Loading...
HomeMy WebLinkAbout7800 Silver Dollar WayBuflding Division Phone: (661) 326-3720 FAK (661) 325-0266 MMOMMKIM Steven M. Fowler 7114 St. Andrews Drive Bakersfield CA 93309 RE: Notice of Decision - Site Plan Review (Project No, 12-0311) Dear Mr, Fowler: Jura Egigert, Planning Director Planning Division Phone: (661), 326-3733 Fad: (661) 852-2135 The Planning Director, upon recommendation of the Site Plan Review Committee, has approved your plans for to construct a 7,000 squiare-foot trailer sales/shop building in a C-2 (Regional Commercial) zone district at 7800 Silver Dollar Way. Your proposal, with corrections as noted, meets the minimum required codes, policies and standards for development as aclopted by the Bakersfield City Council, Specific items, have been identified (see attached Site Plan Compliance List) that you need to resolve before you can obtain a building permit or be allowed occupancy. These items may include changes or additions that need to be shown on the final building plans, alert you to speciflc fees, and/or are comments that will help you in complying with the city's development standards. Each item will note when it is to be completed and they have been grouped by department so that you know who to contact if you have questions. Your next step is to either apply for necessary building permits to construct your project, or begin your business activities depending on the request submitted, You must submit final buJiding plans to the Building Division, The Site Plan Review Committee will review these final plans while building plan check occurs to ensure that you satisfy the items in the Site Plan Compliance List. Please read them carefully. Failure to satisfy an item may delay your obtaining a building permit or commencing youir project, After construction of your project but before the City can allow occupancy, the Building Division must inspect the development to find if it complies with the approved plans, and any other relevant permits and codes. If you have satisfied all of the requirements, the Building Director will issue a certificate of occupancy: of not, the area inspector will give you a correction notice. Once you have made all of the corrections, the Building Director can issue a certificate of occupancy. You may not occupy a development until the Building Director has issued a certificate of occupancy. City of Bakersfield q, 1715 Chester Avenue o Bakersfield, California , 933 1 Page 2 ITION In consideration by the City of Bakersfield for land use entitlements, including but not limited to related environmental approvals related to or arising, from this project, the applicant, and/or property owner and/or subdivider ('Applicant" herein) agrees to indemnify, defend, and hold harmless the City of Bakersfield, its officers, agents, employees, departments, commissioners or boards ("City " herein) against any and all liability, claims, actions, causes of actions or demands whatsoever against them, or any of them, before administrative or judicial tribunals of any kind whatsoever, in any way arising from, the terms and provisions of this application, including without limitation any CEQA approval or any related development approvals or conditions whether imposed by the City, or not, except for City's sole active negligence or willful misconduct, This indemnification condition does not prevent the Applicant from challenging any decision by the City related to this project and the obligations of this condition apply regardless of whether any other permits or entitlements are issued. The City will promptly notify Applicant of any such claim, action, or proceeding, failing under this condition within thirty (30), days of actually receiving such claim , The City, in its sole discretion, shall be allowed to choose the attorney or outside law firm to defend the City at the sole cost and expense of the Applicant and the City is not obligated to use any law firm or attorney chosen by another entity or party, Any time after site plan approval but before the approval expires you may submit revisions to the plan. We will, treat these revisions as a new site plan application subject to a new review and required fees, The Planning Director can only approve minor changes to the original plan without a new application if they are necessary to meet a condition, mitigation, or result from physical obstacles or other comparable constraints, I ;� 13 1 M Approval of this site plan expires on August 28, 2014 (2 years from the decision date), unless building permits have been issued, or on projects not requiring a building permit, the use has commenced. The project must be completed within 5 years from the decision date. If the property is rezoned, site plan approval will expire upon the effective date for the rezoning unless the use is permitted in the new zone. The Planning Director may extend the expiration date up to one (1) year if you resubmit new plans for check against the code requirements in effect at that time and include a written request for the extension. We must receive this request !?_Gfore expiration of the project approval, We will not require a fee for this extension request; however, changes to the plans originally approved for purposes other than code requirements shall be subject to a new site plain review, including payment of all required fees. City of' Bakersfield o 1715 Chester Avenue c Bakersfield, California * 93301 Page 3 I � I This site plan review has been found to be exempt from the provisions of the California Environmental Quality Act (CEQA) according to Section 15332. This project is exempt because it is an infill development that is consistent with the general plan and zoning regulations, is within an area predominantly developed with urban uses, is not identified as critical habitat for endangered or threatened species, willl not significantly affect traffic noise, air or water quality, and will be adequately served by appropriate utilities and public services. A Notice of Exemption has been prepared and is available for review at the Planning Division (see cover sheet for address). Any person may appea decision, An appeal is limited to whether or not • adopted development standard, zoning regulation, mitigation, or policy applied or not applied to the project, was done consistent with thea a granted by city ordbances, or the California Environmental Quality Act (CEGiA), The appeal must be in writing stating the precise basis or issue as noted, include a $700filing fee, and must be filed within 10da of the decision date to the City of Bakersfield Planning Commission (c/o Bakersfield Planning Director, 1715 Chester Avenue, Bakersfield, CA, 93301), The Planning Commission will hold a public hearing on the appeal and their decision will be final unless their decision is appealed to the City Council, Site plan approval is based on the statements made, in the application and the plans you submitted, Any errors or omissions on these plans could alter the compliance list and/or void this decision. If you have questions about any of the items noted in the Site Plan Compliance List, you must speak to the contact person representing the department requiring that item. If you have other questions regarding general information about the site plan review process, please contact the Planning Division at (661) 326-3733. ly, cc: Ali Interested Agencies - For your records, rrna SABZA SPR\Forrns\spr,_data\20I2 spr\ 12-031 1,spr,1ir.doc arming Director City of Bakersfield o 1715 Chester Avenue o Bakersfield, California a 93301 M Pay - -o;, 4 A. DEVELOPMENT SERVICES - BUILDING (Staff contact - Steve Ewing 661-326-3677) Prior to review of improvement plans by the City, the developer shall submit a grading plan for the proposed site to be reviewed and approved by the City Engineer and Building Official (Bakersfield Municipal Code Section 16.44.010)> With the grading plan, if the project is subject to the provisions, of the National Pollutant Discharge Elimination System (NPDES), a Notice of Intent (N01) to comply with the terms of the General Permit to Discharge Storm Water Associated with Construction Activity (WQ Order No. 99-08-DWQ) must be filed with the State Water Resources Control Board in Sacramento before the beginning of any construction activity, Compliance with the general permit requires that a Storm Water Poilution Prevention Plan (SWP,PP) be prepared, continuously carried out, and always be available for public inspection during normal construction hours. 2. A grading permit is required prior to final plan approval. The developer shall submit 4 copies of grading plans and 2 copies of the preliminary soils report to the Building Division. A final soils report shall also be submitted to the Building Division before they can issue a building permit. Please note that grading plans must be consistent with the final building site plans and landscaping plans. Building permits will not be issued until the grading permit is approved by the Building Division, Planning Division (HCP), and Public Works Department, 3. An approved site utilities plan, is required prior to final plan approval. 4. Show on the final building, plan pedestrian access from the public way and handicap parking. Private streets are not the public way. 5. The developer shall include fire resistive wall construction details with the final building plains for all exterior walls of any building that is within the distance as set forth in Table 602 of the California Building Code. 6. Include with or show on the final building plans !information necessary to verify that the project complies with all disability requirements of Title 24 of the California Building Code, 7. Buildings or structures shall require installation of an automatic fire sprinkler system where required by current California Building Code and City ordinance, City of Bakersfield 1 715 Chester Avenue o Bakersfield, California 933,01 91 Page 5 The Building Division will calculate and collect the appropriate school district impact fee at the time they issue a building permit. 9, Final Building plains shall show pedestrian access pathways or easements for persons with disabilities from public rights-of-ways that connect to all accessible buildings, facilities, elements, and spaces in accordance with the California Building Code, These pedestrian access ways shall not be parallel to vehicular lanes unless separated by curbs or railings, 101,, Prior to granting occupancy, the Building Division will verify that a water meter serving the development is in place. Therefore, it is recommended that the developer contact the applicable water purveyor to inquire about their process for obtaining water service for the development as soon as possible, To deferrn ne who the water purveyor for the development is, you may contact the City of Bakersfield Water Resources Department (1000 Buena Vista Road, Bakersfield, CA, phone: 661-326-3715), - PLANNING (Staff contact - Arc and Cox 6611 -326-3673) 1 The minimum parking required for this project has been computed based on use and shall be as follows: Use Office Show Room Shop Warehouse Aa j�k la_ S afe f9game 477 sf, 587 0. 1,558 s.f. 3,115 0, 1,263 sf, Parking Require4, irkin Ratio a I space/300 s.f, 2spaces 1 space/4,000 s-f Ispace 1 space/500 sJ . 3 spaces I space/ 1, 000; SJ 3spaces NiA -0- To—tai Required: 9spaces C M�90 'I by orainance, 7117MV o-ur-F-M, 7WOM, minimum parking requirements,) Z Minimum parking stall dimensions shall be 9-feet wide by 18-feet long, Vehicles may hang over landscape areas no more than 2-1/2 feet provided required setbacks, along street frontages are maintained, and trees and shrubs are protected from vehicles, 3. All parking lots, driveways, drive aisles, loading areas, and other vehicular access ways, shall be paved with concrete, asphaltic concrete, (A. C,), or other paved street surfacing material in accordance with the Bakersfield Municipal Code (Sections 15,76,0120 and 17,58,0 60 A.), 4 Lighting is required for all parking lots, except residential lots with four units or less (Section 17058,060 A.), illumination shall be evenly distributed across the parking area with light fixtures designed and arranged so that light is directed downward and is reflected away from adjacent properties and streets, Use of glare shields or baffles may be required for glare reduction or control of back light. No light poles, Cit�y of Bakersfieldi a 1715 Chester Avenue o Bakersfield, California o 933 Pap 6 standards and fixtures, including bases or pedestals, shall exceed a height of 40 feet above grade. However, light standards placed less than 510 feet from residentially zoned or designated property, or from existing residential development, shall not exceed a height of 15 feei , The final building plans shall include a picture or diagram of the light fixtures being used and show how light will be directed onto the parking area. Please note that staff can require additional adjustments to installed lighting after occupancy to resolve glare or other lighting problems if they negatively affect adjacent properties. The developer shall include a copy of a final landscape plan with each set of the final building plans submitted to the Building Division, Building permits will not be issued until the Planning Division, has approved the final landscape plan for consistency with f he approved site plan, (NOTE: At the time a final site Inspection is conducted, It is expected that Plants V41il nt with the approved landscape plan.) 6, Business identification signs are neith ?r considered nor approved under this review. A separate sign permit reviewed by the Planning and Building Divisions and issued by the Bullding Division, is required for all new signs, including future use and construction signs, Signs must comply with the Sign Ordinance (Chapter 17,60 of the Bakersfield Municip de.) Habitat Conservation fees shall be required for this project and will be calculated based on the fee in effect at the time we issue an urban development permit (includes grading plan approvals) as defined in the Implementation /Management Agreement (Section 2,21) for the Metropolitan Bakersfield Habitat Conservation Plan, Upon payment of the fee,, the applicant will receive acknowledgment of compliance with Metropolitan Bakersfield Habitat Conservation Plan (implementation /Management Agreement Section 3.1A), This fee is currently $2,145 per gross acres, payable to the City of Bakersfield (submit to the Planning Division). This fee must be paid before any grading or other site disturbance occurs,. Forms, and instructions are available at the Planning Division or on the city's web site at www,bakersfieidcit is (go to Development Services Department). The current Metropolitan Bakersfield Habitat Conservation Plan (MBHCP) expires in year 2014, Projects may be issued an urban development permit, grading plan approval, or building permit and pay fees prior to the 2014 expiration date under the current MBHCP. As determined by the City of Bakersfield, only projects ready to be issued an urban development permit, grading plan approval or building permit before the 2014 expiration date will be eligible to pay fees under the current MBHCP, Early payment or pre-payment of MBHCP fees shall not be allowed. The ability of the City to issue urban development permits is governed by the terms of the MBHCP. Urban development permits issued after the 2014 expiration date may be subject to a new or revised Habitat Conservation Plan, if approved, or be required to comply directly with requests of the U.S. Fish and Wildlife Agency and the California Fish and Game Department. City of Bakersfield 1 715 Chester Avenue o Bakersfield, California 93501 Page 7 8, if cultural resources are discovered during project activities, all work shall halt In the area of the find, A qualified professional archeologist shall be calie3d in to evaluate the findings, and make the appropriate recommendations, The recommendations shall be done by the applicant/developer prior to commencing with the development, (Mitigation Measure from GPAIZC 04-1322) 9, If human remains are discovered or identified on the project site at any time or during site disturbance, work shall stop at the location of the find and the Kern County Coroner shalt be notified immediately (Section 7050.5 of the California Health and Safety Code and Section 5097.98 of the California Public Resources Code, which detail the appropriate actions necessary for addressing the find) and the local Native American, community shall be notified immediately, (Mitigation Measure from GPAIZC 04-1322) 10. Roo,ftop areas of commercial buildings (e,g., office, retail, restaurant, assembly, hotel, hospital, church, school), and industrial buildings adjacent to residentially zoned properties, shall be completely screened by parapets or other finished architectural, features constructed to a height of the highest equipment, unfinished structural element or unfinished architectural feature of the building. 11, Areas used for trailer display/storage shall be treated with a permanent dust binder or other permanent dust control measure consistent with the regulations of the Son Joaquin Valley Air Pollution Control District (if gravel is permitted, it would be acceptable for this area), 12, Refuse collection bin enclosures and container areas are subject to all required structuiral setbacks from street frontages and shalli not reduce any parking, loading or landscaping areas as required by the Zoning Ordinance. 13. In the event a previously undocumented oil/gas well is uncovered or discovered on the project, the developer is responsible to contact the Department of Conservation's Division of Oil, Gas, and Geothermal Resources (DOGGR), The developer is responsible for any remedial operations on the well required by DOGGR, The developer shall also be subject to provisions of BMC Section 15,66,080 (B). 14, The developer shall meet all regulations of the San Joaquin Valley Air Pollution Control District (Regulation Vill) concerning dust suppression during construction of the project, Methods include, but are not limited to; use of water or chemical stabilizer/suppressants to control dust emission from disturbed area, stock pies, and access ways; covering, or wetting materials that are transported off-site; limit construction- related speed to 15 mph on all unpaved areas/washing of construction vehicles before they enter public streets to minimize carryout /track out,, and cease grading and earth moving during periods of high winds (20 mph, or more), 115, Prior to receiving final buildings or site occupancy, you must contact the Planning Division (staff contact noted above) for final inspection and approval of the landscaping, parking lot, lighting and other related site improvements, Inspections will not be conducted until all required Items have been installed, City of Bakersfield o 1715 Chester Avenue Bakersfield, California 93301 Page 8 C. FIRE DEPARTMENT (Staff contact - Dave Weirather 661-326-37'06) i a I a i a All fire hyd nearest to site and _on -site. Include flow data on all subject to testing hydrants. Hydrants shall be in good working condition and: are for verification. Fire flow requirements must be met prior to construction commencing on the project site, Please provide 2 sets of the engineered water plans to Dave Weirather, (Note: All new fire hydrants must be purchased from the Water Resources Department.) 2, All access (permanent and temporary) to and around any building under construction, must be at least 20 feet wide, contain no vehicle obstruction,, and be graded to prevent standing water, Barricades must be in place where ditches and barriers exist in or cross roadways, Emergency vehicle access must always be reliable. 1. The developer shall construct curbs, gutters, cross gutters, 5-foot 6-inch wide sidewalks, and street/alley paving along Silver Dollar Way according to adopted city stondordls. These improvements shall be shown on the final building plans submitted to the Building Division before any building permits will be issued, 2, The developer shall install new connection(s) to the public sewer system. This connection shall be shown on the final building plans submitted to the Building Division before any building permits will be issued. 3, All on-site areas required to be paved (ie, parking lots, access drives, loading areas, etc,) shall consist of concrete, asphaltic concrete (Type B, A. C.) or other paved street material approved by the City Engineer, Pavement shall be a minimum thickness of 2 inches over 3 inches of approved base material (ie, Class Il A, B,) if concrete is used, It shall be a minimum thickness of 4 inches per Municipal Code Section 17,58,060, paragraph A, This paving standard shall be noted on the final building plans submitted to the Building Division before any building permits will be issued. 4. if a grading;, plan is required by the Building Division, building permits will not be issued until the grading plan is approved by!?� the Public Works Department and the Building Division. obtained before any 5. A street permit from the Public Works Department shall be work can be done within; the, public right-of-way (streets, all:eys, easements), Please include a copy of this site plan review decision to the department at the time you apply for this permit, 6. A sewer connection fee shall be paid at the time a building permit is issued, We will base this fee at the rate in effect at the time a building permit is issued. 7. A transportation impact fee for regional facilities shall be paid at the time a building permit is issued, or if no building permit is required, before occupancy of City of Bakersfield 1715 Chester Avenue Bakersfield, California 90001 11 [A Page 9 the building or site. This fee will be based at the rate in effect at the time the building permit is issued, The Public Works Department will calculate an estimate of the total fee when you submit construction plans for the project, 8. Ali storm water generated on the project site, including the street frontage shall be retained onsite unless, otherwise allowed by the Public Works Department (please contact the Public Works Department - Subdivisions at 661-326-3576). UIBLIC WORKS - TRAFFIC (Staff contact - George Gillburg 661-326-3997') 1 Show on the final building plans 40-foot and 42-foot wide (top-to-top) drive, approaches as indicated by staff on the returned site plan, Drive approaches must be centered on drive ciisles. All dimensions shall be shown on the final building plans, PUBLIC WORKS - SOLIp WASTE (Staff contact - John Wilburn 661-326-3114) Cart service I cubic yard /week or less 1 time per week Front loader bin services I cubic yard/week - 12 cubic yards/day Roll-off compactor service More than 12 cubic yards/day 2. show on the final building plans refuse bin enclosures. Each enclosure shall be designed according to adopted city standard (De tai I # ST25 A and B), at the size checked below 0. Before occupancy of the building or site is allowed, two 3 cubic yard front loading type refuse bin(s) shall be placed within the required enclosure(s), El 6' deep x 8' wide (I bin) F1 8' deep x 16' wide (3 bins) 9 8' deep x 10' wide (2 bins) El 8' deep x 2g'' wide (4 bins) 'AW �f —bothref -use and recycling containers are to be combined in the same enclosure area�, this area must be expanded in size to, accommodate multiple containers/bins (contact the staff person above for the appropriate enclosure size). S. Facilities that participate in recycling operations must provide, a, location that is separate from the refuse containment area, City of Bakersfield 171 5 Chester Avenue o Bakersfield, California 93301 wo PA NIP ■ 1wL� c t z� ,r p 1�3 pp lign�7 Dime � El 7 .. i a Z Z Z, z' . 1 .. M y q A nq N T Y� AV PP¢a I w acs fI k5A 120J5 mW V* TE- In '04 VU 0 TO M, w is I LON