 2,3009 IN
END TIME 2:21 PM END TIME 2:01 PM END TIME 1:45 PM
END DATE 03/10/2011 END DATE 03/10/2011 END DATE 03/10/2011
END LEVEL 4,4379 IN END LEVEL 2,3004 IN- END LEVEL 2,3004 IN
LEAK THRESHOLD 0.002 IN LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN
TEST RESULT PASSED TEST RESULT PASSED TEST RESULT PASSED
VSPILLI VSPILL2 VSPILL2
TEST STARTED 2:05 PM TEST STARTED -1:46 PM TEST STARTED 1:30 PM
TEST STARTED 03/10/2011 TESL' STARTED 03/10/2011 TEST STARTED 03/10/2011
BEGIN LEVEL 4,5022 IN BEGIN LEVEL 2,7912 IN BEGIN LEVEL 2,7912 IN
END TIME 2:21 PM END TIME 2:01 PM END TIME 1:45 PM
END DATE 03/10/2011 END DATE 03/10/2011 END DATE 03/10/2011
END LEVEL 4,5025 IN END LEVEL 2,7911 IN END LEVEL 2.7912 IN
LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN
TEST RESULT - PASSED TEST RESULT __ PASSED TEST RESULT PASSED
FASTRIP 346 FASTRIP 346 = FASTRIP 346
805 34TH 805 34TH 805 34TH
BAKERSFIELD CA BAKERSFIELD CA BAKERSFIELD CA
SUNSET CONST SUNSET CONST SUNSET CONST
1-800-984-6266 1-800-984-6266 1-800-984-6266
03/10/2011 8:45 AM 03/1012011 8:24 AM 03/10/2011 1:27 PM
SUMP LEAK TEST REPORT SUMP LEAK TEST REPORT SUMP LEAK TEST REPORT
UDC 1-2 UDC 1-2 SPILL3
TEST STARTED 8:30 AM TEST STARTED 8:09 AM TEST STARTED 1:12 PM
TEST STARTED 03/10/2011 TEST STARTED 03/10/2011 TEST STARTED 03/10/2011
BEGIN LEVEL 6.2910 IN BEGIN LEVEL 6,2913 IN BEGIN LEVEL 4.2092 IN
END TIME 8:45 AM END TIME 8:24 AM END TIME 1:27 PM
END DATE ' 03/20/2011 END DATE 03% 10/2011
END LEVEL 6.2909 IN END DATE 03/20/2011 END LEVEL 4.2091 IN
END LEVEL 6.2916 IN
LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0.002 IN LEAK THRESHOLD 0.002 IN
'TEST RESULT PASSED TEST RESULT PASSED TEST RESULT PASSED
UDC 3-4 UDC 3-4 VSPILL3
TEST STARTED 8:30 AM TEST STARTED 8:09 AM TEST STARTED 1:12 PM
TEST STARTED 03/10/2011 TEST STARTED 03/10/2011 TEST STARTED 03/10/2011
BEGIN LEVEL 6.3809 IN BEGIN LEVEL 6.3808 IN BEGIN LEVEL 4.5590 IN
END TIME 8:45 AM END TIME 8:24 AM END TIME 1:27 PM
END DATE 03/10/2011 END DATE 03/10/2011 END DATE 03/10/2011
END°LEVEL 6.3805 IN END LEVEL 6.3808 IN END LEVEL 4,5587 IN
LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN
TEST RESULT PASSED TEST RESULT PASSED TEST RESULT PASSED
.UDC 5-6 UDC 5-6 SPILL4
TEST STARTED 8:30 AM TEST STARTED 8:09 AM TEST STARTED 1:12 PM
TEST STARTED 03/10/2011 TEST STARTED 03/10/2011 TEST STARTED 03/10/2011
BEGIN LEVEL 6.3426 IN BEGIN LEVEL 6,3421 IN BEGIN LEVEL 4.5772 IN
END TIME 8:45 AM END TIME 8:24 AM END TIME 1:27 PM
END DATE 03/10/2011 END DATE 03/10/2011 END DATE 03/10/2011
END LEVEL 6,3427 IN END LEVEL 6.3428 IN END LEVEL 4.5767 IN
LEAK.THRESHOLD 0,002' IN LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED TEST RESULT PASSED TEST RESULT PASSED
UDC 7-8 UDC 7-8 VSPILL4
TEST STARTED 8:30 AM TEST STARTED 8:09 AM TEST STARTED 1:12 PM
TEST STARTED 03/10/2011 TEST STARTED 03/10/2011 TEST STARTED 03/10/2011
BEGIN LEVEL 5,4560 IN BEGIN LEVEL 5,4563 IN BEGIN LEVEL 4,9066 IN
END TIME 8:45 AM END TIME 8:24 AM END TIME 1:27 PM
END DATE 03/10/2011 DID DATE 03/10/2011 END DATE 03/10/2011
END LEVEL 5.4554 IN END LEVEL 5,4561 IN END LEVEL 4,9064 IN
LEAK THRESHOLD 0.002 IN LEAK THRESHOLD 0.002 IN LEAK THRESHOLD 0.002 IN
TEST RESULT _ PASSED TEST RESULT PASSED TEST RESULT PASSED
FASTRIP 346 FASTRIP 348
805 34TH
805 34TH FASTRIP 346 BAKERSFIELD CA
BAKERSFIELD CA 805 34TH SUNSET CONST
SUNSET CONST
1-800-984-6266 BAKERSFIELD CA 1-800-984-6266
SUNSET CONST
03/10/2011 1:12 PM
1-800-984-6266 03110/2011 10:18 AM
SUMP LEAK TEST REPORT
03/10/2011 10:36 AM SUMP LEAK TEST REPORT
SPILL3 SUMP LEAK TEST REPORT STP 2
TEST STARTED 12:56 PM
STP 2 TEST STARTED 10:03 AM
TEST STARTED 03/14/2011
TEST STARTED 03/14/2011 TEST STARTED 10:21 AM BEGIN LEVEL 3,2002 IN
BEGIN LEVEL 4.2088 IN TEST STARTED 03110/2011 10:18 AM
END TIME 1:11 PM END TIME 03/10/2011
BEGIN LEVEL 3,2002 IN END DATE
END DATE 03/10/2011 10:36 AM 3.2206 IN
END LEVEL 4,2093 IN END TIME � ENO LEVEL p.042 IN
LEAK THRESHOLD 0,002 IN END DATE 03/10/2011 LEAK THRESHOLD
END LEVEL 3.1959 IN TEST RESULT PASSED
TEST RESULT PASSED LEA}( THRESHOLD 0.002 IN
TEST RESULT FAILED
FILL 2
VSPILL3
FILL 2 TEST STARTED 10:03 AM
TEST STARTED 12:56 Pik TEST STARTED 03/10/2011
TEST STARTED 03/10/2011 TEST STARTED 10:21 Ni BEGIN LEVEL 4.9800 IN
BEGIN LEVEL 4,5609 IN TEST STARTED 03/10/2011 END TIME 10:18 AM
END TIME 1:11 PM BEGIN LEVEL 4.9808 IN END DATE 03/10/2011
END DATE 03/10/2011 END TIME 10:36 AM END LEVEL 4.9815 IN
END LEVEL 4.5593 IN END DATE 03/10/2011 LEW THRESHOLD 0.002 IN
LEAK THRESHOLD 0,002 IN END LEVEL 4.W6 IN TEST RESULT PASSED
TEST RESULT PASSED LEAK THRESHOLD 0,002 IN
TEST RESULT PASSED
STP 1 -
SPILL4
STP 1 TEST STARTED 10:03 AM
TEST STARTED 12:56 PM TEST STARTED 03/10/2011
TEST STARTED 03/10/2011 TEST STARTED 10:21 AM BEGIN LEVEL 6,2166 IN
BEGIN LEVEL 4.5789 IN TEST STARTED 03/10/2011 END TIME 10'18 AM
END TIME 1:11 PM BEGIN LEVEL 6.2166 IN END DATE 03/10/2011
END DATE 03/10/2011 END TIME 10:36 AM END LEVEL 6.2166 IN
END LEVEL 4.5773 IN END DATE 03110/2011 LEAK THRESHOLD 0.002 IN
LEAK THRESHOLD 0.002 IN END LEVEL 6.2152 IN TEST RESULT PASSED
TEST RESULT PASSED LEAK THRESHOLD 0,002 IN
TEST RESULT PASSED FILL 1
VSPILL4
FILL 1 TEST STARTED 10:03 AM
TEST STARTED 12:56 PM TEST STARTED 03/10/2011
TEST STARTED 03/10/2011 TEST STARTED 10:21 AM BEGIN LEVEL 4.2062 IN
BEGIN LEVEL 4,9083 IN TEST STARTED 03/1012011 END TIME 10:18 AM
END TIME 1:11 PM BEGIN LEVEL 4.2065 IN END DATE 03110/2011
END DATE 03/10/2011 END TIME 10:36 AM END LEVEL 4.2065 IN
END LEVEL 419068 IN w DATE 03/10/2011 LEAK THRESHOLD 0,002 IN
LEAK THRESHOLD 0,002 IN END LEVEL 4.2065 IN TEST RESULT PASSED
TEST RESULT PASSED LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
'FASTRIP 346
805 34TH
BAKERSFIELD CA
SUNSET CDNST
1-800-984-6266
03/10/2011 12:46 PM
SUMP LEAK TEST REPORT
STP 3
TEST STARTED 12:31 PM
TEST STARTED 03/10/2011
BEGIN LEVEL 4.0681 IN
END TIME 12:46 PM
END DATE 03/10/2011
END LEVEL 4,0444 IN
LEAK THRESHOLD 0,002 IN
TEST RESULT FAILED
STP 4
TEST STARTED 12:31 PM
TEST STARTED 03/10/2011
BEGIN LEVEL 5,3011 IN
END TIME 12:46 PM
END DATE 03/10/2011
END LEVEL 5.3010 IN
LEAK THRESHOLD 0,002 IN
TEST RESULT PASSED
FILL 3
TEST STARTED 12:31 PM
TEST STARTED 03/10/2011
BEGIN LEVEL 3,6377 IN
END TIME 12:46 PM
END DATE 03/10/2011
END LEVEL 3.6370 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
FILL 4
TEST STARTED 12:31 PM
TEST STARTED 03/10/2011
BEGIN LEVEL 3.1285 IN
END TIME 12:46 PM
END DATE 03/10/2011 -
END LEVEL 3,1284 IN
LEAK THRESHOLD 0,002 IN
__TEST RESULT` PASSED