HomeMy WebLinkAbout700 Planz RdCommunity Development Department Douglas Mdsoac, Community Development Director PhR (Burns, Building Diredor BuHdinq Divisbn Phone: (661) 326-3720 FAX. (661 ) 325-0266 oemans RE: Notice of Decision - Site Plan Review (Project No. 12-0358) Dear Mr. Castillo: Jim Eggert, Planning Director Manning DMsion Phone: (661) 326,3733 FAX: (661) 852-2136 The Planning Director, upon recommendation of the Site Plan Review Commiittee, has approved your p]ans to convert a former fire station to 3,300 square-foot multi-tenant retail building in a C-2 (Regional Commercial) zone district at 700 Planz Road. Your proposal, with corrections as noted, meets the minimum required codes, policies and standards for development as adopted by the Bakersfield City Council. Specific items have been identified (see attached Site Plan Compliance List) that you need to resolve before you can obtain a building permit or be allowed occupancy, These items may include changes or additions that need to be shown on the final building *-lans, alert Zou to s-pecific fees i- - the city's development standards. Each item will note when it is to be completedand they have been grouped' by department so that you know who to contact if you hove questions. Your next step is to either apply for necessary building permits to construct your project, or begin your business activities depending on the request submitted. You must submit final building plans to the Building Division. The Site Plan Review Committee will review these final plans while building plan check occurs to ensure that you satisfy the items in the Site Plan Compliance List. Please read them carefully. Failure to satisfy an item may delay your obtaining a building permit or commencing your project. After construction of your project but before the City can allow occupancy, the Building Division must inspect the development to find if it complies with the approved' plans, and any other relevant permits and codes. If you have satisfied all of the requirements, the Building Director will issue a certificate of occupancy; of not, the area inspector will give you a correction notice. Once you have made all of the corrections, the Building Director can issue a certificate of occupancy. You may not occupy a development until the Building Director has issued a certificate of occupancy. SPIV 12-0358 Z111, I ; k 'FU, i Page 2 )J'9 In consideration by the City of Bakersfield for land use entitlements, including but not limited to related environmentall approvals related to or arising from this project, the applicant, and/or property owner and/or subdivider ("Applicant" herein), agrees to indemnify, defend, and hold harmless the City of Bakersfield, its officers, agents, employees, departments, commissioners or boards (""City " herein) against any and all liability, claims, actions, causes of actions or demands whatsoever against them, or any of them, before administrative or judicial tribunals of any kind whatsoever, in any way arising from, the terms and provisions of this application, including without limitation any CPA approval or any related development approvals or conditions whether imposed by the City, or not, except for City's sole active negligence or willful misconduct. This indemnification condition does not prevent the Applicant from challenging any decision by the City relafed to this project and the obligations of this condition apply regardless of whether any other permits or entitlements are issued. The City will promptly notify Applicant of any such claim, action, or proceeding, failing under this condition within thirty (30) days of actually receiving such claim. The City, in its sole discretion, shall be allowed to choose the attorney or outside law firm to defend the City at the sole cost and expense of the Applicant and the City is not obligated' to use any law firm or attorney chosen by another entity or party. i Natuff.-U; gaoagaany; - Any time after site plan approval but before the approval expires, you may submit revisions to the plan. We will treat these revisions as a new site plan application subject to a new review and required fees. The Planning Director can only approve minor changes to the original plan without a new application if they are necessary to meet a condition, mitigation, or result from physical obstacles or other comparable constraints. Approval of this site plan expires on October 8, 2014 (2 years from the decision date),, unless building permits have been issued, or on projects not requiring a building permit, the use has commenced. The project must be completed within 5 years from the decision date. If the property is rezoned, site plan approval will expire upon the effective date for the rezoning unless the use is permitted in the new zone. The Planning Director may extend the expiration date up to one (7) year if you resubmit new plans for check against the code requirements in effect at that time and include a written request for the extension. We must receive this request before expiration, of the project approval. We will not require a fee for this extension request; however, changes to the plans originally approved for purposes other than code requirements shall be subject to a new site plan review, including payment of all required fees. SARA 12-0358 Page 3 qj9 This site plan review has been found to be exempt from the provisions of the California Environmental Quality Act (CEQA) according to Section 15332. This project is exempt because it is an infill development that is consistent with the general plan and zoning regulations, is within an area predominantly developed with urban uses, is not identified as critical habitat for endangered or threatened species, will not significantly affect traffic noise, air or water qualify, and will be adequately served by appropriate utilities and public services. A Notice of Exemption has been prepared and is available for review at the Planning Division (see cover sheet for address). Any person may appeal this decision. An appeal is limited to whether or not an adopted development standard, zoning regulation, mitigation, or policy applied or not applied to the project, was done consistent with the authority granted by city ordinances or the California: Environmental Quality Act (CEQA), The appeal must be in writing stating the precise basis or issue as noted, include a $700 filing fee, and must be filed within 10 days of the decision date to the City of Bakersfield Planning Commission (c/o Bakersfield Planning Director, 1715 Chester Avenue, Bakersfield, CA, 93301). The Planning Commission will hold a public hearing on the appeal and their decision will be final unless their decision is appealed to the City Council. Site plan approval is based on the statements made in the application and the plans you submitted, Any errors or omissions on these plans could alter the compliance list and/or void this decision. If you have questions about any of the items noted in the Site Plan Compliance List, you must speak to the contact person representing the department requiring that item. If you have other questions regarding general information about the site plan review process, please contact the Planning Division at (661) 326-3733. Sincerely, cc: Aili IN eresf ed Agencies - For your records, rma S-'\ BZA—S P R\ Form s\sprdof a\20112 spr\ 12-0358sprJfr,doc SPR4 12-0358 Page 4 of 9 . . .... .. 7 it Show on the final building plan how and where water will be drained from the property. 2. Show on the final building plan pedestrian access from the public way and handicap parking. Private streets are not the public way. 3. Include with or show on the final building plans information necessary to verify that the project complies with all disability requirements of Title 24 of the California Building Code. 4. The developer shall obtain, all required approvals from, the Kern County Environmental Health Services Department (2700 "M" Street, Bakersfield, CA., 9330 1; P'H 661-862-8700) for any food handling facility (ie: market, delicatessen, caf6, concession, restaurant) before building permits can be issued, 5. The Building Division will calculate and collect the appropriate schooil district impact fee at the time they issue a building permit. 6. Final Building plans shall' show pedestrian access pathways or easements, for persons with disabilities from public rights -of -ways that connect to all accessible buildings, facilities, elements, and spaces in accordance with the California Building Code, These pedestrian access ways shall not be parallel to vehicular lanes unless separated by curbs or railings. 7. Prior to granting occupancy, the Building Division will verify that a water meter serving the development is in place. Therefore, it is recommended that the developer contact the applicable water purveyor to inquire about their process for obtaining water service for the development as soon as possible. To determine who the water purveyor for the development is, you may contact the City of Bakersfield' ater Resources Department (1000 Buena Vista Rood, Bakersfield, CA, phone: 661-326-3715). SPRP 12-0358 Page 5 of 9 B. DEVELOPMENT SERVICES - PLANNING (Staff contact - Hayward Cox 6,61-3263673) The minimum parking required for this project is 11 spaces pursuant to Zoning Modification No. 12-0134. (No te, I I parking spaces are shown on the proposed site plan. By meeting minimum parking requirements.) 2. Minimum parking stall dimensions shall be 9-feet wide by 18-feet long. Vehicles may hang over landscape areas no more than 2-1/2 feet provided required setbacks along street frontages are maintained, and trees and shrubs are protected from vehicles. 3. All parking lots, driveways, drive aisles, loading areas, and other vehicular access ways, shall be paved with concrete, asphaltic concrete (A. C.), or other paved street surfacing material in accordance with the Bakersfield Municipal Code (Sections 15.76.020 and 17.58.060 A.). 4. Lighting is required for all parking lots, except residential lots with four units or less (Section 17.58.060 A.). Illumination shall be evenly distributed across the parking area with light fixtures designed and arranged so that light is directed downward and is reflected away from adjacent properties and streets. Use of glare shields or baffles may be required for glare reduction or control of back light. No light poles, standards and fixtures, including bases or pedestals, shall exceed' a height of 40 feet above grade. However, light standards placed less than 50 feet from residentially zoned or designated property, or from existing residential development, shall not exceed a height of 15 feet. The final building plans shall include a picture or diagram of the light fixtures being used and show how light will be directed onto the parking area. Please note that staff can require additional adjustments to installed lighting after occupancy to resolve glare or other lighting problems if they negatively affect adjacent properties. 5. The developer shall include a copy of a final landscape plan with each set of the final building plans submitted to the Building Division. Building permits will not be issued until the Planning Division has approved the final landscape plan for consistency with approved site plans and minimum ordinance standards (please refer to the landscaping requirements in Chapter 17,61). (NOTE: At the time a final site Inspection Is, conducted, it is expected that Plants will match the species Identified and be Installed In the locations consistent with the approved landscape plan. Changes made without prior " iffifiIVA114, fv va,.1A v 0-11' 6. Business identification signs are neither considered nor apgroved under this review. A separate sign permit reviewed by the Planning and; Building Divisions and issued by the Building Division, is required for all new signs, SPRP 12-0358 Page 6 qJ_9 including future use and construction signs. Signs must comply with the Sign Ordinance (Chapter 17.60 of the Bakersfield Municipal Code.) 7. Rooftop areas of commercial buildings (e.g., office, retail, restaurant, assembly, hotel, hospital, church, school), and industrial buildings adjacent to residentially zoned properties, shall be completely screened by parapets or other finished architectural features constructed to a height of the highest equipment, unfinished structural element or unfinished architectural feature of the building. Refuse collection bin enclosures and container areas are subject to all required structural setback from street frontages, and shall not reduce any parking, loading or landscaping aireas as required by the Zoning Ordinance, 9. The developer shall meet all regulations of the Son Joaquin Valley Air Pollution Control District (Regulation Vill) concerning dust suppression during construction of the project. Methods, include, but are not limited to; use of water or chemical stabilizer/suppressants to control dust emission from disturbed area, stock piles, and access ways, covering or wetting materials that are transported off-site: limit construction-related speed to 15 mph on all unpaved areas/washing of construction vehicles before they enter public streets to minimize carryout/track cut; and cease grading and earth moving during, periods of high winds (20 mph or more). 10. Prior to receiving final building or site occupancy, you must contact the Planning Division (staff contact noted above) for final inspection and approval) of the landscaping, parking lot, lighting and other related site improvements. lnspections will not be conducted until all required items have been installed, Any deviations from the approved plans without prior approval from the Planning Division may result in reconstruction and delays in obtaining a building or site occupancy. ��111 Pill 11 1 I'll III III! illillilli Pill "I IKM I � F M�U*4421117"'T "'T - - - - - - F '; 0. All fire h /drants both offsite nearest to site and on-site. Include flow data on all hydrants. Hydrants shalll be in good working, condition and are subject to testing for verification. Fire flow requirements must be met prior to construction commencing on the project site. Please provide 2 sets of the engineered water plans to Dave Weirather. (Note: All new fire hydrants must be purchased from the Water Resources Department.) 2. All access (permanent and temporary) to and around any building und construction must be at least 20 feet wide, contain no vehicle obstructio and be graded to prevent standing water. Bar(icades must be in place where ditches and barriers exist in or cross roadways. Emergency vehicl access must always be reliable. I SPR4 12-0358 Page 7 of 9 D. PUBLIC WORKS - ENGINEERING (Staff contact - George G111burg 661-326-3997) if the project generates industrial waste, it shall be subject to the requirements of the Industrial Waste Ordinance, An industrial waste permit must be obtained from the Public Works Department before issuance of the building permit. To find out what type of waste is considered industrial, please contact the Wastewater Treatment Superintendent at 661-326-3249, 2. Before any building or site can be occupied, the developer must reconstruct or repair substandard off -site street improvements that front the site to adopted city standards as directed by the City Engineer. Please call the Construction Superintendent at 661-326-3049 to schedule a site inspection to find out what improvements may be required. 3. A street permit from the Public Works Department shall be obtained before any work can be done within the public right-of-way (streets, alleys, easements),. Please include a copy of this site plan review decision to the department at the time you apply for this permit. 4. A sewer connection fee shall be paid at the time a building permit is issued. We will base this fee at the rate in effect at the time a building permit is issued. 5. A transportation impact fee for regional facilities shall be paid at the time a building permit is issued, or if no building permit is required, before occupancy of the building or site. This fee will be based at the rate in effect at the time the building permit is issued. The Public Works Department will calculate an estimate of the total fee when you submit construction plains for the project, 6. The developer shall form a new mainteniance district. Undeveloped parcels with an existing Maintenance District are required to update Maintenance District documents'. Updated documents, including Proposition 218 Ballot and Covenant, shall be signed and notarized. 7. The developer shall dedicate additional road' rigi, ht-of-way to the City of Bakersfield c a S. Chester Avenue to fuil arterial street width (55-foot half- width) according to adopted city standards. The developer shall dedicate additional road right-of-way to the City of Bakersfield along Plant Road to full collector width (45-foot half width) with a 20-foot chamfer of the right-of-way lines at the corner. This will establish a proper right -of -way in an area previously owned by the City where no right- of-way was defined. Right-of-way for an expanded intersection is not required. 8. Ail storm water generated on the project site, including the street frontage shall be retained onsite unless otherwise allowed by the Public Works, Department (please contact the Public Works Department - Subdivisions at 661-326-3576). MW 12-0558 FA [A Page 8 o f9 9. This project may be located within a Planned Sewer Area. Please contact the Public Works Department - Subdivisions at 661-326-3576 to determine what fees may apply. I O. Thiis project may be located within a Planned Drainalge Area. Please contact the Pubfic Works Department - Subdivisions at 661-326-3576 to determine what fees may apply. 11 111111�pi Two-way drive aisles shall be a minimum width of: 24 feet. If perpendicular (900) parking spaces are proposed where a vehicle must back into these aisles, the minimum aisle width shaill be 25 feet. All drive aisle dimension shall be shown on the final building plains. Cart service I cubic yard/week or less I f irne per week Front loader bin services I cubic yard/week - 12 cubic yards/day Roll-off compactor service More than 12 cubic yards/day 2. Show on the final building plans refuse bin enclosures. Each enclosure shall be designed according to adopted city standard (Detail #ST25 A and B), at the size checked below 0. Before occupancy of the building or site is allowed, two 3 cubic yard front loading type refuse bin(s) shall be placed within the required enclosure(s). 0 6'deep x 8'wide (1 bin) 0 8'deep x 1'5'wide (3 bins) ED 8'deep x I O'wide (2 bins) 0 8i'deep x 20'wide (4 bins) OMTE: ALI measurements allbove are curb-to-curb diimensions inside the emlosure. If both refuse and recycling containers are to be combined in the some enclosure area, f his area must be expanded in size to accommodate multiple containers/bins (contact the staff person above for the appropriate enclosure size). 3. Facilities that require infectious waste services shall obtain approval for separate infectious waste storage areas from the Kern County Health Department. In no instances shall the refuse bin area be used for infectious waste containment purposes. SM 12-0358 I'age 9 (Y..9 4. Facilities that require grease containment must provide a storage location that is separate from the refuse bin location. This shall be shown on the final building plans. 5. Facilities that participate in recycling operations must provide a location that is separate from the refuse containment area. 6. Facilities with existing refuse service must improve the service location area(s) to current adopted city standards (in accordance with Detail #ST25 A and B). These improvements shall be clearly shown on the final building plans. ,;��. ,,�, !: S 1N d ��% b f.* ,,,ii _� _._. �� AwJ R.kIWY�IR GR�I��,'.. �.�. �� `�H, ILP I R 1'% CO ► Lc) 14) c p Ei N 0 Q u (n N I 4 N. N co N+ R 0 N 0 E 0 z w a qt LLJ V) @ cv ILP 4< tj r ( Ival cs ap„ i CO r 4< tj r ( Ival cs ap„ i r Q cr �� 0 as 0 E 0 z �"'''i