HomeMy WebLinkAboutSITE PLAN 7/31/2009EXECUTIVE ORDER VR-205—A
VST PHASE II EVR SYSTEM
WITH HIRT THERMAL OXIDIZER
NOT INCLUDING
IN—STATION DIAGNOSTICS (ISD)
Figure IA-4 (continued)
Typical Hirt VC81 00 Thermal Oxidizer Processor
Ground Mount
P/V VALVE
20 Ft. minimum -
VCS 100 VAPOR PIPE:
v,i�nrxssok,
minimum 1/8, slope
toward vent pipes 12 f
Minimum
VENT
ell,. PIPES
GRADE
\1/4 "CHECK VALVE
(Hirt Pc).Y-'tg P65)
Canogy Mount
-20 f t. minimum 110( P/V VALVE
Vcs 190-1--l-
43RnassnR
VAPOR PIPE
CAN[IPY minimum 1/8" slope Minimum
toward vent pipes \VENT
1-D, I P E S
GRADE
pip* & Unlow damp
Unkud Channel
goof Unk#ul pod bus screwed to the #xkdni
roof at anehor9d to concrete
slab •v*#V 10'
Pipe Support Detail]
Executive Order VR-205-A FIGURE I
VST Phase 11 EVR System with Hirt Thermal Oxidizer
Exhibit I Weather Cover
Equipment List
Component ManufadWred Model Outer Fire Endoiure
Stack
Nozzle VST Model VST-EVR-NB
(Figure IA-1)
VST Model VST-EVR-NB-R (Rebuilt) Air Gop
Coaxial Curb Hose VST Model VDV-EVR Series
(Figure IA-2)
Coaxial Whip Hose VST Model VSTAEVR Series '--Base
(Figure IA-2)
tip
Breakaway Coupling VST Model VSTA-EVR-SBK VO *V Feet
(Figure IA-2) pippe
Connection
Hanging Hardware with Liquid Removal (Figure IA-3) .... .. ....
Device
Hirt Thermal Oxidizer Hirt Model VCS 100
With Indicator Panel (Figure IA-4) FIQU�RE 9
Log Attachments: I Fire Endo
50 — M39
4W M40
Hirt 114!' Check Valve' Hirt P65
-FIGURE 11
PIL
NEI
VA
BURNER
sgg
POWER
VAC P%ffltt: FHERCCACY
SHORT
! SHUTDOWN No
CIRCUIT DY OTHERS
0
—0PO%,?KR
C
L41) LAMP C
lure
ffvm R
OvERPREsSuRc
R4 Yn TIMER LCD LAMP
VACUUM PILOI
SWITCH THERMAL Smetmm
Rs
CH
4SENSM CH cstiviarr v*Avr.)
4
01
Lm
TURBINE
01�
LL
�.VrALVFII
�c
SAfEGARD) 4(1SM'T%Jr
0
Z
tJ
PROCESSING
LCD LAW
CABLE SPARK pRpyC /ROD
DRY CONTACTS FOR ISD PANEL, (FROM 4
VCS 100 ELECTRICAL VSE 201_5
SCHEMATIC
OSWELL LIQUOR Mkt.
100 S. Oswell St.
Bakersfield, CA 93307
FIGURE 9: FIELD WIRING
120 -VAC Power
(BY OTHERS)
POVER PROCESSING
art 9W OvtcsxtNK VCS too
0 PR=S=
INDICATOR
PAWL
nit",
ELECTRICAL
PANL
TERMINAL
STRIP
THERMAL SWITCH
(DEPRESS RED P BUTTON TO RESET>
r-77�; '
A
117
77
'4.
K�
A
7
AK
OSVWLL
SITE PLAN
Scope:
1. Install HIRT EVR Phase 11 at roof top
2. HIRT legs to be Installed per executive order
and secured with 4" x 3/8" wood screws
3. Brace HIRT piping every IV
4. Manifold vent lines per executive order
S. Perform Vapor Recovery Testing
6. No changes will be made to tank monitor
iris
0�OFESS/o
11
state of C01110mia
Lloonood Contractor
off
Fnm*n4M Corporation
om""aw 6 C641040 A Ham
&p.om 07131/2086
W0"9r.8QbJ.M
091AWN
CHSCKKO
oA-ra
SCALE
ion No.
SHEST
OF •64KETO
C
EWEN
010=0
Rs
01
Lm
U.
LL
�c
0
Z
co
state of C01110mia
Lloonood Contractor
off
Fnm*n4M Corporation
om""aw 6 C641040 A Ham
&p.om 07131/2086
W0"9r.8QbJ.M
091AWN
CHSCKKO
oA-ra
SCALE
ion No.
SHEST
OF •64KETO