HomeMy WebLinkAboutSPRINKLER SYSTEM CHK 12-2010r
Design, Installation, Inspection, & Repair of Fire Sprinkler Systems
Bakersfield San Francisco Livermore
IIIIIIIIVIIIIIIIIII 53
DATE: December 2010 IE
We herewith enclose a copy of an automatic fire sprinkler system check
report for the following facility:
Kern Federal Credit Union
1717 Truxtun Avenue
Bakersfield, CA 93301
to the party checked below:
Owner: Kern Federal Credit Union
1717 Truxtun Avenue
Bakersfield, CA 93301
Fire Dept: Bakersfield City Fire Department
Fire Prevention Division
1501 Truxtun Avenue
Bakersfield, CA 93301
Thank You
RLH Fire Protection
File: 7180
cc:
IIIIIII VIII III IIII 54
IE
R L H Fire Protection
3430 Unicorn Rd. Bakersfield, CA 93308 Voice:661.322.9344 Fax:661.322.6816 Lic.# 777717
ANNEX B
Inspection, Testing, and Maintenance Fire Sprinkler System
NFPA 25 Chapter 5 as amended by CCR Title 19
Abbreviation Key:
Initial Static Pressure: (psi)
Date Of Inspection, Testing, Maintenance: 12/30/2010
System Riser ID: 7180
T =Test
Residual Pressure: (psi)
Property Information:
Type Of System:
y IF 4' 1
Name: Kern Federal Credit Union
Wet Pipe
Item
Activity
Address: 1717 Truxtun Avenue
❑ Dry Pipet.
NFPA 25
Reference
- -...
N/A
❑ Preaction►
1.1
1
Daily
❑ Deluge
12.4.3.1
City: Bakersfield
Main Drain Test Results:
Abbreviation Key:
Initial Static Pressure: (psi)
I = Inspection
T =Test
Residual Pressure: (psi)
M = Maintenance
A -O = After Operation
Restored Static Pressure: (psi)
MI = Per Manufacturer's Instructions
Item
Activity
Frequency
Description
NFPA 25
Reference
Fail
N/A
Pass
1.1
1
Daily
Preaction /Deluge Valves - Enclosure
12.4.3.1
X
Weekly
temperature
1.2
I
Daily
Dry Pipe Valves - Enclosure
12.4.4.1.1
X
WeekIv
temperature
1.3
1
Quarterly
Gauges - (Dry, Preaction, Deluge
5.2.4.2
X
S stems )
5.2.4.3
1.4
1
Quarterly
Control Valves
12.3.2.1
X
1.5
1
Quarterly
Alarm Devices
5.2.6
X
1.6
1
Quarterly
Gauges (Wet Pipe Systems)
5.2.4.1
X
1.7
1
Quarterly
Hydraulic nameplate
5.2.7
X
1.8
1
Quarterly
Pipe and Fittings
5.2.2
X
1.9
1
Quarterly
Sprinklers
5.2.1
X
1.10
1
Quarterly
Spare Sprinklers
5.2.1.3
X
1.11
!
Quarterly
Fire Department Connections
12.7.1
X
1.12
I
Quarterly
Alarm Valves - Exterior Inspection
12.4.1.1
X
1.13
I
Quarterly
Preaction /Deluge Valves - Exterior
12.4.3.1.6
X
Inspection
1.14
1
Quarterly
Pressure Reducing Valves
12.5.1.1
X
1.15
1
Quarterly
Dry Pipe Valves- Exterior Inspection
12.4.4.1.4
X
1.16
1
Quarterly
Backflow Preventers
12.6.1
X
1.17
1
Annual
Buildings
5.2.5
X
State Fire Marshal AES 2
March 21, 2006
Inspection performed by: RLH Fire Protection - Bakersfield, CA - 777717 Page 1 of 5
ANNEX B
Item
Inspection, Testing, and Maintenance Fire Sprinkler System
NFPA 25 Chapter 5 as amended bv CCR Title 19
Frequency
Date Of Inspection, Testing, Maintenance: 12/30/2010
System Riser ID: 7180
Fail
Property Information:
Pass
Type Of System:
Ca��'cp
Name: Kern Federal
Credit Union
❑x Wet Pipe
,����
.p
Address: 1717 Truxtun
Avenue
❑ Dry Pipe
°' y
Annually
Seismic Braces
❑ Preaction
`9► ., .
X
1.20
1
5 Years
Hangers (Accessible concealed spaces)
❑ Deluge
.. SAE M
City: Bakersfield
1.21
1
Item
Activity
Frequency
Description
NFPA 25
Reference
Fail
N/A
Pass
1.18
1
Annually
Hangers
5.2.3
X
1.19
1
Annually
Seismic Braces
5.2.3
X
1.20
1
5 Years
Hangers (Accessible concealed spaces)
5.2.3.3
X
1.21
1
5 Years
Seismic Braces (Accessible concealed
spaces)
5.2.3.3
X
1.22
1
5 Years
Pipe and Fittings (Accessible concealed
spaces
5.2.2.3
X
1.23
1
5 Years
Sprinklers (Accessible concealed spaces)
5.2.1.1.4
X
1.24
1
5 Years
Alarm Valves - Interior Inspection
12.4.1.2
X
1.25
1
5 Years
Alarm Valves - Strainers, filters, orifices
12.4.1.2
X
1.26
1
5 Years
Check Valves - Interior Inspection
12.4.2.1
X
1.27
1
5 Years
Preaction /Deluge Valves - Interior
Inspection
12.4.3.1.7
X
1.28
1
5 Years
Preaction /Deluge Valves - Strainers,
filters, orifices
12.4.3.1.8
X
1.29
1
5 Years
Dry Pipe Valves - Interior Inspection
12.4.4.1.5
X
1.30
1
5 Years
Dry Pipe Valves - Strainers, filters, orifices
12.4.4.1.6
X
2.1
T
Annually
Alarm Devices (90 Sec)
5.3.3
12.2.7
X
2.2
T
Annually
Main Drain Test (Enter data on Page 1)
12.2.6
12.2.6.1
12.3.3.4
X
2.3
T
Annually
Antifreeze Test
5.3.4
X
2.4
T
Annually
Control Valve - Position
12.3.3.1
X
2.5
T
Annually
Control Valve - Operation
12.3.3.1
X
2.6
T
Annually
Supervisory
12.3.3.5
X
2.7
T
Annually
Preaction Valve - Priming Water
12.4.3.2.1
X
2.8
T
Annually
Preaction Valve - Low Air Pressure Alarm
12.4.3.2.10
X
2.9
T
Annually
Preaction Valve - Full Flow Trip Test
12.4.3.2.2
X
State Fire Marshal AES 2
March 21, 2006
Inspection performed by: RLH Fire Protection - Bakersfield, CA - 777717 Page 2 of 5
Inspection, Testing, and Maintenance Fire Sprinkler System
NFPA 25 Chapter 5 as amended bv CCR Title 19
Date Of Inspection, Testing, Maintenance: 12/30/2010
System Riser ID: 7180
Property Information:
- -- - -- .
Type Of System: �F C9
Name: Kern Federal Credit Union
Wet Pipe
Address: 1717 Truxtun Avenue
❑ Dry Pipe `� a
❑ Preaction
❑ Deluge
City: Bakersfield
NFPA 25
Item
Activity
Frequency
Description
Reference
Fail
N/A
Pass
2.10
T
Annually
Dry Pipe Valve - Priming Water
12.4.4.2.1
X
2.11
T
Annually
Dry Pipe Valve - Low Air Pressure
12.4.4.2.6
X
Alarm
2.12
T
Annually
y
ry Pipe Valve - Quick- Opening
12.4.4.2.4
X
Device
2.13
T
Annually
Dry Pipe Valve - Trip Test
12.4.4.2.2
X
2.14
T
Annually
Backflow Preventor Assemblies
12.6.2
X
2.15
T
3 Years
Dry Pipe Valve - Full Flow Trip Test
12.4.4.2.2.2
X
2.16
T
5 Years
Gauges
5.3.2
X
2.17
T
5 Years
Pressure Reducing Valve
12.5.1.2
X
2.18
T
5 Years
Fire Department Connection Backflush
12.7.4
X
2.19
T
5 Years
Sprinklers - Extra High Temperature
5.3.1.1.1.3
X
2.20
T
5 Years
Sprinklers - Corrosive environment or
5.3.1.1.2
X
corrosive water
2.21
T
10 Years
Sprinklers - Dry
5.3.1.1.1.5
X
2.22
T
20 Years
Sprinklers - Fast Response
5.3.1.1.1.2
X
223
T
50 Years
Sprinklers
5.3.1.1.1
X
2.24
T
75 Years
Sprinklers 75 years in service
5.3.1.1.1.4
X
2.25
T
Sprinklers manufactured prior to 1920
5.3.1.1.1.1
X
- Re lace
3.1
M
Annually
Control Valves
12.3.4
X
3.2
M
Annually
Preaction /Deluge Valves
12.4.3.3.2
X
3.3
M
Annually
Dry Pipe Valves /Quick- Opening
12.4.4.3.2
X
Devices
3.4
M
Annually
Dry Pipe Valve - Low Point Drains
12.4.4.3.3
X
3.5
M
5 Years
Obstruction Investigation
Chapter 13
X
State Fire Marshal AES 2
March 21, 2006
Inspection performed by: RLH Fire Protection - Bakersfield, CA - 777717 Page 3 of 5
ANNEX B
Inspection, Testing, and Maintenance Fire Sprinkler System
NFPA 25 Chapter 5 as amended by CCR Title 19
Date Of Inspection, Testing, Maintenance: 12/30/2010
Property Information:
Name: Kern Federal Credit Union
Address: 1717 Truxtun Avenue
City: Bakersfield
System Riser ID: 7180
Type Of System:
�pF CA4��oQ
❑x Wet Pipe
❑ Dry Pipe °q q
❑ Preaction �► ,,
❑ Deluge t49E to
Item
Deficiencies and Comments:
Deficiencies and Comments Item number must correspond to the Item number
of the activity listed above:
❑ See Continuation Page(s) (Indicate the number of continuation pages)
❑x PASS
F1 FAIL 12/30/2010
Signature Date
State Fire Marshal AES 2
March 21, 2006
Inspection performed by: RLH Fire Protection - Bakersfield, CA - 777717 Page 4 of 5
Inspection performed by: RLH Fire Protection - Bakersfield, CA - 777717 Page 5 of 5