Loading...
HomeMy WebLinkAboutSPRINKLER SYSTEM CHK 12-2010r Design, Installation, Inspection, & Repair of Fire Sprinkler Systems Bakersfield San Francisco Livermore IIIIIIIIVIIIIIIIIII 53 DATE: December 2010 IE We herewith enclose a copy of an automatic fire sprinkler system check report for the following facility: Kern Federal Credit Union 1717 Truxtun Avenue Bakersfield, CA 93301 to the party checked below: Owner: Kern Federal Credit Union 1717 Truxtun Avenue Bakersfield, CA 93301 Fire Dept: Bakersfield City Fire Department Fire Prevention Division 1501 Truxtun Avenue Bakersfield, CA 93301 Thank You RLH Fire Protection File: 7180 cc: IIIIIII VIII III IIII 54 IE R L H Fire Protection 3430 Unicorn Rd. Bakersfield, CA 93308 Voice:661.322.9344 Fax:661.322.6816 Lic.# 777717 ANNEX B Inspection, Testing, and Maintenance Fire Sprinkler System NFPA 25 Chapter 5 as amended by CCR Title 19 Abbreviation Key: Initial Static Pressure: (psi) Date Of Inspection, Testing, Maintenance: 12/30/2010 System Riser ID: 7180 T =Test Residual Pressure: (psi) Property Information: Type Of System: y IF 4' 1 Name: Kern Federal Credit Union Wet Pipe Item Activity Address: 1717 Truxtun Avenue ❑ Dry Pipet. NFPA 25 Reference - -... N/A ❑ Preaction► 1.1 1 Daily ❑ Deluge 12.4.3.1 City: Bakersfield Main Drain Test Results: Abbreviation Key: Initial Static Pressure: (psi) I = Inspection T =Test Residual Pressure: (psi) M = Maintenance A -O = After Operation Restored Static Pressure: (psi) MI = Per Manufacturer's Instructions Item Activity Frequency Description NFPA 25 Reference Fail N/A Pass 1.1 1 Daily Preaction /Deluge Valves - Enclosure 12.4.3.1 X Weekly temperature 1.2 I Daily Dry Pipe Valves - Enclosure 12.4.4.1.1 X WeekIv temperature 1.3 1 Quarterly Gauges - (Dry, Preaction, Deluge 5.2.4.2 X S stems ) 5.2.4.3 1.4 1 Quarterly Control Valves 12.3.2.1 X 1.5 1 Quarterly Alarm Devices 5.2.6 X 1.6 1 Quarterly Gauges (Wet Pipe Systems) 5.2.4.1 X 1.7 1 Quarterly Hydraulic nameplate 5.2.7 X 1.8 1 Quarterly Pipe and Fittings 5.2.2 X 1.9 1 Quarterly Sprinklers 5.2.1 X 1.10 1 Quarterly Spare Sprinklers 5.2.1.3 X 1.11 ! Quarterly Fire Department Connections 12.7.1 X 1.12 I Quarterly Alarm Valves - Exterior Inspection 12.4.1.1 X 1.13 I Quarterly Preaction /Deluge Valves - Exterior 12.4.3.1.6 X Inspection 1.14 1 Quarterly Pressure Reducing Valves 12.5.1.1 X 1.15 1 Quarterly Dry Pipe Valves- Exterior Inspection 12.4.4.1.4 X 1.16 1 Quarterly Backflow Preventers 12.6.1 X 1.17 1 Annual Buildings 5.2.5 X State Fire Marshal AES 2 March 21, 2006 Inspection performed by: RLH Fire Protection - Bakersfield, CA - 777717 Page 1 of 5 ANNEX B Item Inspection, Testing, and Maintenance Fire Sprinkler System NFPA 25 Chapter 5 as amended bv CCR Title 19 Frequency Date Of Inspection, Testing, Maintenance: 12/30/2010 System Riser ID: 7180 Fail Property Information: Pass Type Of System: Ca��'cp Name: Kern Federal Credit Union ❑x Wet Pipe ,���� .p Address: 1717 Truxtun Avenue ❑ Dry Pipe °' y Annually Seismic Braces ❑ Preaction `9► ., . X 1.20 1 5 Years Hangers (Accessible concealed spaces) ❑ Deluge .. SAE M City: Bakersfield 1.21 1 Item Activity Frequency Description NFPA 25 Reference Fail N/A Pass 1.18 1 Annually Hangers 5.2.3 X 1.19 1 Annually Seismic Braces 5.2.3 X 1.20 1 5 Years Hangers (Accessible concealed spaces) 5.2.3.3 X 1.21 1 5 Years Seismic Braces (Accessible concealed spaces) 5.2.3.3 X 1.22 1 5 Years Pipe and Fittings (Accessible concealed spaces 5.2.2.3 X 1.23 1 5 Years Sprinklers (Accessible concealed spaces) 5.2.1.1.4 X 1.24 1 5 Years Alarm Valves - Interior Inspection 12.4.1.2 X 1.25 1 5 Years Alarm Valves - Strainers, filters, orifices 12.4.1.2 X 1.26 1 5 Years Check Valves - Interior Inspection 12.4.2.1 X 1.27 1 5 Years Preaction /Deluge Valves - Interior Inspection 12.4.3.1.7 X 1.28 1 5 Years Preaction /Deluge Valves - Strainers, filters, orifices 12.4.3.1.8 X 1.29 1 5 Years Dry Pipe Valves - Interior Inspection 12.4.4.1.5 X 1.30 1 5 Years Dry Pipe Valves - Strainers, filters, orifices 12.4.4.1.6 X 2.1 T Annually Alarm Devices (90 Sec) 5.3.3 12.2.7 X 2.2 T Annually Main Drain Test (Enter data on Page 1) 12.2.6 12.2.6.1 12.3.3.4 X 2.3 T Annually Antifreeze Test 5.3.4 X 2.4 T Annually Control Valve - Position 12.3.3.1 X 2.5 T Annually Control Valve - Operation 12.3.3.1 X 2.6 T Annually Supervisory 12.3.3.5 X 2.7 T Annually Preaction Valve - Priming Water 12.4.3.2.1 X 2.8 T Annually Preaction Valve - Low Air Pressure Alarm 12.4.3.2.10 X 2.9 T Annually Preaction Valve - Full Flow Trip Test 12.4.3.2.2 X State Fire Marshal AES 2 March 21, 2006 Inspection performed by: RLH Fire Protection - Bakersfield, CA - 777717 Page 2 of 5 Inspection, Testing, and Maintenance Fire Sprinkler System NFPA 25 Chapter 5 as amended bv CCR Title 19 Date Of Inspection, Testing, Maintenance: 12/30/2010 System Riser ID: 7180 Property Information: - -- - -- . Type Of System: �F C9 Name: Kern Federal Credit Union Wet Pipe Address: 1717 Truxtun Avenue ❑ Dry Pipe `� a ❑ Preaction ❑ Deluge City: Bakersfield NFPA 25 Item Activity Frequency Description Reference Fail N/A Pass 2.10 T Annually Dry Pipe Valve - Priming Water 12.4.4.2.1 X 2.11 T Annually Dry Pipe Valve - Low Air Pressure 12.4.4.2.6 X Alarm 2.12 T Annually y ry Pipe Valve - Quick- Opening 12.4.4.2.4 X Device 2.13 T Annually Dry Pipe Valve - Trip Test 12.4.4.2.2 X 2.14 T Annually Backflow Preventor Assemblies 12.6.2 X 2.15 T 3 Years Dry Pipe Valve - Full Flow Trip Test 12.4.4.2.2.2 X 2.16 T 5 Years Gauges 5.3.2 X 2.17 T 5 Years Pressure Reducing Valve 12.5.1.2 X 2.18 T 5 Years Fire Department Connection Backflush 12.7.4 X 2.19 T 5 Years Sprinklers - Extra High Temperature 5.3.1.1.1.3 X 2.20 T 5 Years Sprinklers - Corrosive environment or 5.3.1.1.2 X corrosive water 2.21 T 10 Years Sprinklers - Dry 5.3.1.1.1.5 X 2.22 T 20 Years Sprinklers - Fast Response 5.3.1.1.1.2 X 223 T 50 Years Sprinklers 5.3.1.1.1 X 2.24 T 75 Years Sprinklers 75 years in service 5.3.1.1.1.4 X 2.25 T Sprinklers manufactured prior to 1920 5.3.1.1.1.1 X - Re lace 3.1 M Annually Control Valves 12.3.4 X 3.2 M Annually Preaction /Deluge Valves 12.4.3.3.2 X 3.3 M Annually Dry Pipe Valves /Quick- Opening 12.4.4.3.2 X Devices 3.4 M Annually Dry Pipe Valve - Low Point Drains 12.4.4.3.3 X 3.5 M 5 Years Obstruction Investigation Chapter 13 X State Fire Marshal AES 2 March 21, 2006 Inspection performed by: RLH Fire Protection - Bakersfield, CA - 777717 Page 3 of 5 ANNEX B Inspection, Testing, and Maintenance Fire Sprinkler System NFPA 25 Chapter 5 as amended by CCR Title 19 Date Of Inspection, Testing, Maintenance: 12/30/2010 Property Information: Name: Kern Federal Credit Union Address: 1717 Truxtun Avenue City: Bakersfield System Riser ID: 7180 Type Of System: �pF CA4��oQ ❑x Wet Pipe ❑ Dry Pipe °q q ❑ Preaction �► ,, ❑ Deluge t49E to Item Deficiencies and Comments: Deficiencies and Comments Item number must correspond to the Item number of the activity listed above: ❑ See Continuation Page(s) (Indicate the number of continuation pages) ❑x PASS F1 FAIL 12/30/2010 Signature Date State Fire Marshal AES 2 March 21, 2006 Inspection performed by: RLH Fire Protection - Bakersfield, CA - 777717 Page 4 of 5 Inspection performed by: RLH Fire Protection - Bakersfield, CA - 777717 Page 5 of 5