Loading...
HomeMy WebLinkAbout575 Panama LnCommunity Development Department Douglas Mclsoac, Community Development Director Phil Burns, BuiUng D[rE,,cf or Building Division Phone: (661) 326-3720 FAX: (661) 325-0266 I RE: Notice of Decision - Site Plan Review (Project No. 12-0073) Dear Mr. Carrera: Jim Eggert, Planning Director Planning DWislon Phone: (661) 326-3733 FAX: (661) 852-2136 The Planning Director, upon recommendation of the Site Plan Review Committee, has approved your plans for a 1,541 square foot add'ition to a 1,562 square foot convenience store in w o w rhood Commercial) zone district at 575 Panama Lane. Your proposal, with corrections as noted, meets the minimum required codes, policies and standards for development as adopted by the Bakersfield City Council. Specific items have been identified (see attached Site Plan Compliance List), that you need to resolve before you can obtain a building permit or be allowed occupancy. These items may include changes or additions that need to be shown on the final building Mans, alert you to specific fees, and/or are comments that will help you in complying with the city's development standards. Each item will note when it is to be completed and they have been grouped by department so that you know who to contact if you have questions. Your next step is to either apply for necessary building permits to construct your project, or begin your business activities d'ependingi on the request submitted. You must submit final building plans to the Building Division. The Site Plan Review Committee will review these final plans while building plan check occurs to ensure that you, satisfy the items in the Site Plan Compliance List. Please read them carefully. Failure to satisfy an item may delay your obtaining ai building permit or commencing, your project. After construction of your project but before the City can allow occupancy, the Building Division must inspect the development to find if it complies with the approved plans, and ainy other relevant permits and codes. If you have satisfied all of the requirements, the Building Director will issue a certificate of occupancy- of not, the area inspector will give you a correction notice. Once you have made all of the corrections, the Building Director can issue a certificate of occupancy. You may not occupy a development until the Building Director has issued! a certificate of occupancy. City of Bakersfield a 1715 Chester Avenue Bakersfield, Califomia, e 93301 SPR# 12-0073 Page 2 of 10 In consideration by the City of Bakersfield for land use entitlements, including but not limited to related environmental approvals related to or arising from this project, the applicant, and/or property owner and/or subdivider ("Applicant" herein) agrees to indemnify, defend, and hold harmless the City of Bakersfield, its officers, agents, employees, departments, commissioners or boards ("City " herein) against any and all liability, claims,, actions, causes of actions or demands whatsoever against them, or any of them, before administrative or judicial tribunals of any kind whatsoever, in any way arising from, the terms and provisions of this application, including without limitation any CA approval or any related development approvals or conditions whether imposed by the City, or not, except for City's sole active negligence or willful misconduct. This indemnification condition does not prevent the Applicant from challenging any decision by the City related to this project and the obligations of this condition apply regardless of whether any other permits or entitlements are issued. The City will promptly notify Applicant of any such claim, action, or proceeding, failing under this condition within thirty (3,0) days of actually receiving such claim. The City, in its sole discretion, shall be allowed to choose the attorney or outside low firm to defend the City at the sole cost and expense of the Applicant and the City is not obligated to use any low firm or attorney chosen by another entity or party. Any time after site plan approval but before the approval expires you may submit revisions to the plan. We will treat these revisions as a new site plan application subject to a new review andrequired fees. The Planning Director can only approve minor changes to the orig,inal plan without a new application if they are necessary to meet a condition, mitigation, or result from physical obisfacles or other comparable constraints. 1114-AUR& _711"[04a, Approval of this site plan expires on December 18, 2014 (2 years from the decision clate), unless building permits have been issued, or on projects not requiring a building permit, the use has commenced. The project must be completed within 5 years from the decision date. If the property is rezoned, site plan approval will expire upon the effective date for the rezoning unless the use is permitted in the new zone. The Planning Director may extend the expiration date up to one (1) year if you resubmit new plans for check against the code requirements in effect at that time and include a written request for the extension. we must receive this request befo expiration of the project approval. We will not require a fee for this extension request; however, changes to the plans originally approved for purposes other than code requirements shall be subject to a new site plan review, including payment of all required fees. MA LIF11110110111, 1 1 This site plan review has been found to be exempt from the provisions of the California Environmental Quality Act (CEQA) according to Section 15332. This project is exempt because it is an infill development that is consistent with the general plan and SPR# 12-0073 Page 3 of 10 zoning regulations, is within an area predominantly developed with urban uses, is not identified as critical habitat for endangered or threatened species, will', not significanfly affect traffic noise, air or water quality, and will be adequately served by appropriate utilities and public services. A Notice of Exemption has been prepared and is available for review at the Planning Division (see cover sheet for address). Any person may appeal this decision. An appeal is limited to whether or not an adopted development standard® zoning regulation, mitigation, or policy applied or not applied to the project, was done consistent with the authority granted by city ordinances or the California Environmental Quality Act (CEQA). The appeal must be in writing stating the precise basis or issue as noted, include a $700 filing fee, and must be filed within 10 do ys of the decision date to the City of Bakersfield Planning Commission (c/o Bakers-field Planning Director, 1715 Chester Avenue, Bakersfield, CA, 93301). The Planning Commission will hold a public hearing on the appeal and their decision will be final unless their decision is appealed to the City Council. Site plan approval is based on the statements made in the application and the plans you submitted. Any errors or omissions on these plans could alter the compliance list and/or void this decision. If you have questions about any of the items noted in the Site Plan Compliance List, you must speak to the contact person representing the department requiring that item. If you have other questions regarding general information about the site plan review process, please contact the Planning Division at (661) 326-3733. Sinperel'y, cc: AH interested Agencies - For your records. rma SABZA S P R\ Form s\sprdof a\201 2 spr\ I 2-0073,sprJtr.doc SPR4 12-0073 Page 4 of 10 �Miiiiliiili IS I )Tara "�' W NVA'31 I 1. Prior to review of improvement plans by the City, the developer shall submit a grading plan for the proposed site to be reviewed and approved by the City Engineer and Building Official (Bakersfield Municipal Code Section 116,44.0110). With the grading plan, if the project is subject to the provisions of the National Pollutant Discharge Elimination System (NPDES), a Notice of Intent (NOI) to comply with the terms of the General Permit to Discharge Storm Water Associated with Construction, Activity (WQ Order No. 99-08- DWQ), must be filed with the State Water Resources Control Board in Sacramento before the beginning of any construction activity. Compliance with the general permit requires that a Storm Water Pollution Prevention Plan (SWP,PP) be prepared, continuously carried out, and always be available for li inspection during normal construction hours. 2. A grading permit is required prior to final plan approval. The developer shall submit 4 copies of: grading plans and 2 cop,ies of the preftinary soils report to the Building Division. A final soils report shall also be submitted to the Building Division before they can issue a buHding permit. P�ease note that grading plans must be consistent wJh the final building site plans and landscaping plans. BuHding permits will not be issued until the grading permit is approved by the Building Division, Planning Division (HCP), and Public Works Department. 3, An approved site utilifies plan is required prior to final plan approval. 4. Show on the finial building plan how and where water will be drained from the property. Show on the final building plan pedestrian access from the public way and handicap parking. Private streets are not the public way. 5. The developer shall include fire resistive wall construction details with the final!, building plans for all exterior walls of any building that is within the distance as set forth in Table 6012 of the California Building Code. 6. Include with or show on the final building plans information necessary to verify that the project complies with all disability requirements of Title 24 of the California Building Code. SPR9 12-0073 91 Page 5 q fJO 7. The developer shall obtain all required approvals from the Kern County Environmental Health Services Department (2700 "M " Street, Bakersfield, CA., 933011 PH 661-862-8700) for any food handling facility (ie: market, delicatessen, caf6, concession, restaurant) before building permits can be issued. 8, Buildings or structures shall require installation of an automatic fire sprinkler system where required by current California Building Code and City ordinance. 9. The Building Division will calculate and collect the appropriate school district impact fee at the time they issue a building permit. 10. Final Building plans shall show pedestrian access pathways, or easements, for persons with disabilities from public rights-of-w1ays that connect to aN accessible buildings, facilities, elements, and spaces in accordance with the California Building Code. These pedest6an access ways shall not be parallel to vehicular lanes unless separated by curbs or railings. IL Prior to granting occupancy, the Building Division will verify that a water meter serving the development is in place. Therefore, it is recommended that the developer contact the applicable water purveyor to inquire about their process for obtaining water service for the development as soon as possible. To determine who the water purveyor for the development is, you may contact the City of Bakersfield Water Resources Department (1000 Buena Vista Road, Bakersfield, CA, phone: 661-326-3715). The minimum parking required for this project has been computed based on use and shall be as follows: S,quare Parking Required Use Footage Ratio Parking Existing Store 1,562 sq. ft. I space/300 sq. ft. 5 spaces Proposed Addition 1,5,41 sq. ft. I space/300 sq. ft. 5maces Total Required: 10 spaices (Notei- I I parking spaces are shown on the proposed site plan, By ordinance, compact and tanidem spaces cannot be counted toward meetinN minimum parking requirements.) 2. Minimum parking stall dimensions shall be 9-feet wide by 18-feet long, Vehicles, may hang over landscape areas no more than 2-1/2 feet provided required setbacks along street frontages are maintained, and trees and shrubs are protected from vehicles. SPR# 12-0073 Page 6 of 10 3. All parking lots, driveways, drive aislesi, loading areas, and another vehicular access ways, shaIl • paved with concrete, asphaltic concrete other paved street surfacing material in accordance with the Bakersfield Municipal Code (Sections 15.76i.020 and 17,58,060 A.). 4. Lighting is required for all parking lots, except residential lots with four units or less (Section 17.58.060 A.). Illumination shall be evenly distributed across the parking area with light fixtures designed and arrainged so that light is directed downward and is reflected away from adjacent properties and streets. Use of glare shields or baffles may be required for glare reduction or control of back light, No light poles, standards and fixtures, including bases or pedestals, shall exceed a height of 40 feet above grade. However, light standards placed less than 50 feet from residentially zoned or designated property, or from existing residential development, shall not exceed a height of 15 feet. The final building plans shall include a picture or diagram of the light fixtures being used and show how light will be directed onto the parking area. Please note that staff can require additional adjustments to installed lighting after occupancy to resolve glare or other lighting, problems if they negatively affect adjacent properties. 5. No additional landscaping is required in conjunction with the proposed addition. 6. A solid masonry wall shall be constructed adjacent to residentially zoned and/or designated property as indicated by staff on the returned site plan,. This wall must be shown on the final building plans and shall be constructed a minimum height of 6 feet as measured from the highest adjacent finished property grade. If the parking lot, including drive aisles, delivery areas, loading and ulnloadling areas are within 10 feet of residentially zoned property, a 7-foot wide landscape strip that includes landscaping consistent with Chapter 17.61 shall be installed between the wall and parking/drive areas fas noted on the returned plan). 7. Our records show that the project is contained on more than one parcel (Lots 50 and 51 of Tract 4 parcels shall be merged into one parcel because parking must be on the some site a's the project (Section 17.5&0 1 OB of the B.M.0 J, building setbacks cannot be met based on the design layout, and/or • parcel line bisects a building. A parcel merger or lot line adjustment application removing or relocating property lines shall be submitted to the Planning Division before bulilding permits can be issued. Recordation of the map shall occur before final building • site occupancy can be girarted. If our records are in error and these parcels have been merged, ease provide a copy of the • arcel map, subdivision map,, or certificate of compliance showing the property as one parcel (Note: An Assessor's map is not acceptab/e since it is on/y for tax purposes and does not verify legal parcel status.) 8. Business identification signs are nelther considered nor o Proved under this review. A separate sign perm,if reviewed by the Planning and'Building Divisions and issued by the Building Division, �s required for all new signs, SPR# 12-0073 Page 7 oJ'10 including future use and construction signs. Signs must comply with the Sign Ordinance (Chapter 17.60 of the Bakersfield Municipal Code.) 91, Rooftop areas of commercial buildings (e.g., office, retail, restaurant, assembly, hotel, hospital, church, school), and industrial buildings adjacent to residentially zoned properties, shall be completely screened by parapets or other finished architectural features constructed to a height of the highest equipment, unfinished structural element or unfinished architectural feature of the building. 10. Open storage of materials and equipment shall be surrounded and screened with a solid wall or fence (screening also applies to gates). This fence shall be at least 6 feet in height and materials shall not be stacked above the height of the fence. (Note: Fences taller than 6 feet are allowed in commercial and industrial zones but they will require a building permit). Areas used for outside storage shall be treated with a permanent dust binder or other permanent dust control measure consistent with the regulations of the San Joaquin Valley Air Pollution Control District, (Note: Ali passenger vehicle - parking areas must be paved.) 12. Outside work. storage, sales and display of merchandise and materials, is prohibited. All activities and all storage of merchandise and materials shall be conducted and/or contained within an enclosed building. (Note: This does not include outdoor seating areas for restaurants.) 13. Refuse collection bin enclosures and container areas are subject to all required structural setback from street frontages, and shall not reduce any parking, loading or landscaping areas as required by the Zoning Ordinance. 14. The developer shall meet all regulations of the San Joaquin Valley Air Pollution Control District (Regulation Will concerning dust suppression during, construction of the project, Methods include, but are not limited to; use of water or chemical stabilizer /suppressants to control dust emission from disturbed area, stock piles, and access ways; covering or wetting materials that are transported off -site; limit construction-related speed to 15 mph on all! unpaved areas/washing of construction vehicles before they enter public streets to minimize carryout/track out; and cease grading and earth moving during periods, of high winds (20 mph or more).. 15, Prior to receiving, finial building or site occupancy, you muist contact the Planning Division (staff • contact noted above) for final Inspection and approval of' the landscaping, parking lot, lighting and other relatied site improvements, Inspections will not be conducted until all required items have been installed�. Any deviations from the approved plans without prior approva] from the Planning Division may result in reconstruction and delays in obtaining a building or site occupancy. SPR4 12-00'73 Page 8 of 10 Condition of Approval from Zoning LAodlifi cation No. 12-0172 16. A maximum of one (1) metal storage container is permitted on the subject property, within the southeast portion of the site and screened from public view. The container shall comply with all applicable regulations of Chapter 17.57 (Metal Storage Containers) of the Bakersfield Zoning Ordinance. �111111 a. All fire hydrants, both offsite (nearest to site and on-site, lnclude flow data on all hydrants. Hydrants shall be in good working condition and are subject to testing for verification. Fire flow requirements must be rnet prior to construction commencing on the project site. Please provide, 2 sets of the engineered water plans to Dave Weirather. (Note: All new fire hydrants must be purchased from the Fire Department.) b. A—Ill Lire stand r)ir)e systems., fire alarms and commercial bood tems. These suppression systems require review and permits -5� by the Fire Department. The Fire Department will issue guidelines for these various items as they may apply to this project. C. Prole,-.f address, includina suite number if app-ficalNe, If the project is within a shopping or business center, note the name and address of the center. MEMO P ,igrolmmmgm 2. Alll access (permanent and temporary) to and around any building under construction must be at least 20 feet wide, contain no vehicle obstruction, and be graded to prevent standing water. Barricades must be in place where ditches and barriers exist in or cross roadways. Emergency vehicle access must always be reliable. D. PUBLIC WORKS - ENGINEERING (Staff contact- George G111burg 661-326-3992 I The developer shall construct 5-foot 6-inch wide sidewalks along Betty Streeit according to adopted city standards. These improvements shall'be shown on the final building plans submitted to the Building Division before any building permits will be issued. 2. lf a grading plan is required by the Building Division, building permits will: not be issued until the grading plan is approved by tgjh the Public Works Department and the Building Division, I Before any building or site can be occupied, the developer must reconstruct or repair substandard oft -site street improvements that front the site to adopted city standards as directed by the City Engineer. Please call the SPRO 12-0073 page 9 o f 10 Construction Superintendent at 661-326-3049 to schedule a site inspection, to find out what improvements may be required. 4. A street permit from the Public Works Department shall be obtained before any work can be done within the public right-of-way (streets, alleys, easements). Please inciucle a copy of this site plan review decision to the department at the time you apply for this permit. A sewer connection fee shall be paid at the time a building permit is issued. We will base this fee at the rate in effect at the time a bulilding permit is issued. 6. A transportation impact fee for regional facilities shall be paid at the time a building permit is issued, or if no building permit is required, before occupancy of the building or site. This fee will be based at the rate in effect at the time The building permit is issued, The, Public Works Department will calculate an estimate of the total fee when you submit construction plans for the project. 7. The developer shall either construct the equivalent full width landscaped median island in Panama Lane along the development's frontage or pay their proportionate share (I /2-width) of the total cost for the future construction of the median. Median islands shall be designed by the first development that occurs ailong an applicable street frontage. That developer shall either construct the full width landscaped median island or pay the median island fee, The median island fee shall be satisfied by fulfilling one of the following options: (1') Pay the standard fee of $100 per linear foot; or (2) Pay the calculated fee based upon actual cost estimates prepared by the Project Engineer, which shall be reviewed and approved by the City Engineer. if the median isllandl is not constructed by the first development along an applicable street frontage, the second development along that street frontage shall construct the full width landscaped median, island. 8. The developer shall form a new maintenance district. P. All storm water generated on the project site, including the street frontage shall be retained onsite unless otherwise allowed by the Public Works Department (please contact the Public Works Department - Subdivisions at 661-326-3576), 10. This project may be located within a Planned Sewer Area, Please contact the Public Works Department - Subdivisions at 661-326-3576 to determine what fees may app) y. 11, This project may be located within a Planned Drainage Area. Please contact the Public Works Department - Subdivisions at 661-326-3576 to determine what fees may apply. MI R# 12-0073 Page /0 Of,10 1 1 1 1 1 J J J I I I I Ji J Jill Cart service I cubic yard/week or less I time per week Front loader bin services I cubic yard/week - 12 cubic yards /day Roll-off compactor service More than 12 cubic yards/d'ay 2 Show on the final building plans refuse bin enclosures. Each enclosure shall! be designed according to, adopted andard (Detail #ST25 A and J at the size checked bel[ow 0. Before, occupancy of the building or site is allowed, two 3 cubic yard front loading type refuse bin(s) shall be placed within the required losure(s). El 6cleep x 8'wide (I bin) El 8'deep x ]i 5wide (3 bins) P1 8'deep x I O'wide (2 bins) El 8'deep x 20'wide (4 bins) NOTE: All measurements above gre curb-to-curb dimensions Inside the enclosure. if both refuse and recycling containers are to be combined in the some enclosure area, this area must be expanded in size to accommodate multiple containers /bins (contact the staff person above for the appropriate enclosure size). 3. Facilities that require infectious waste services shall obtain approval for separate infectious waste storage areas from the Kern County Health Department, In no instances shall' the refuse bin area be used for infectious waste containment purposes, 4. Facilities that require grease containment must provide a storage location, that is separate from the refuse bin location. This shall be shown on the final building plans. 5. Facilifies, that participate in recycling operations must provide a location, that is separate from the refuse containment area. SV oj Al� Lel now= ■ I Ora 41 % 19 4e �P9 4e V 00 1,0 Do leg,56 lk Aar 2v, j, 01- f 7V,10,,, =4 44 to CO 19, ✓- Ct4 +1 00 µ to co Fri 61 ,1 8 C") 0, oz now= ■ I C;4! 41 IR lk 2v, j, 01- ST CO Ct4 +1 00 co Fri 61 C;4! lk 2v, j, ST C;4! Rif -