Loading...
HomeMy WebLinkAbout1017 OAK STREET (2)Main Drain Test Results: Inspection, Testing, and Maintenance Fire Sprinkler System NFPA 25, Chapter 5 as amended by CCR, Title 19 Page 1 of 4 I = Inspection Initial Static Pressure: 0 (psi) T = Test /� Date of Inspection, Testing, Maintenance: System Riser ID: A -O = After Operation Property Inform tion: �. n Tye f System: �� Name: _ QYYI. Activity Wet Pipe tiQi °9a NFPA 25 Reference Fail O Dry Pipe Pass Address: — ❑ Preaction \� 12.4.3.1 ❑ Deluge Weekly l City: Main Drain Test Results: Abbreviation Key: I = Inspection Initial Static Pressure: 0 (psi) T = Test /� M = Maintenance Residual Pressure: YV (psi) A -O = After Operation MI =Per Manufacturer's Instructions Restored Static Pressure: � (psi) Item Activity Frequency Description NFPA 25 Reference Fail N/A Pass 1.1 1 Daily Preaction /Deluge Valves – Enclosure 12.4.3.1 Weekly temperature 1.2 1 Daily Dry Pipe Valves – Enclosure 12.4.4.1.1 Weekly temperature 1.3 1 Quarterly Gauges (Dry, Preaction, Deluge 5.2.4.2 Systems) 5.2.4.3 1.4 1 Quarterly Control Valves 12.3.2.1 1.5 1 Quarterly Alarm Devices 5.2.6 1.6 1 Quarterly Gauges (Wet Pipe systems) 5.2.4.1 1.7 1 Quarterly Hydraulic nameplate 5.2.7 1.8 1 Quarterly Pipe and Fittings 5.2.2 X 1.9 1 Quarterly Sprinklers 5.2.1 1.10 1 Quarterly Spare Sprinklers 5.2.1.3 1.11 1 Quarterly Fire Department Connections 12.7.1 X 1.12 1 Quarterly Alarm Valves – Exterior Inspection 12.4.1.1 1.13 1 Quarter) Quarterly Preaction/Deluge Valves – Exterior 12.4.3.1.6 Inspection 1.14 1 Quarterly Pressure Reducing Valves 12.5,1.1 1,15 1 Quarterly Dry Pipe Valves – Exterior Inspection 12.4.4.1.4 1.16 1 Quarterly Bacdow Preventers 12.6.1 1.17 1 Annually Buildings 5.2.5 �1 Inspection, Testing, and Maintenance Fire Sprinkler System Page 2 of 4 NFP.A 25., Chapter 5 as.amerid... b CCR Title 19 Date of Inspection, Testing, Maintenance: ($ ( System Riser ID: Property Inform lion: Name: Tye f System: �oF °gCiA' XWet Pipe °�y �p l —1 El Dry Pipe Address: ❑ Preaction ❑ Deluge ARE M City: Item Activity Frequency Description NFPA 25 Reference Fail N/A Pass 1.18 1 Annually Hangers 5.2.3 1.19 1 Annually Seismic Braces 5.2.3 1.20 1 5 Years Hangers (Accessible concealed spaces) 5.2.3.3 1.21 1 5 Years seismic Braces (Accessible- concealed 5.2.3.3 1.22 1 5 Years Pipe and Fittings (Accessible concealed 5.2.2.3 s cvs 1.23 1 5 Years Sprinklers (Accessible concealed spaces) 5.2.1.1.4 1.24 1 5 Years Alarm Valves — Interior Inspection 12.4.1.2 1.25 1 5 Years Alarm Valves - Strainers, filters, orifices 12.4.1.2 1.26 1 5 Years Check Valves — Interior Inspection 12.4.2.1 1.27 1 5 Years Preaction/Deluge Valves — Interior 12.4.3.1.7 Inspection 1.28 1 5 Years Preaction/Deluge Valves - Strainers, 12.4.3.1.8 X fitters orifioes 1.29 1 5 Years Dry Pipe Valves — Interior Inspection 12.4.4.1.5 1.30 1 5 Years Dry Pipe Valves - Strainers, filters, orifices 12.4.4.1.6 2.1 T Annually Alarm Devices (90 Sec) 5.3.3 12.2.7 12.2.6 2.2 T Annually Main Drain Test (Enter data on Page 1) 12.2.6.1 12.3.3.4 2.3 T Annually Antifreeze Test 5.14 2.4 T Annually Control Valve - Position 12.3.3.1 2.5 T Annually Control Valve — Operation 12.3.3.1 2.6 T Annually Supervisory 12.3.3.5 2.7 T Annually Preaction Valve — Priming Water 12.4.3.2.1 2.8 T Annually Preacton Valve — Low Air Pressure Alarm 12.4.3.2.10 2.9 T Annually Preaction Valve — Full Flow Trip Test 12.4.3.2.2 . Inspection, Testing, and Maintenance Fire Sprinkler System Page 3 of 4 NFPA 25, Chapter as amended by CCR, Title 19 iO5 Date of Inspection, Testing, Maintenance: ooh —I p_-� (_ System Riser ID: Property Info ation: Type f System: F- �A�41, Name: 1 -1 OQ � )Wet Pipe ❑Dry Pipe Address: V Cam- O Preaction 1 i ❑ Deluge E M City: z Item Activity Frequency Description NFPA 25 Fail N/A Pass Reference 2.10 T Annually Dry Pipe Valve — Priming Water 12.4.4.2.1 2.11 T Annuall y Dry Pipe Valve — Low Air Pressure 12,4.4.2.6 Alarm 2.12 T Annually y Dry Pipe Valve — Quick- Opening 12.4.4.2.4 Device 2.13 T Annually Dry Pipe Valve — Trip Test 12.4.4.2.2 2.14 T Annually Backflow Preventer Assemblies 12.6.2 2.15 TI., 3 Years Dry Pipe Valve — Full Flow Trip Test 12.4.4.2.2.2 2.16 T 5 Years Gauges 5.3.2 2.17 T 5 Years Pressure Reducing Valve 12.5.1.2 2.18 T 5 Years Fire Department. Connection Backflush 12.7.4 2.19 T 5 Years Sprinklers — Extra High Temperature 5.3.1.1.1.3 2.20 T 5 Years Sprinklers — Corrosive environment or 5.3.1.1.2 X corrosive water 2.21 T 10 Years Sprinklers - Dry 5,3.1.1.1.5 2.22 T 20 Years Sprinklers - Fast Response 5.3.1.1.1.2 2.23 T 50 Years Sprinklers 5.3.1.1.1 2.24 T 75 Years Sprinklers 75 years in service 5.3.1.1.1.4 2.25 T Sprinklers manufactured prior to 1920 5.3.1.1.1.1 x — Replace 3.1 M Annually Control Valves 12.3.4 3.2 M Annually Preaction /Deluge Valves 12.4.3.3.2 3.3 M Ann uall y Dry Pipe Valves /Quick- Opening 12.4.4.3.2 Devices 3.4 M Annually Dry Pipe Valve — Low Point Drains 12.4.4.3.3 3.5 M 5 Years Obstruction Investigation Chapter 13 Inspection, Testing, and Maintenance Fire Sprinkier System NFPA 25, Chapter 5 as qmvnO., - Oy CC R, Title 19 Page 4 of 4 Date.of Inspection, Testing, .Maintenance: a -18 -� System Riser ID: Property Information: n Type of System: �OF cA <i,N 16 Name: Wet Pipe J �� ❑ Dry Pipe �' r Address: l ❑ Preaction IPA ❑ Deluge M C ity: M Item Deficiencies and Comments: :peficlendes and Comments Item number must,correspond to the Item number of the Activi .;listed <above: X11 Q5 Q nAnn u C G. See Continuation Page(s) (Indicate the nu berof continuation pages) PASS � nn C3 FAIL Si natwre. Date