Loading...
HomeMy WebLinkAbout2500 WIBLE RD_UST MINOR MOD 10.6.09HOODS ALARMS SPRINKLER SYSTEMS 3P AV BOOTH. AST UST Permit No. Permit No. Permit No. Permit No. Permit No. Permit No. IIIlilllillillllllll 4� � 1E File Number: 166532 7 Address: -Bakersfield,, 0-A 933.__ Date Received: -off Business Name.: SYSTEM: BUILDING NG SQUARE FEET: New Mod. ❑ ❑ Underground Storage Tank rnodificatio riderground Storage Tank removal Underground Storage Tank ❑ ❑ Other q-/" 0 uNpc j e 2 Comments: INSPECTION LOG Date Time ❑ Commercial Hood System !Building S qi Feet: ❑ ❑ Fife A10 rm 1­ S YAt, bn calculation Bldor $q Ft: ❑ ❑ Fire Sprinkler System 2. ❑ 0 Spray Finish -System 3. ❑ ❑ Aboveground Storage Tank 4. ❑ ❑ Underground Storage Tank rnodificatio riderground Storage Tank removal Underground Storage Tank ❑ ❑ Other q-/" 0 uNpc j e 2 Comments: INSPECTION LOG Date Time . . .. . .. .. .. .. .. . .. . . .. .. .. .. .. .. .. .. .. .. .. . .. .......... . . ....... .... .... . .. . ..... . . .. .... .. .. ...... .. Signature Signature )-Z��� v )'S BA�.3 00 a Cpj Go tj Q4_4 A) d I PJ kA b, C- 1 2- . . .. . .. .. .. .. .. . .. . . .. .. .. .. .. .. .. .. .. .. .. . .. .......... . . ....... .... .... . .. . ..... . . .. .... .. .. ...... .. Signature Signature )-Z��� v `J� �o� ba a Cpj Go tj Q4_4 A) d I PJ kA b, C- 1 2- r�7 c-7b I 48 I 'k .t i' :.iu� 9P' � &� �k. h �. e ry? S� i {k'Y.kres;'ay Ri tG ; �� nRb4 �t ?i�'k & £4�� J � ��, NOTICE Attention: Bakersfield Fire Department Address; 1600 Truxton Ave, Ste. 401 David Weirather Bakersfield, CA 93301 Date: 10/7/2009 Notes: Please process attached repair modification permit for the required SB989 repairs and retesting for the following site: Market Express Inclusions: (1) Permit Application 2500 Wible Rd. (1) Check #47065, $192.00 Bakersfield, CA Upon approval of the permit please fax a copy to (559) 688 -1467. If you have any questions or comments please call (559) 688 -2977, ext. 3002. 7 ct `. 1100 North J Street, Tulare, CA 93274 (559) 688 -2977 or (800) 655 -3436 Fax (559) 688 -1467 www.ftanzen-hill.com WYA 0s] General Reauirements for all USTs JUNE 2008 Corrosion Spill Buckets Overfill Options UDC Protection Required on all Required on all USTs. If tank system constructed Pre- July 1, • All USTs USTs. No manual override and meets one of the following 2003 shall be options: • SW UDC construction with • Device activates at 90 %; restricts flow or triggers audible and visual alarm. (Devices such as ATG OR Ball float/vent valve may be used to fulfill this requirement.) CCR 2635(b)(2)(A) Device activates at 95 %; restricts flow and activates audible alarm five minutes before overfill. (Devices used in conjunction with each other such as ball float/vent valves, ATG's, and external audible and visual alarms may be used to fulfill this requirement.) CCR 2635(b)(2)(B) Device activates at 95 %; provides positive shutoff of flow to the tank. (Devices such as drop tubes/flapper valves may be used to fulfill this requirement.) CCR 2635(b)(2)(C) • Device activates before.fittings are exposed to product and provides positive shutoff. (Devices such as drop tube/flapper valves may be used to fulfill this requirement.) CCR 2635(b)(2)(D) continuous monitoring. CCR 2636(g)(C) • Testing required every three years. HSC 25284.1; CCR 2637 If tank system constructed on or after July 1, 2003: • Must be liquid and vapor tight. • For monitoring of UDC see "Monitoring of Double- walled Piping Installed Before July 1, 2004 ". HSC 25290.2 If tank system constructed on or after July 1. 2004: • Must be liquid and vapor tight • Required construction depends on • Requirement may be waived by local agency if all of piping configuration. the following conditions are met: -Inlet exists in observable area. • For monitoring of UDC see -Spill container adequate to collect any overfill. "Monitoring of Double - walled Piping -Tank system filled by no more than 25 gallons at one Installed after July 1, 2004 ". time. CCR 2635 (b)(3). Also see LG -150 HSC 25290.1 . en'S. Acr Page 2 of 7 resistant to • Minimum 5 gallon corrosion or capacity. have corrosion CCR 2635(b)(1)(B) protection. e Resistant to galvanic corrosion OR OR • Method to rem_ ove liquid from the • Components bucket. must be CCR 2635(b)(1)(C) isolated from the backfll, •Required to be OR including tested annually. turbines, risers, and spill HSC 25284.1, 25284.2 Also See LG -166 buckets. OR 40 CFR 280.31, 280.70; CCR 2635 (a)(2); 2636 (b), 2662(c) • Device activates at 90 %; restricts flow or triggers audible and visual alarm. (Devices such as ATG OR Ball float/vent valve may be used to fulfill this requirement.) CCR 2635(b)(2)(A) Device activates at 95 %; restricts flow and activates audible alarm five minutes before overfill. (Devices used in conjunction with each other such as ball float/vent valves, ATG's, and external audible and visual alarms may be used to fulfill this requirement.) CCR 2635(b)(2)(B) Device activates at 95 %; provides positive shutoff of flow to the tank. (Devices such as drop tubes/flapper valves may be used to fulfill this requirement.) CCR 2635(b)(2)(C) • Device activates before.fittings are exposed to product and provides positive shutoff. (Devices such as drop tube/flapper valves may be used to fulfill this requirement.) CCR 2635(b)(2)(D) continuous monitoring. CCR 2636(g)(C) • Testing required every three years. HSC 25284.1; CCR 2637 If tank system constructed on or after July 1, 2003: • Must be liquid and vapor tight. • For monitoring of UDC see "Monitoring of Double- walled Piping Installed Before July 1, 2004 ". HSC 25290.2 If tank system constructed on or after July 1. 2004: • Must be liquid and vapor tight • Required construction depends on • Requirement may be waived by local agency if all of piping configuration. the following conditions are met: -Inlet exists in observable area. • For monitoring of UDC see -Spill container adequate to collect any overfill. "Monitoring of Double - walled Piping -Tank system filled by no more than 25 gallons at one Installed after July 1, 2004 ". time. CCR 2635 (b)(3). Also see LG -150 HSC 25290.1 . en'S. Acr Page 2 of 7 SWRCB JUNE 2008 A GENERAL OVERVIEW OF UNDERGROUND STORAGE TANK (UST) CONTAINMENT AND MONITORING REQUIREMENTS The attached tables outline tank system requirements in general terms; and are not meant to. detail all requirements.. , References to the Health and Safety Code and the California Code of Regulations. throughout this Overview are intended to be useful but are not necessarily exhaustive of all legal references that'might apply or be relevant to a specific requirement. Laws and regulations are subject to change, so the references contained herein may not be up to date. For more specific information or details on UST system components, monitoring options,-etc., you will need to refer to the relevant statutes and regulations (Health and Safety Code, Division 20, Chapter 6.7 and Title 23, *California Code of Regulations, Division 3, Chapter 16). ACRONYMNS TG: automatic tank gauge SW. single-walled -A DW. double - walled SIR: statistical inventory reconciliation - CITLD: continuous`in-tank leak ,detection UDC: under- dispenser containment GW: groundwater . VPH: vacuum, pressure, hydrostatic LLD: line leak detector Page 1 of 7 SWRCB JUNE 2008 Piping Containment and Monitoring Year of Tank Product Piping Construction Turbine Containment Fill Riser Vent and Vapor Piping Installation Type Containment On or before Motor Vehicle Fuel Tanks: Not required, but turbine and Requirement depends SW January 1, 1984 SW Construction riser requited to have corrosion on overfill method. • Fiberglass reinforced protection. Existing piping plastic. HSC 25292(e)(2) only. • Steel with corrosion protection for all steel /metal OR DW Construction HSC 25292(e)(1) After January 1, • Required. Requirement depends SW 1984 -July 1, DW on overfill method. 1987 OR SW (if certain conditions are • SW Construction. met.) Remote fill piping HSC 25291(a)(7); CCR 2636(a)(3)(b) CCR 2636 may be SW if sloped to the tank. After July 1, DW Construction, unless connected • Required. Requirement depends SW CCR 2636(a)(1) 1987 -June 30, to suction dispensing system that on overfill method. 2003 meets safe - suction requirements. • SW Construction. OR DW (if designed to contain liquid - HS 25291(a); CCR 2636(a) CCR 2636 See LG -150 phase product) CCR 2636(a)(2) July 1, 2003- DW • Product -tight (liquid and vapor) Secondary • Secondary Containment June 30, 2004 required. HSC 25290.2(x) Containment required. required. HSC 25290.2(c) HSC 25290.1(c) SW HSC 25290.2(c) Liquid and vapor tight. HSC 25290.1(a) OR DW Construction z On or After July DW • Product -tight (liquid and vapor) Secondary • Secondary. Containment 1, 2004 required. HSC 25290. 1 (a) Containment required. required. HSC 25290.1(c) HSC 25290.1(c) SW HSC25290.1(c) • Liquid and vapor tight. OR DW Construction 2 HSC 25290.1(x) ` Depends on piping configuration within the sump. Page 4 of 7 SWRCB Monitorinq Requirements of Sinqle- walled Piping Tvves JUNE 2008 Pressurized Emergency Generator System Suction Conventional Safe Suction Gravity *An automatic line Pressurized: • 0.1 gph triennial No requirements if all • 0.1 gph Biennial line test. leak detector that • An automatic line leak line test; criteria are met: - detects a 3.0 gph detector that detects a 3.0 CCR 2643(e) leak_. The automatic gph leak. The automatic AND • below -grade piping line leak detector line leak detector must be operates at less than shall be capable of connected to.an audible • Daily visual. atmospheric pressure. shutting off the pump and visual alarm to� monitoring of suction when a release indicate a release system for presence CCR2636(a)(3)(A) occurs and shall_shut malfunction:of the system.. of air. (Inspection log .below -grade piping is down the pumping CCR 2643(c)(1); 2666 required.) sloped so the contents system automatically, AND CCR 2643(4) drain back into tank if if the automatic line leak detector fails or suction is released. 0.2 gph is disconnected. monthly line CcR2s3s(a)(3)(s) CCR 2643(c); 2666 test. • No valves or pumps AND cCR 2643(c)(2) installed below grade in 0.2 gph monthly line OR _ line gph annual line test: suction line. cCR2636(a)(3)(c) test. CCR . 643(c)(2) CCR 2643(c)(3) • Only one check valve installed directly below and OR 0.1 gph Suction: as close as practical so annual line • 0.1 gph triennial line test suction pump. test.. AND CCR 2636 (a)(3)(C) CCR 2643(c)(3), 2666, • Daily or monthly visual • is inspected by method monitoring of the suction that readily demonstrates system for presence of air. that requirements are met. (Inspection log required. CCR 2636(a)(3)(D) CCR 2643(d) Page 5 of 7 SWRCB Monitoring Requirements of Double- walled Piping Installed On or After July 1, 2004 I1I1III W11ORI Option 1 Option 2 Option 3 • The entire piping length, including piping • The interstitial space between the primary • The single - walled transition pipe or within sumps or UDC's, must be monitored containment (i.e., single - walled transition pipe or fill fill piping must be contained within a using vacuum, pressure, or interstitial liquid piping) and secondary containment (i.e., sump or double - walled sump and /or double - level measurement methods; UDC) must be continuously monitored using walled UDC that either: extends to the well. vacuum or pressure; surface, or has a double - walled AND product tight lid that is continuously • Sumps and UDC's require sensors AND monitored using vacuum, pressure, or capable of detecting liquid and vapor • No sensors in sumps and UDC's required; interstitial liquid level measurement releases from the primary containment; methods; AND AND • 3.0 gph LLD for pressurized piping. AND • 3.0 gph LLD for pressurized piping. • Sumps and UDC's required to have sensors that are capable of detecting liquid releases; AND • 3.0 gph LLD for pressurized piping. HSC 25290.1 HSC 25290.1 HSC 25290.1 Enhanced Leak Detection (ELD) Testing Notification Single- walled Component Systems Double - walled Component Systems Enhanced leak detection testing must be Must conduct testing every three years. Must conduct a one -time test. conducted if notified by the State Water Resources Control Board, and are located within 1000 feet of a public drinking water well. Page 7 of 7 UNDERGROUND STORAGE TANK PERMIT APPLICATION ' 8 $ a p n TO CONSTRUCT- INSTALL NEW TANK (NEW FACILITY) /NEW TANK INSTALL (EXISTING FACILITY) /MOD -MINOR MOD ARlM ! Permit # oej.Lpp�-Z�y=j BAKERSFIELD FIRE DEPARTMENT Prevention Services 1600 Truxtun Ave., Suite 401 Bakersfield, CA 93301 Phone: 661-326-3979 • Fax: 661-852-2171 Page 1 of 1 TYPE OF APPLICATION: ❑ NEW TANK INSTALL /NEW FACILITY \❑/ NEW TANK INSTALL/EXISTING FACILITY trHFCK ()NF ONI Y1 rl MODIFICATION OF FACILITY .Hr MINOR MODIFICATION OF FACILITY STARTING DATE/� PROPOSED COMP ETION DATE FACILITY NAME EXISTING FACILITY PERMIT # FACILITY ADDRESS - 17?AhLS9dA ZIP CODE TYPE OF BUSINESS r APN # TANK OWNER PHONE # ADDRESS CITY ZIP CODE CONTRACTOR n n Ij CA ICC # ( ( i ADDRESS j too v N�� cn*- ZIP CODF� ` PHONE BAKERSFIELD CITY BUSINESS LICENSE # W` COM D IN MR ' BRIEFLY DESCRIBE THE WORK TO BE DONE: 1 Uj WATER TO FACILITY PROVIDED BY DEPTH TO GROUND WATER SOIL TYPE EXPECTED AT SITE # OF TANKS TO BE INSTALLED FARE THEY FOR MOTOR FUEL? YES ❑ NO SPILL PREVENTION CONTROL AND COUNTERMEASURES PLAN ON FILE? ❑ YES ❑ NO THIS SECTION IS FOR MOTOR FUEL STORAGE TANKS TANK # VOLUME UNLEADED REGULAR PREMIUM DIESEL AVIATION THIS SECTION IS FOR NON -MOTOR FUEL STORAGE TANKS TANKS* VOLUME UNLEADED REGULAR PREMIUM DIESEL AVIATION FOR OFFICIAL USE ONLY APPLICATION DATE ID FACILITY # # OF TANKS FEES $ THE APPLICANT HAS RECEIVED, UNDERSTANDS, AND WILL COMPLY WITH THE ATTACHED CONDITIONS OF THIS PERMIT AND ANY OTHER STATE, LOCAL, AND FEDERAL REGULATIONS. THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY, AND TO THE BEST OF MY KNOWLEDGE IS TRUE AND CORRECT. A RD )ED BY PLICANT NAME (PRINT) A CANTS ATURE - v 1 TQH, E APPLICATION BECOMES A PERM IT W OVED P rr'S ff o 1\ R p PP-O\-)C1 FD2086 (Rev 06/07) 2 :5 0 3 vl �1lull CITE" OF BAIL *SFIELD OFFICE OF ENVIRONMENTAL SERVICES CIS 1715 Chester Ave.,.Bakersfie ( d, CA (661) 326 -3979 P.� U. 10 INSPECTION RECORD POST CARD : %f JOB SITE Facility .t Owner Z Address 'g-soo ���tL Address City. Zip City. Zip Phone No. �?� 9(0 ( Permit # t3V,, 3 7 V INSTRUCTIONS: Please call for an inspector only when each group of inspections with the same number are ready. They will run in consecutive order beginning with number I. DO NOT cover work for any numbered group until all items in that group are signed off by the Permitting Authority. Following these instructions will reduce th number of :mquired inspection visits and therefore prevent assessment of additional fees. TANKS AND BACKFILL INSPECTION DATE INSPECTOR Fill Box Lock Backtill of Tank(s) Liner Installation - Piping Monitoring Requirements Type 1 )_S- 7_'c lo Spark Test Certification or of 411 03-d-1 Ua «`a'^ Ul- +7$00 3 .4 ^O Cathodic Protection of Tank(s) O� v�wM" L o7SOtC e3-1-0't 3T31 LIM Piping & Raceway w /Collection Sump U /r.,tn,.. V, ntn: fib'_ A 1%, 1 C.i ^C!_ 4 Lf I IXY/ F 1 I Corrosion Protection of Piping, Joints, Fill Pipe 1.J"_ Y: S "S I L/- 1 -3 no I V` %[- Electrical Isolation of Piping From Tank(s) Cathodic Protection System- Piping Dispenser Pan LL MIZ413 t• ttvA L Monitoring Wells, Caps & Locks Liner Installation - Tank(s) Fill Box Lock Liner Installation - Piping Monitoring Requirements Type 1 )_S- 7_'c lo Vault With Product Compatible Sealer Level Gauges or Sensors, Float Vent Valves Product Compatible. Fill Boxes) Product Line Leak Detector(s) L Leak Detector(s) for Annual Space -D.W. Tank(s) Monitoring Well(s)/Sump(s) - H2O Test Leak Detection Device(s) for Vadose/Groundwater Spill Prevention Boxes _ f t• ttvA L Monitoring Wells, Caps & Locks Fill Box Lock Monitoring Requirements Type 1 )_S- 7_'c lo Authorization for Fuel Drop ak-- CONTRACTOR B _ eAtt0tvs S LICENSEa 77J'132 'ONTACT__ I.J4)� U614CTU11� ®C� PHONE# &&3