August 22, 2012
Tom Dee
Western Properties
11' 001 River Run Boulevard, Suite 1 02
Bokersfield, CA 93311
RE: Notice of Decision -Site Plan Review (Project No. 12-0259)
Dear Mr. Dee:
Jim Eggert, Planning Director
Planning Division,
Phone: (661) 326-3733
FAX: (66,11) 852-2135
The Planning Director, upon recommendation, of the Site Plan Review Committee, has
approved your plans for to construct a 132-unit apartment complex in an R-2 (Limited Multiple-
Family Dwelling) zone district at 5601 Coffee Road. This approval reflects Zoning Modification
No. 12- 0260, which allows a front yard setback reduction from 15 to five feet and the
construction of 6' -1 O" masonry walls along the northern and southern property boundaries.
Your proposal, with corrections as noted, meets the minimum required codes, policies
and standards for development as adopted by the Bakersfield City Council, Specific items
have been identified (see attached Site Plan, Compliance List) that you need to resolve before
you can obtain a building permit or be allowed occupancy. These, items may include
changes or additions that need to be shown on the final building plans, alert you to specific
fees, and/or are comments that will help you in complying with the city's development
standards. Each item will note when it is to be completed and they have been grouped by
department so that you know who to contact if you have questions.
Your next step is to either apply for necessary building permits to construct your project,
or begin your business activities depending on the request submitted. You must submit final
building plans to the Building Division. The Site Plan Review Committee will review these final
plans while builclang plan check occurs to ensure that you satisfy the items in the Site Plan
Compliance List. Pleaise read them carefully. Failure to satisfy an item may delay your
obtaining a building permit or commencing your project.
After construction, of your project but before the City can allow occupancy, the
Building Division must inspect the development to find if it complies with the approved plans,
and any other relevant permits and codes. If you have satisfied all of the requirements, the
Building Director will issue a certificate of occupancy; of not, the area inspector will give you a
correction notice. Once you have mode all of the corrections, the Building Director can issue
a certificate of occupancy. You may not occupy a development until the Building Director
has issued a certificate of occupancy,
SPR4 12-0259
Page 2 qJ'12
In consideration by the City of Bakersfield for land use entitlements, including but not
limited to related environmental approvals related to or arising from this project, the applicant,
and/or property owner and/or subdivider ("Applicant" herein) agrees to indemnify, defend,
and hold harmless the City of Bakersfield, its officers, agents,, employees, departments,
commissioners or boards ("City " herein) against any and all liability, claims, actions, causes of
actions or demands whatsoever against them, or any of them, before administrative or judicial
tribunals of any kind whatsoever, in any way arising from, the terms and provisions of this
application!, including without limitation any CEQA approval or any re,lated development
approvals, or conditions whether imposed by the City, or not, except for City's sole active
negligence or willful misconduct.
This indemnification condition does not prevent the App5cant from challenging any
decision by the City related to this project and the obligations of this condition apply
regardless of whether any other permits or entitlements are issued.
The City will promptly notify Applicant of any such claim, action, or proceeding, failing
under this condition within thirty (30) days of actually receiving such claim. The City, in its sole
discretion, shall be allowed to choose the attorney or outside law firm to defend the City at
the sole cost and expense of the Applicant and the City is not obligated to use any law firm or
attorney chosen by another entity or party.
Any time after site plan approval but before the approval' expires; you may submit
revisions to the plan. We will treat these, revisions as a new site plan application subject to a
new review and required fees, The Planning Director can only approve minor changes to the
original plan without a new application if they are necessary to meet a condition!, mitigation,
or result from physical obstacles or other comparable constraints,
Approval of this site plan expires on August 21, 2014 (2 years from the decision, date),
unless building:, permits have been issued, or on projects not requiring a building permit, the use
has commenced. The project must be completed within 5 years from the decision date. If the
property is rezoned, site plan approval will) expire upon the effective date for the rezoning
unless the ulse is permitted in the new zone,
The Planning Director may extend the expiration date up to one (1) year if you resubmit
new plans for check against the code requirements in effect at that time and include a
written request for the extension. We must receive this request before expiration of the project
approval. We will not require a fee for this extension request; however, changes to the plans
originally approved for purposes other than code requirements shall be subject to a new site
plan review, including payment of all required fees,
U'RIJIM M NIAMAZIMIMI ffl�lfl'
This site plan review has been found to be exempt from the provisions of the California
Environmental Quality Act (CEQA) according to Section 15332. This project is exempt
because it is an infill development that is consistent with the general plan and zoning
SPRO 12'-0259
Page, 3 of'12
regulations, is within an area predominantly developed with urban uses, is not identified as
critical habitat for endangered or threatened species, will not significantly affect traffic noise,
air or water quality, and will be adequately served by appropriate utilities and public services.
A Notice of Exemption has been prepared and is available for review at the Planning Division
(see cover sheet for address).
Any person may appeal this decision, An appeal is limited to whether or not an
adopted development standard, zoning regulation, mifigation, or policy applied or not
applied to the project, was done consistenit with the authority granted by city ordinances or
the California Environmental Quallity Act (CEQA), The appeal must • in writing stating the
precise basis or issue as noted, include a $700 filing fee, and must be filed within 101 days of the
decision date to the City of Bakersfield Planning Commission (c/o Bakersfield Planning!
Director, 1715 Chester Avenue, Bakersfield, CA, 93301). The Planning Commission will hold a
public hearing on the appeal and their decision willl be final unless their decision i's appealed
to the City Council.
Site plan approval is based on the statements made in the application and the plans
you submitted. Any errors or omissions on these plans could alter the compliance list and/or
void this decision. If you have questions about any of the items noted in the Site Plan
CornpIliance List, you must speak to the contact person representing the department requiring
that item. If you have other questions, regarding general information about the site plan
review process, please contact the Planning Division at (661) 326-3733.
Sincerely,
cc: AH Interesf ed Agencies - For your records.
rma
S:\BZA.SPR\Forrn$\sPr.-data\2012 sPr\11 2-0259,spr,itr.doc
SPR4 12-0259
Pap, 4 of 12
Prior to review of improvement plans by the City, the developer shall submit a
grading plan for the proposed site to be reviewed andl approved by the City
Engineer and Building Official (Bakersfield Municipal Code Section 16.44.0101).
With the grading plan, if the project is subject to the provisions of the National
Pollutant Discharge Elimination System (NPDES), a Notice of Intent (NOI) to
comply with the terms of the General Permit to Discharge Storm Water
Associated with Construction Activity (WQ Order No. 99-08-DWQ) must be filed
with the State Water Resources Control Board in Sacramento before the
beginning of any construction activity, Compliance with the general permit
requires that a Storm Water Pollution Prevention Plan (SWPPP) be prepared,
continuously carded out, and always be available for public inspection during !
normal construction hours,
2. A grading perm,it is required' prior to final plan approval, The developer shall
suN mit 4 copies of grading plans and 2 copies of the preliminary soils report to
the Building Division. A final soils report shall also be submitted to the Building
Division before they can issue a building permit, Please note that grading plans
must be consistent with the final building site plans and landscaping plans.
Building permits, will not be issued until the grading permit is approved by the
Building Division, Planning Division N Public Works Department.
A1111111111111,G1111 11110114AN121 =6
1151�. Show on the final' building plain pedestrian access from the pubilic way and
handicap parking. Private streets are not the public way.
5. The developer shall include fire resistive wall construction details with the final
building plans for all exterior walls of any building that is within the distance as set
forth in Table 602 of the California Building Code.
6. Include with or show on the final building plans information necessary to verify
that the project complies with all disability requirements of Title 24 of the
California Building, Code.
SPR9 12-0259
Pap, 5 of'12
7. An acoustical consultant, approved by the Building Division, shall be contacted
to prepare and include with the finial building plans measure that mitigate noise
exposures for all buildings on the project site that are subject to noise levels of 65
db or greater as delineated by the CNEL contour maps of the city. These
implementation measures shall comply with the requirements of Title 24 of the
California Building, Code.
& The developer shall'obtain all required approvals from the Kern County
Environmental Health Services Department (2700 "M" Street, Bakersfield, CA,
9330 1; PH 661-862-8700) for any public pool or related facility before building
permits can be issued. Disabled access to any public pool and related facility
shall comply with Title 24 of the California Building Code.
9. Buildings, or structures shall require installation of an automatic fire sprinkler system
where required by current California Building code and City ordinance.
10. Before the Building Division can allow occupancy of this apartment complex,
they must inspect andl approve the placement and colors of the address
numbers identifying each unit aind/or building, and on-site building /unit location
maps so that emergency personnel can easily find a specific unit when
responding to the site during an emergency,
11. The Building Division will calculate and collect the appropriate school district
impact fee at the time they issue a building permit.
12. Final' Building plans shall show pedestrian access pathways or easements for
persons with disabilities from public rights-of-ways that connect to all accessible
buildings, facilities, elements, and spaces in accordance with the California
Building Code. These pedestrian, access ways shall not be parallel to vehicular
lanes unless, separated by curbs or railings.
13. Prior to granting occupancy, the Building Division will verify that a water meter
serving the development is in place. Therefore, it is recommended that the
developer contact the applicable water purveyor to inquire about their process
for obtaining water service for the development as soon as possible. To
determine who the water purveyor for the development is, you may contact the
City of Bakersfield Water Resources Department (1000 Buena Vista Road,
Bakersfield, CA, phone: 661-326-3715).
J,JJJJJJrAKO=T`,,
The minimum parking required' far this project has been computed based on use
and shall be as follows:
Number of Parking Required
DA Vn#s Ratio Parkin
Multi Family - I BR 44 1 space /unit 44 spaces
Multi Family - 2+BR 88 2 spaces /unit 176 spaces
Guest Parking +10% 22spaces
Total Required: 242 spaces
SPR# 12-0259 Page 6 q
f 1' 2
(Note: 245 parking spaces are shown an the proposed site plan, By ordinance,
compact and tandem spaces cannot be counted toward meeting minimum
parking requirements.)
2. Minimum parking stall dlmensions shall be 9-feet wide by 18-feet long. Vehicles,
may hang over landscape areas no more than 2-11/2 feet provided required
setbacks along street frontages are maintained, and trees and shrubs are
protected from vehicles.
3. All parking lots, driveways, drive aisles, loading areas, and another vehicular
access ways, shall be paved with concrete, asphaltic concrete (A. C.), or other
paved street surfacing material in accordance with the Bakersfield Municipal
Code (Sections 15. 6,020 and 17.58.060 A,).
4. Lighting is required' for aA parking lots, except residential lots with four units or less
(Section 1i 758,060 A.). illumination shaill be evenly distributed across the parking
area wifh light fixtures designed and arranged so that light is directed downward
and is reflected away from adjacent properties and streets. Use of glare shield's
or baffles may be required for glare reduction or control of back light. No light
poles, standards and fixtures, including bases or pedestals, shall exceed a height
of 40 feet above grade. However, ligiht standards placed less than 50 feet frorr
residentially zoned or designated property, or from exisfing residential
development, shall not exceed a height of 15 feet. The final building plans shaE
include a picture or diagram of the light fixtures being used and show how light
will be directed onto the parking area, Please note that staff can require
additional adjustments to installed lighting after occupancy to resolve glare or
other lighting problems if they negatively affect adjacent properfies.
5. The developer shall include a copy • a final landscape plan with each set of
the final building plans submitted to the Building Division. Building permits will not
be issued until the Planning Division has approved the final landscape plan for
consistency with approved site plans and minimum ordinance standards (please
refer
• the landscaping requirements in Chapter 17.61)1,
6. Overlooks from windows, balconies, and decks of the 2nd or higiher floor into rear
yards of property containing single family homes must be screened (see Section
17.08.090). This condition affects any office, commercial, and industrial building,
and any apartment or condominium structure containing three or more units
that are within 150 feet of properties zoned 12- 1,12 -S -1 A, MH', oir PUD, or from
condominium projects of a single family character. Screening proposals must be
approved by the Planning Division before building permits will be issued.
Suggested methods for accomplishing screening are included in the attached
ordinance section.
SPRfi 12-0259
Page 7 of 12
7. A solid masonry wall shall be constructed adjacent to residenfiaily zoned and/or
designated property as indicated by staff on the returned site plan. This wall
must be shown on the final building plans and shall be constructed a minimum
height of 6 feet as measured from the highest adjacent finished property grade.
If the parking lot, including drive aisles, delivery areas, loading and unloading
areas are within ll 0 feet of residentially zoned property, a 7-foot wide landscape
strip that includes landscaping consistent with Chapter 17.61 shall be installed
between the wall and parking/drive areas (as noted on the returned plan) .
il. Business identification signs are neither considered nor aiggroved under this
review, A separate sign permit reviewed by the Planning and Building Divisions
and issued by the Building Division, is required for all new signs, including future
use and construction signs, Signs must comply with the Sign Ord�nance (Chapter
17.60 of the Bakersfield Municipal Code.)
9. Habitat Conservation fees shall be required for this project and will be calculated
based on the fee in effect at the time we issue an urban development permit
(includes, grading plan approvals) as defined in the
lmplemien:tation/Managiement Agreement (Section 2,21) for the Metropolitan
Bakersfield Habitat Conservation Plan, Upon payment of the fee, the applicant
will receive acknowledgment of compliance with Metropolitan Bakersfield
Habitat Conservation, Plan (Implementation/Management Agreement Section
3.1.4). This fee is currently $2,145 per gross acres, payable to the City of
Bakersfield (submit to the Planning Division), This fee must be paid before any
grading or other site disturbance occurs.
Forms and instructions are available at the Planning Division or on the city's web
site at www,bakersfieldgj� (go to Development Services Department).
The current Metropolitan Bakersfield Habitat Conservation Plan (MBHC�P) expires
in year 2014. Projects may be issued an urban development perm!it, grading
plan approval, or building permit and pay fees prior to the 2014 expiration date
under the current MBHCP. As determined by the City of Bakersfield, only projects
ready to be issued an urban deveiop,ment permit, grading pIan approval or
building permit before the 2014 expiration date will be eligible to pay fees under
the current MBHCP. Early payment or pre-payment of MBHCP fees shall not be
allowed. The ability of the City to issue urban development permits is governed
by the terms of the MBHCP. Urban development permits issued after the 2014
expiration date may be subject to a new • revised Habitat Conservation Man, if
approved, or be required to comply directly with requests of the U.S. Fish and
Wildlife Agency and the California Fish and Game Department.
10, Prior to ground disturbance, the developer shall have a qualified consultant
survey the location for burrowing �owls, and comply with the provisions of the
Migratory Bird Treaty Act (MB,TA) • 1918 (16 U.S.C. 703-711)1. Survey protocol shall
be that recommended by the State Department of: Fish and Game. Developers
shallbe subject to the mitigation measure recommended by the consultant. A
copy of the survey shall be provided to the Planning Department prior to ground
disturbance.
SPR4 12-0259
Page 8 of 12
The burrowing owl is a migratory bird species protected by 'international treaty
under the Migratory Bird Treat Act (MBTA) of 1918 (16 US.C. 703-711). The MBTA
makes it unlawful to take, possess, buy, sell, purchase, or barter any migiratory
bird'listed in 50 C.F.R. Part 10 including feathers or other parts, nests, eggs, or
products, except as allowed by implementing regulations (50 C.F.R. 21) . Sections
3503, 3503.5, and 3800 of the Calif )rnia Deocirtment of Fish and Game Code
f b,irdstheir nests, • gggs. To
avoid violation • the provisions, of these laws generally requires that project
related disturbance at active nesting territories • reduced or eliminated during
critical phases of the nesting cycle (March I - August 15, annually). Disturbance
that causes nest abandonment and/or loss ♦ reproductive effort (e.g., killing or
abandonment of eggs or young) may be considered' "taking"" and is potentially
punishaUe by fines and/or imprisonment.
11. Prior to ground disturbance, the developer shall have a qualified consultant
survey the location for 0 fox, and comply with the provisions of the Metropolitan
Bakersfield Habitat Conservation Plan, Survey protocol shall be recommended
by the State Department of Fish and Game. Developer shall be subject to the
mitigation measures recommended by the consultant. A copy of the survey
shall be provided to the Planning Department prior to ground disturbance.
The current Metropolitan Bakersfield Habitat Conservation Plan (MBHCP) expires
in year 2014. Projects, may be issued • as development permit, grading
plan approval, or building permit and pay fees prior to the 2014 expiration date
under the current MBH�CP. As determined b • Bakersfield, only projects
ready to be issued an urban development permit, grading plan approval •
building permit, before the 2014 expiration date, will be eligible to pay fees
under the current MBHCP, Urban development permits issued after the 2014
expiration date may be subject to a new or revised Habitat Conservation Plan, if
approved, or be requ,ired to comply directly with requests • the U.S,. Fish and
Wildlife Agency and the California Fish and Game Department.
12. A Park Development and Improvement Fee shall be paid at the time of the
building permit being issued. We will base the fee of the rate in effect at the
time the permit is issued. The current fee is $1,716 for each independent
residential! unit.
13. Refuse collection bin enclosures and container areas are subject • oll required
sfructurall setback from street frontages, and shall not reduce any parking,
loading or landscaping area • required by the Zoning ordinance.
i
14 In the event a p�reviously undocumented OP/gas well is uncovered or discovered
on the project, the developer is responsible to contact the Department of
Conservation's Division of Oil, Gas, and Geothermal Resources (DOGGR). The
developer is responsible for any remedial operations on the well required by
DOGGR. The developer shall also be subject to provisions of BMC Section
15,6 6.080 (B).
15. The developer shall meet all regulations of the Son Joaquin Valley Air Pollution
Control District (Regulation VIII) concerning dust suppression during construction
of the project. Methods include, but are not limited to use of water or chemical
SIT# 12-0259 Page 9 o
J` 12
stabilizer/suppressants to control dust emission from disturbed area, stock piles,
and access ways; covering or wetting materials that are transported off-site; limit
construction-related speed to 15 mph on all unpaved areas/waishing of
construction vehicles before they enter public streets to minimize carryout/track
out; and cease grading and earth moving during periods of high, winds (20 mph
or more).
1' 6. Prior to receiving final building or site occupancy, you must contact the Planning
Division (staiff contact noted above) for final inspection and approval of the
landscaping, parking lot, lighting and other related site improvements,
Inspections will not be conducted until all required items have been installed,.
Any deviations from the approved plans without prior approval from the
Planning Division may result in reconstruction and delays in obtaining a building
or site occupancy.
a. All fire lanes as identified on the returned plans. Any modifications shall be
approved by the Fire Department. Fire lane identification signs shall be
installed every 100 feet with red curbing when curbing is required. All work
shall be compieted before occupancy of any building or portion of any
building is allowed,
b All fire hydrants, both offsite (nearest to site and oni-sife. Include flow
data on all hydrants. Hydrants shall be in good working condition and are
subject to testing for verification. Fire flow requirements must be met prior
to construction, commencing on the project site. Please provide 2 sets of
the engineered water plans to Dave Weirather. (Note: All new fire
hydrants must be purchased from the Water Resources Department.)
C. All fire sprinkler and/or stand pipe systems, fire alarms and commercial
hood systems. These suppression systems require review and permits by
the Fire Department. The Fire Department will issue guidelines for these
various items as they may apply to this project.
d. Pro"ect address, including suite number if appiicabIe, If the project is
within a shopping or business center, note the name and address of the
center.
anium MO-1190JO
2. The developer must request an inspection from the Water Resources Department
(10100 Buena Vista Road, Bakersfield, CA, Phone: 661-326-3715) for any
underground sprinkler feeds at least 24 hours before they are buried. The
Prevention Services Division (1501 Truxtun Avenue, Bakersfield CA, Ph. 661/26 -
979j must complete all on-site inspections of fire sprinkler systems and fire alarm
systems before any building is occupied.
SPR4 12-0259
Page 10 of'12
3. The developer shall show on f he f inal building plans a minimum 20-foot wide all-
weather emergency access with an overhead clearance of 13, feet 6 inches
within 150 feet of all build'ings on the project site. The Fire Department must
approve the final location an•a • of the access prior to building perm!its
being issued. This access shall • constructed before building occupancy will be
granted.
4. All access (permanent and temporary) to and around any building under
construction must be at least 20 feet wide, contain no vehicle obstruction, and
be graded to prevent standing wafer. Barricades must be in place where
ditches and barriers exist in or cross roadways. Emergency vehicle access must
always be reliable.
1. The developer shall install one streetlight along Coffee Road as shown by staff on
the returned site plan. The developer shall be responsible for providing the labor
and materials necessary to energize all newly installed streetlights before
occupancy of the building or site. These improvements shall be shown on the
final building plans submitted to the Building Division before any building permits
will be issued.
2. The developer shall install new connection(s) to the public sewer system. This
connection shall be shown on the final building plans submitted to the Building
Division before any building permits will be issued.
3. All on -site areas required to be paved (ie. parking lots, access drives, loading
areas, etc.) shall consist of concrete, asphaltic concrete (Type B. A. C.) or other
paved street material approved by the City Engineer, Pavement shall be a
minimum thickness of 2 inches over 3 inches of approved base material (ie, Class
11 A. B,) if concrete is used, it shall be a minimum thickness of 4 inches per
Municipal Code Section 1'7. .060, paragraph A. This paving standard shall be
noted on the final building plans submitted to the Building Division before any
building permits will be issued.
4, If a grading plan is required by the Building Division, building permits will not b—
issued until the grading plan is approved • b�qt the Public Works Depiartme
and the Building Division. I
5. Before any building or site can be occupied, the developer must reconstruct or
repair substandard off -site street improvements that front the site to adopted city
standards as directed by the City Engineer, Please call the Construction
Superintendent at 661-326-3049 to schedule a site inspection to find out what
improvements may be required.
6. A street permit from the Public Works Department shall be obtained before any
work can be done within the public right-of-way (streets, alleys, easements).
Please include a copy of this site plan review decision to the department at the
time you apply for this permit.
SPR� 12-0259 Page I I ql'l 2
7. A sewer connection fee shall be paid at the time a building permit is issued. We
will base this fee at the rate in effect at the time a building permit is issued.
8. A transportation impact fee for regional facilities shall be paid at the time a
building permit is issued, or if no building permit is required, before occupancy of
the building or site. This fee will be based at the rate in effect at the time the
building permit is issued. The Public Works Department will calculate an estimate
of the total fee when you submit construction plans for the project.
9 The developer shall pay their proportionate share (I /2-width) of the total cost for
the landscaped median islIand in Coffee Road along the development's
frontage in the amount of $1010 per linear foot.
10. The developer shall form a new maintenance district.
11. All storm water generated on the project site, including the street frontage shall
be retained onsife unless otherwise allowed by the Public Works Department
(please contact the Public Works Department - Subdivisions at 661-326-3576),
12. This project may be located within a, Planned Sewer Area. Please contact the
Public Works Department - Subdivisions at 661-326-3576 to determine what fees
may apply.
13, This project may be located within a Manned Drainage Area. Please contact
the Public Works Department - Subdivisions at 661-326-3576 to determine what
fees may apply.
fir 1-1-1111TIMIE11
A
Street return type approaches, if used, shall have 20-foot minimum radius returns
with a 46-foot throat width. All dimensions shall be shown on the final building
plans.
2. Two-way drive aisles shall be a minimum width of 24 feet, If perpendicular (900)
parking spaces are proposed where a vehicle must back into these aisles, the
minimum aisle width shall be 25 feet. All drive aisle dimension shall be shown on
the final building plans.
3. Show the typical parking stall dimension on the final building plans (minimum stall
size is 9 feet x 18 feet),.
I I'��!!� 1� :� 111 ill 7 111111111111 1111111111111111
M—'
is CU V
SM 12-0259 Page 12 of 12
Division conditions). Levels, of service are based on how often collection occurs
as foIlows'.
• Cart service I cubic yard/week or less I time per week
• Front loader bin services 1;, cubic yard/week - 12 cubic yards/day
• Roll-off compactor service More than 12 cubic yards/day
2 Show on the final building plans refuse bin enclosures. Each enclosure shall be
designed according to adopted city standard (Detail #ST25 A and B), at the size
checked below 0. Before occupancy of the building or s,ite is allowed, twelve 3
cubic yard front loading type refuse bins shall be placed within the required
enclosures.
ME=
M
NOTE: All measurements above aire cuirb-to-curb dimensions Inside the
enclosiure. If both refuse and recycling containers are to be combined 'in the
same enclosure area, this area must be expanded in size to accommodate
multiple co,ntainers/bins (contact the staff person above for the appropriate
enclosure size).
3. Facilities that require infectious waste services shall obtain approval for separate
infectious waste storage areas from the Kern County Health Department. In no
instances shall the refuse bin area be used for infectious ious waste containment
purposes.
4. FacHities that require grease containment must provide a storage location that is
separate from the refuse bin location. This shall be shown on the final building
plans,
5. Facilities that participate in recycling operations must provide a location that is
separate from the refuse containment area.
I
� \« §(\
CN
r-
In
uj ./
PO
co
PO
U')
LLJ
U)
I
I
m
.06
//§\
I
GVOH 33jj00
MAN
oll
a.
4
SO
41
I