Loading...
HomeMy WebLinkAbout1017 OAK STREETInspection, Testing, and.Maintenance Fire Sprinkler System Page 1 of 4 NFPA 25, Chapter 5 as .amended by CCR, Title 19 Date of Inspection, Testing, Maintenance: -V.0 4D System Riser ID: Property Info ation: Ty e of System: F ca Name: op _ Wet Pipe ,,Q Address: baL ,-�, ❑ Dry Pipe I ❑ Preaction Preaction /Deluge Valves - Enclosure temperature ❑ Deluge VMA City: l Main Drain Test Results: ^-7 r �, VJ Initial Static Pressure: I (psi) Residual Pressure: � (psi) Restored Static Pressure: (psi) Abbreviation Key: I = Inspection T = Test M = Maintenance A -O = After Operation MI = Per Manufacturer's Instructions Item Activity Frequency Description NFPA 25 Reference Fail N/A Pass 1.1 I Daily Weekly Preaction /Deluge Valves - Enclosure temperature 12.4.3.1 1.2 1 Daily Weekly Dry Pipe Valves - Enclosure temperature 12.4.4.1.1 1.3 1 Quarterly Gauges (Dry, Preaction, Deluge Systems) 5.2.4.2 5.2.4.3 \�+ J� 1.4 1 Quarterly Control Valves 12.3.2.1 1.5 1 Quarterly Alarm Devices 5.2.6 1.6 1 Quarterly Gauges (Wet Pipe Systems) 5.2.4.1 1.7 1 Quarterly Hydraulic nameplate 5.2.7 1.8 1 Quarterly Pipe and Fittings 5.2.2 1.9 1 Quarterly Sprinklers 5.2.1 Ix 1.10 1 Quarterly Spare Sprinklers 5.2.1.3 1.11 1 Quarterly Fire Department Connections 12.7.1 1.12 1 Quarterly Alarm Valves - Exterior Inspection 12.4.1.1 1.13 1 Quarter) Quarterly Preaction/Deluge Valves - Exterior Inspection 12.4.3.1.6 1.14 1 Quarterly Pressure Reducing Valves 12.5.1.1 1.15 1 Quarterly Dry Pipe Valves - Exterior Inspection 12.4.4.1.4 1.16 1 Quarterly Backflow Preventers 12.6.1 1.17 1 Annually Buildings 5.2.5 Inspection, Testing, and Maintenance Fire Sprinkler System Page 2 of 4 NFPA 25, Chapter 5,-(as :amended: by CCR Title 19 Date of Inspection, Testing, Maintenance: System Riser ID: Property Infor ation: Name: TyTnet System: �o� < \iA� Pipe p L� 7. O Dry Pipe " 1D Address: 10 O Preaction O Deluge 9�EP City: Item Activity Aid Frequency Description NFPA 25 Reference Fail N/A Pass 1.18 1 Annually Hangers 5.2.3 1.19 1 Annually Seismic Braces 5.2.3 1.20 1 5 Years Hangers (Accessible concealed spaces) 5.2.3.3 1.21 1 5 Years Seismic Braces (Accessible concealed 5.2.3.3 s 1.22 1 5 Years Pipe and Rithngs (Accessible concealed 5.2.2.3 spaces) 1.23 1 5 Years Sprinklers (Accessible concealed spaces) 5.2.1.1.4 1.24 1 5 Years Alarm Valves — Interior Inspection 12.4.1.2 1.25 1 5 Years Alarm Valves - Strainers, lifters, orifices 12.4.1.2 1.26 1 5 Years Check Valves — Interior Inspection 12.4.2.1 1.27 1 5 Years Preaction/Deluge Valves - Interior 12.4.3.1.7 Inspection 1.28 1 5 Years Preaction/Deluge Valves - Strainers, 12.4.3.1.8 fitters orifices 1.29 1 5 Years Dry Pipe Valves — Interior Inspection 12.4.4.1.5 1.30 1 5 Years Dry Pipe Valves - Strainers, fitters, orifices 12.4.4.1.6 2.1 T Annually Alarm Devices (90 Sec) 5.3.3 12.2.7 12.2.6 2.2 T Annually Main Drain Test (Enter data on Page 1) 12.2.6.1 12.3.3.4 2.3 T Annually Antifreeze Test 5.3.4 2.4 T Annually Control Valve - Position 12.3.3.1 2.5 T Annually Control Valve — Operation :12.3.3.1 2.6 T Annually Supervisory 12.3.3.5 2.7 T Annually Preaction Valve — Priming Water 12.4.3.2.1 x 2.8 T Annually Preaction Valve - low Air Pressure Alarm 12.4.3.2.10 2.9 T Annually Preaction Valve — FuII:Flow Trip Test 12.4.3.2.2 Inspection, Testing, and Maintenance Fire Sprinkler System Page 3 of 4 NFPA 25, Chapter. 5 as amended, by CCR, Title 19 Date of Inspection, Testing, Maintenance: KO System Riser ID: Property Info ation: Type of System: Name: Address: [DO / c Wet Pipe ❑ Dry Pipe Dry Pip u�• ❑ n D Deluge � �` M� ba City. Item Activity Frequency Description NFPA 25 Reference Fail N/A Pass 2.10 T Annually Dry Pipe Valve — Priming Water 12.4.4.2.1 2.11 T Annually Dry Pipe Valve — Low Air Pressure 12.4.4.2.6 Alarm 2.12 T Annually Dry Pipe Valve — Quick- Opening 12.4.4.2.4 Device 2.13 T Annually • Dry Pipe Valve — Trip Test 12.4.4.2.2 2.14 T Annually Backflow Preventer Assemblies 12.6.2 2.15 TI., 3 Years Dry Pipe Valve — Full Flow Trip Test 12.4.4.2.2.2 2.16 T 5 Years Gauges 5.3.2 2.17 T 5 Years Pressure Reducing Valve 12.5.1.2 2.18 T 5 Years Fire Department Connection Backflush 12.7.4 2.19 T 5 Years Sprinklers — Extra High Temperature 5.3.1.1.1.3 2.20 T 5 Years Sprinklers — Corrosive environment or 5.3.1.1.2 corrosive water 2.21 T 10 Years Sprinklers - Dry 5.3.1.1.1.5 2.22 T 20 Years Sprinklers - Fast Response 5.3.1.1.1.2 2.23 T 50 Years Sprinklers 5.3.1.1.1 2.24 T 75 Years Sprinklers 75 years in service 5.3.1.1.1.4 2.25 T Sprinklers manufactured prior to 1920 5.3.1.1.1.1 X — Re lace 3.1 M Annually Control Valves 12.3.4 3.2 M Annually Preaction /Deluge Valves 12.4.3.3.2 3.3 M Annually Dry Pipe Valves/Quick- .Opening 12.4.4.3.2 Devices 3.4 M Annually Dry Pipe Valve — Low Point Drains 12.4.4.3.3 3.5 M 5 Years Obstruction Investigation Chapter 13 u Item Inspection, Testing, and Maintenance Fire Sprinkler System IUFPA 25, Cha ter 5'.asatnanded by CGR, Title 19 Page 4 of 4 Date of Inspection, Testing, Maintenance: � -) b System Riser ID: Property Info ation: of CAk/,o Name: Tye of System: Wet Pipe �Q °p2 C ❑ Dry Pipe Address: �o t lJ�� ❑. Preaction ❑ Deluge City: u Item Deficiencies .and Comments: Deficiencies and Comments Item number must correspond to the Item number of the Activi .-fisted4bove: d �J O See Continuation Page(s) (Indicate .the mbe ro continuation pages) PASS ❑ FAIL U Signature Date