HomeMy WebLinkAbout1017 OAK STREET (2)Main Drain Test Results:
Inspection, Testing, and Maintenance Fire Sprinkler System
NFPA 25, Chapter 5 as amended by CCR, Title 19
Page 1 of 4
I = Inspection
Initial Static Pressure: 0 (psi)
T = Test
/�
Date of Inspection, Testing, Maintenance:
System Riser ID:
A -O = After Operation
Property Inform tion:
�. n
Tye f System:
��
Name: _ QYYI.
Activity
Wet Pipe
tiQi °9a
NFPA 25
Reference
Fail
O Dry Pipe
Pass
Address:
—
❑ Preaction
\�
12.4.3.1
❑ Deluge
Weekly
l
City:
Main Drain Test Results:
Abbreviation Key:
I = Inspection
Initial Static Pressure: 0 (psi)
T = Test
/�
M = Maintenance
Residual Pressure: YV (psi)
A -O = After Operation
MI =Per Manufacturer's Instructions
Restored Static Pressure: � (psi)
Item
Activity
Frequency
Description
NFPA 25
Reference
Fail
N/A
Pass
1.1
1
Daily
Preaction /Deluge Valves – Enclosure
12.4.3.1
Weekly
temperature
1.2
1
Daily
Dry Pipe Valves – Enclosure
12.4.4.1.1
Weekly
temperature
1.3
1
Quarterly
Gauges (Dry, Preaction, Deluge
5.2.4.2
Systems)
5.2.4.3
1.4
1
Quarterly
Control Valves
12.3.2.1
1.5
1
Quarterly
Alarm Devices
5.2.6
1.6
1
Quarterly
Gauges (Wet Pipe systems)
5.2.4.1
1.7
1
Quarterly
Hydraulic nameplate
5.2.7
1.8
1
Quarterly
Pipe and Fittings
5.2.2
X
1.9
1
Quarterly
Sprinklers
5.2.1
1.10
1
Quarterly
Spare Sprinklers
5.2.1.3
1.11
1
Quarterly
Fire Department Connections
12.7.1
X
1.12
1
Quarterly
Alarm Valves – Exterior Inspection
12.4.1.1
1.13
1
Quarter)
Quarterly
Preaction/Deluge Valves – Exterior
12.4.3.1.6
Inspection
1.14
1
Quarterly
Pressure Reducing Valves
12.5,1.1
1,15
1
Quarterly
Dry Pipe Valves – Exterior Inspection
12.4.4.1.4
1.16
1
Quarterly
Bacdow Preventers
12.6.1
1.17
1
Annually
Buildings
5.2.5
�1
Inspection, Testing, and Maintenance Fire Sprinkler System Page 2 of 4
NFP.A 25., Chapter 5 as.amerid... b CCR Title 19
Date of Inspection, Testing, Maintenance: ($ (
System Riser ID:
Property Inform lion:
Name:
Tye f System: �oF °gCiA'
XWet Pipe °�y
�p l —1
El Dry Pipe
Address:
❑ Preaction
❑ Deluge
ARE M
City:
Item
Activity
Frequency
Description
NFPA 25
Reference
Fail
N/A
Pass
1.18
1
Annually
Hangers
5.2.3
1.19
1
Annually
Seismic Braces
5.2.3
1.20
1
5 Years
Hangers (Accessible concealed spaces)
5.2.3.3
1.21
1
5 Years
seismic Braces (Accessible- concealed
5.2.3.3
1.22
1
5 Years
Pipe and Fittings (Accessible concealed
5.2.2.3
s cvs
1.23
1
5 Years
Sprinklers (Accessible concealed spaces)
5.2.1.1.4
1.24
1
5 Years
Alarm Valves — Interior Inspection
12.4.1.2
1.25
1
5 Years
Alarm Valves - Strainers, filters, orifices
12.4.1.2
1.26
1
5 Years
Check Valves — Interior Inspection
12.4.2.1
1.27
1
5 Years
Preaction/Deluge Valves — Interior
12.4.3.1.7
Inspection
1.28
1
5 Years
Preaction/Deluge Valves - Strainers,
12.4.3.1.8
X
fitters orifioes
1.29
1
5 Years
Dry Pipe Valves — Interior Inspection
12.4.4.1.5
1.30
1
5 Years
Dry Pipe Valves - Strainers, filters, orifices
12.4.4.1.6
2.1
T
Annually
Alarm Devices (90 Sec)
5.3.3
12.2.7
12.2.6
2.2
T
Annually
Main Drain Test (Enter data on Page 1)
12.2.6.1
12.3.3.4
2.3
T
Annually
Antifreeze Test
5.14
2.4
T
Annually
Control Valve - Position
12.3.3.1
2.5
T
Annually
Control Valve — Operation
12.3.3.1
2.6
T
Annually
Supervisory
12.3.3.5
2.7
T
Annually
Preaction Valve — Priming Water
12.4.3.2.1
2.8
T
Annually
Preacton Valve — Low Air Pressure Alarm
12.4.3.2.10
2.9
T
Annually
Preaction Valve — Full Flow Trip Test
12.4.3.2.2
.
Inspection, Testing, and Maintenance Fire Sprinkler System Page 3 of 4
NFPA 25, Chapter as amended by CCR, Title 19
iO5
Date of Inspection, Testing, Maintenance: ooh —I p_-� (_
System Riser ID:
Property Info ation:
Type f System: F- �A�41,
Name:
1 -1 OQ
�
)Wet Pipe
❑Dry Pipe
Address: V Cam-
O Preaction 1 i
❑ Deluge
E M
City:
z
Item
Activity
Frequency
Description
NFPA 25
Fail
N/A
Pass
Reference
2.10
T
Annually
Dry Pipe Valve — Priming Water
12.4.4.2.1
2.11
T
Annuall y
Dry Pipe Valve — Low Air Pressure
12,4.4.2.6
Alarm
2.12
T
Annually
y
Dry Pipe Valve — Quick- Opening
12.4.4.2.4
Device
2.13
T
Annually
Dry Pipe Valve — Trip Test
12.4.4.2.2
2.14
T
Annually
Backflow Preventer Assemblies
12.6.2
2.15
TI.,
3 Years
Dry Pipe Valve — Full Flow Trip Test
12.4.4.2.2.2
2.16
T
5 Years
Gauges
5.3.2
2.17
T
5 Years
Pressure Reducing Valve
12.5.1.2
2.18
T
5 Years
Fire Department. Connection Backflush
12.7.4
2.19
T
5 Years
Sprinklers — Extra High Temperature
5.3.1.1.1.3
2.20
T
5 Years
Sprinklers — Corrosive environment or
5.3.1.1.2
X
corrosive water
2.21
T
10 Years
Sprinklers - Dry
5,3.1.1.1.5
2.22
T
20 Years
Sprinklers - Fast Response
5.3.1.1.1.2
2.23
T
50 Years
Sprinklers
5.3.1.1.1
2.24
T
75 Years
Sprinklers 75 years in service
5.3.1.1.1.4
2.25
T
Sprinklers manufactured prior to 1920
5.3.1.1.1.1
x
— Replace
3.1
M
Annually
Control Valves
12.3.4
3.2
M
Annually
Preaction /Deluge Valves
12.4.3.3.2
3.3
M
Ann uall y
Dry Pipe Valves /Quick- Opening
12.4.4.3.2
Devices
3.4
M
Annually
Dry Pipe Valve — Low Point Drains
12.4.4.3.3
3.5
M
5 Years
Obstruction Investigation
Chapter 13
Inspection, Testing, and Maintenance Fire Sprinkier System
NFPA 25, Chapter 5 as qmvnO., - Oy CC R, Title 19
Page 4 of 4
Date.of Inspection, Testing, .Maintenance: a -18 -�
System Riser ID:
Property Information:
n
Type of System:
�OF cA <i,N
16 Name:
Wet Pipe
J
��
❑ Dry Pipe
�' r
Address: l
❑ Preaction
IPA
❑ Deluge
M
C ity:
M
Item
Deficiencies and Comments:
:peficlendes and Comments Item number must,correspond to the Item number
of the Activi .;listed <above:
X11 Q5 Q nAnn u C
G. See Continuation Page(s) (Indicate the nu berof continuation pages)
PASS � nn
C3 FAIL
Si natwre. Date