Loading...
HomeMy WebLinkAbout11100 River Run BlvdCommunity Development Department Douglas Mclsaac, Community Development Director Phil Burris, Bufldeng DIrector Building Division Phone. 16,61) 326-3720 FAX: (661) 325-0266 David Y. Mila AIA 1'330 22nd Street B RE- Notice of Decision -Site Plan Review (Project No. 12-0420) Dear Mr. Mila77o: Jim Eggert, Planning Director Planning Division Phone: (661) 326-3733 FAX: (661) 852-2136 The Planning Director, upon recommendation of the Site Plan Review Committee, has approveclyour plans to construct a 3-story, 54,336 square foo,f general office building in a C-0 (Professional and Administrative Office) zone district at I 1100 River Run Blvd. Your proposal, with corrections as noted, meets the minimum required codes, policies and standards for development as adopted by the Bakersfield City Council, Specific items have been identified (see attached Site Plan Compliance List) that you need to resolve before you can obtain a building permit or be allowed occupancy. These items may include changes or additions that need to be shown on the final building plans, alert you, to specific fees, and/or are comments that will help you in complying with the city's development stainclards. Each item will note when it is to be completed and they have been grouped by department so that you know who to contact if you have questions. Your next step is to either apply for necessary building permits to construct your project, or begin your business activities depending on the request submitted. You must submit final building plans to the Building Division, The Site Plan Review Committee will review these final plans while building plan check occurs to ensure that you satisfy the items in the Site Plan Compliance List. Please read them carefully. Failure to satisfy an item may delay your obtaining a building permit or commencing your project. After construction of your project but before the City can allow occupancy, the Building Division must inspect the development to find ) if it complies with the approved plans, and any other relevant permits and codes. If you have satisfied all of the requirements, the Building Director will issue a certificate of occupancy; of not, the area inspector will give you a correction notice. Once you have made all of the corrections, the Building Director can issue a certificate of occupancy. You may not occupy a development until the Building Director has issued a certificate of occupancy. City of Bakersfield a 1.715 Chester Avenue 9 Bak ersfiiold, Caffomia * 93301 SP R if 12-0420 R"'N"JIMM11060" JIM, Page 2 q JV I In consideration, by the City of Bakersfield for land use entitlements, including but not limited to related environmental approvals related to or arising from this project, the applicant, and/or property owner and/or subdivider ("Applicant" herein) agrees to indemnify, defend, and' hold harmless the City of Bakersfield, its officers, agents, employees, departments, commissioners or boards ("City " herein) against any and all liability, claims, actions, causes of actions or demands whatsoever against them, or any of them, before administrative or judicial tribunals of any kind whatsoever, in any way arising i from, the terms and provisions of this application, including without limitation any CEQA approval or any related development approvals or conditions whether imposed by the City, or not, except for City's sole active negligence or willful misconduct. This indemnification condition does not prevent the Applicant from challenging any decision by the City related to this project and the obligations of this condition apply regardless of whether any other permits or entitlements are issued. The City will promptly notify Applicant of any such claim, action, or proceeding, failing under this condition within thirty (30) days of actually receiving such claim. The City, in its sole discretion, shall be allowed to choose the attorney or outside law firm to defend the City at the sole cost and expense of the Applicant and the City is not obligated to use any law firm or attorney chosen by another entity or party. JW1211Z Any time after site plan approval but before the approval expires you may submit revisions to the plan. We will treat these revisions as a new site plan application subject to a new review and required fees. The Planning Director can only approve minor changes to the original plan without a new application if they are necessary to meet a condition, mitigation, or result from physical obstacles or other comparable constraints. Approval of this site plan expires on December 17, 2014 (2 years from the decision date), unless building permits have been issued, or on projects not requiring a building permit, the use has commenced. The project must be completed within 5 years from the decision date. If the property is rezoned, site plan, approval will expire upon the effective date for the rezoning unless the use is permitted in the new zone. The Planning Director may extend the expiration date up to one (1) year if you resubmit new plans for check against the code requirements in effect at that time and include a written request for the extension. We must receive this request before expiration of the project approval. We will not require a fee for this extension request however, changes to the plans originally approved for purposes other than code requirements shall be subject to a new site plan review, including payment of all required fees. 140 M-1612 11,111f-11,11][1111114 JR13 'N This site plan review has been found to be exempt from the provisions of the California Environmental Qualify Act (CEQA) according to Section 15332. This project is exempt because it is an infill development that is consistent with the general plan and SPR #12-0420 Page 3 ql'l I zoning regulations, is within an area predominantly developed with urban uses, is not identified as critical habitat for endangered or threatened species, will not significantly affect traffic noise, air or water quality, and wil'l'be adequately served by appropriate utilities and public services. A Notice of Exemption has been prepared and is available for review at the Planning Division (see cover sheet for address). Any person may appeal this decision. An appeal is limited to whether or not an adopted development standard, zoning regulation, mitigation, or policy applied or not applied to the project, was done consistent with the authority granted by city ordinances or the California Environmental Quality Act (CEQA). The appeal must be in writing stating the precise basis, or issue as noted, 'Include a $700, tiling fee, and must be filed within 10 4M of the decision date to the City of Bakersfield Planning Commission (c/o Bakersfield Planning Director, 1715 Chester Avenue, Bakersfield, CA, 93301). The Planning Commission will hold a public hearing on the appeal and their decision will be final unless their decision is appealed to the City Council. Site plan approval is based on the statements made in the application and the plans you submitted. Any errors or omissions on these plans could alter the compliance list and/or void this decision. If you have questions about any of the items noted in the Site Plan Compliance List, you must speak to the contact person, representing the department requiring that item. If you have other questions regarding general information about the site plain review process, please contact the Planning Division at (661) 326-3733. erely, cc: All Interested Agencies- For your records. rma S:\BZA-5PR\Forms\spr-data\2012 spr\ I 2-0420,spr,ltr.doc M SPR #12-04201 Page 4 of H I pqi liq 11111111111111 Omff'ov -agumn 1 11 1 111 �;i i'' I iiii I amil I 14!k r, o I*] I 2. A grading permit is required prior to final plan approval. The developer shall submit 4 copies • grading plans and 2 copies of the prel'iminary soils report to the BuMing Division. A final soils report shall also be submitted to the Building D on before they can issue a building permit. Please note that grading plans must be consistent with the final building site p,lans and landscaping plans. Building permits will not be issued until the grading permit is approved by the Building Division, Planning Division (HCP), and Public Works Department, 3. An approved site utilities plan is required prior to final plan approval. Fil. Show on the final building plan pedestrian access from, the public way and handicap parking. Private streets are not the pub4c way. 5. Include with or show on the final building plains information necessary to verify that the project complies with all disability requirements of Title 24 of the California Building Code. 6. Buildings or structures shall require installation of an automatic fire sprinkler system where required by current California Building Code and City ordinance. ► The Building Division wiH calculate and collect the appropriate school districT impact fee at the time they issue a building permit. SPI? #12-0420 9 Page 5 qf']] 81. Final Building plans shall show pedestrian access pathways or easements for persons with disabilities from public rights-of-ways that connect to all accessible buildings, facilities, elements, and spaces in accordance with the California Building Code. These pedestrian access ways shall not be parallel to vehicular lanes unless separated by curbs or railings. 9. Prior to granting occupancy, the Building Division will verify that a water meter serving the development is in place. Therefore, it is recommended that the developer contact the applicable water purveyor to inquire about their process for obtaining water service for the development as soon as possible. To determine who the water purveyor for the development is, you may contact the City of Bakersfield Water Resources Department (I O00 Buena Vista Road, Bakersfield, CA, phone: 661-326-3715). KOJ' 7 41=07,7 =#1914 = k. W 10 1. The minimum parking required for this project has been computed based on use and shall' be as follows: Includes 11200 River Run Boulevard, which is presently under construction. (Note: 518 parking spaces are shown on the proposed site plan, including on-street parking. By ordinance, compact and tandem spaces cannot be counted toward meeting parking requirements.) 2. Minimum parking stall dimensions shall be 9-feet wide by 18-feet long, Vehicles may hang over landscape areas no more than 2-1/2 feet provided required setbacks along street frontages are maintained, and trees and shrubs are protected from vehicles. 3. All parking lots, driveways, drive aisles, loading areas, and other vehicular access walys, shall be paved with concrete, asphaltic concrete (A. C.), or other paved street surfacing material in accordance with the Bakersfield Municipal Code (Sections 15.76.020 and 17,58.060 A.). 4. Lighting is required for all parking lots, except residential lots with four units or less (Section 17.58,060 A.). 11lumination shall be evenly distributed across the parking area with light fixtures designed and arranged so that light is directed downward and is reflected away from adjacent properties and streets. Use of glare shields or baffles may be required for glare reduction or control of back light, No light poles, standards and fixtures, including bases M r pedestals, shall exceed a height of 40 feet above grade, However, light Square Parking Required Use Footage Ratio Parking Existing* General office 73,8,63 sq. ft. I space/250 sq. ft, 295 spaces E-ro-pg—sed General office 55,893 sq. ft. I space/250 sq, ft. 224 spaces Required Parking: 5119 spaces Includes 11200 River Run Boulevard, which is presently under construction. (Note: 518 parking spaces are shown on the proposed site plan, including on-street parking. By ordinance, compact and tandem spaces cannot be counted toward meeting parking requirements.) 2. Minimum parking stall dimensions shall be 9-feet wide by 18-feet long, Vehicles may hang over landscape areas no more than 2-1/2 feet provided required setbacks along street frontages are maintained, and trees and shrubs are protected from vehicles. 3. All parking lots, driveways, drive aisles, loading areas, and other vehicular access walys, shall be paved with concrete, asphaltic concrete (A. C.), or other paved street surfacing material in accordance with the Bakersfield Municipal Code (Sections 15.76.020 and 17,58.060 A.). 4. Lighting is required for all parking lots, except residential lots with four units or less (Section 17.58,060 A.). 11lumination shall be evenly distributed across the parking area with light fixtures designed and arranged so that light is directed downward and is reflected away from adjacent properties and streets. Use of glare shields or baffles may be required for glare reduction or control of back light, No light poles, standards and fixtures, including bases M r pedestals, shall exceed a height of 40 feet above grade, However, light SPR 9,12-0420 Page 6 ref standards Placed less than 50 feet from residentially zoned or designated property, or from existing residential development, shall not exceed a height of 15 feet. The final building plans shall include a picture or diagram of the light fixtures being used and show how light will be directed onto the parking area. Nease note that staff can require additional adjustments to installed lighting after occupancy to resolve glare or other lighting problems if they negatively affect adjacent properties. 5. Because parking and/or access is being shared with adjacent properties, the developer shall file with the Planning Division before any building permits are issued a copy of a recorded map, C. C. and R.'s, or other instrument that ensures that drive aisles, parking, and access is legally shared in common with adjoining properties as depicted on the site plan for the life of the project. The developer shall include a copy of a final landscape plan with each set of the final building plans submitted to the Building Division. Building permits will not be issued until the Planning Division has approved the final landscape plan for consistency with approved site plans and minimum ordinance standards (please refer to the landscaping requirements Chapter (NIOTE�, At the time a final site Inspection is conducted, It Is expected that plants will match the species Identified' and be Installed in the locations consistent with'the approved landiscape plan. Changes made without prior approval of the Planning staff may result in the removal and/or relocation of Installed plant materials and delays in obtaining building occupancy.) 7. Business 'identification signs are neither considered nor 90proved under this review. A separate sign permit reviewed by the Planning and Build'ing Divisions and issued by the Bui�ding Division, is required for d! new signs, including future use and construction signs. Signs must comply with the Sign Ordinance (Chapter 17.60 of the Bakersfield' Municipal Code.) 8. Habitat Conservation fees shall be required for this project and will be calculated based on the fee in effect at the time we issue an urban development permit (includes grading plan approvals) as defined in the Implementation/Management Agreement (Section 2.21) for the MetropoRan Bakersfield Habitat Conservation Plan. Upon payment of the fee, the applicant will receive acknowledgment of compliance with Metropolitan Bakersfield Habitat Conservation Plan (implementation/Management Agreement Section .1' .4j. This fee is currently $2,145 per gross acres, payable to the City of Bakersfield (submit to the Planning Division). This fee must be paid before any grading or other site disturbance occurs. Forms and instructions are available at the Planning Division or on the city's web site at www.bakersfield C t (go to Development Services Department), SPR 02-0420 Page 7 qI'I I The current Metropolitan Bakersfield Habitat Conservation Plan (MBHCP) expires in year 2014. Projects may be issued an! urban development permit, grading plan approval, or bWding permit and as fees prior to the 2014 expiration date under the current MBHCP. As determined by the City of Bakersfield, only projects ready to be issued an urban development permit, grading plan approval or building permit before the 2014 expiration date will be eligible to pay fees under the current MBHCP. Early payment or pre- payment of MBHCP fees shall not be allowed, The ability of the City to issue as development permits is governed by the terms • the MBHCP. Urban development permits issued after the 2014 expiration date may be subject to a new or revised Habitat Conservation Plan, if approved, or be required to comply directly with requests of the U.S. Fish and Wildlife Agency and the California Fish and Game Department, 9. Prior to ground disturbance, the developer shall have a qualified consultant survey the location for burrowing owls, and co y with the provisions • the Migratory Bird Treaty Act (MBTA) of 1918 (16 U�&C. 703-711)1. Survey protocol shall be that recommended by the State Department of Fish and Game. Developers shall be siubjecf to the mitigation measure recommended by the consultant. A copy of the survey shall be provided to the Planning Department prior to ground disturbance. The burrowing owl is a migratory bird species protected by international treaty under the Migratory Bird Treat Act (MBTA) of 1918 (16 Ul.S.C. 703-711). The MBTA makes it unlawful to take, possess, buy, sell, purchase, or barter any migratory bird listed in 50 C.F.R. Part 10 including feathers or other parts, nests, eggs, or products,, except as allowed by implementing regulations (50 C.F.R. 21). Sections 3503, 3503.5, and 3800 of the California Cie artmenf of Fish and Game destruction of birds, their nests ore s. To avoid violation of the provisions, of these laws generally requires that project related disturbance at active nesting territories be reduced or eliminated during critical phases of the nesting ,cycle (larch I- August 15, annually). Disturbance that causes nest abandonment and/or loss of reproductive effort (e.g., killing or abandonment of eggs or young) may be considered "faking" and is potentially punishable by fines and/or imprisonment. 1 0 . Prior to ground disturbance, the developer shall have a qualified consultant survey the location for kit fox, and comply with the provisions of the Metropolitan Bakersfield Habitat Conservation Plan. Survey protocol shall be recommended by the State Department of Fish and Game. Develloper shall be subject to the mitigation measures recommended by the consultant, A copy of the survey shall be provided to the Planning Department prior to ground disturbance. 11. Rooftop areas of commercial buildings (e.g�., office, retail, restaurant, assembly, hotel, hospital, church, school'), and industrial buildings adjacent to residentially zoned properties, shall be completely screened by parapets or other finished architectural features constructed to a height of the highest equipment, unfinished structural element or unfinished architectural feature of the building. SIT 012-0420 Page 8 qf' /I 12. Refuse collection bin enclosures and container areas are subject to all required structural setback from street frontages, and shall not reduce any parking, loading or landscaping areas as required by the Zoning Ordinance. 13. In the event previously undocumented oil /gas well is uncovered or discovered on the project, the developer is responsible to contact the Department of Conservation's Division of 011, Gas, and Geothermal Resources (DOGGR), The developer is responsible for any remedial operations on the well required by DOGGR. The developer shall also be subject to provisions of BBC Section 15.66.080 (B), 14. The developer shall meet all regulations of the Son, Joaquin Valley Air Pollution Control District (Regulation VIII) concerning dust suppression during construction of the project. Methods include, but are not limited to; use of water or chemical stabilizer/suppressants to control dust emission from disturbed area, stock piles, and access ways; covering or wetting materials that are transported off-site; limit construction-related speed to 15 mph on all unpaved areas/washing of construction vehicles before they enter public streets to minimize carryout/track out; and cease grading and earth moving during periods of high winds (20 mph or more). 15. Prior to receiving final building or site occupancy, you must contact the Planning Division (staff contact noted above) for final inspection and approval of the landscaping, parking lot, lighting and other related site improvements. Inspections will not be conducted until all required items have been installed, Any deviations from the approved plans without prior approval from the Planning Division may result in reconstruction and delays in obtaining a building or site occupancy. 16. Mature and dense trees shall be installed all ailong Stockdale Highway and Buena Vista Road. Mature and dense shall mean not less than 20 thirty-six inch (36") box frees and 20 twenty-four inch (24") box trees. Not less than 50% of said frees shall be trees which are non-deciduous in nature. 17. Developer shall construct meandering sidewalks with berming (not t* exceed 4 feet) along Stockdale Highway and Buena Vista Road, 18. Buildings shall be setback a minimum of 25 feet from property lines along Stockdale Highway and Buena Vista Road. 19. A common architectural or design theme shall apply to the entire GPA/ZC 03-0745 office commercial site; such theme shall be consistent and in harmony with the theme along the north side of Stockdale Highway between Buena Vista Road and Calloway Drive. 20. Parking lot security lighting shall be provided by no more than 40,000 lu'men lamp poles, except that within back of buildings the lighting shall be limited to 22,000 l'umen lamp poles, which shall be limited in height to 20 feet. SPR 412-0420 Page 9 qf I I 21, The developer shall design exterior elevations and facades with minimum use of glazing, mirrors and reflective materials, or colors to the satisfaction of the Planning Director, a. Alll fires rinkler arud or stand) i e s stems firm alarms and comnerciall hood systems. These suppression systems require review and permits by the Fire Department. The Fire Department will issue guidelines for these various items as they may apply to this project, 2. The developer must request an inspection from the Water Resources Department (1000 Buena Vista Road, Bakersfield, CA, phone: 661-3,26-37 11 5) for any underground sprinkler feeds at least 24 hours before they are buried. The Prevention Services Division (1501 Truxtun Avenue, Bakersfield CA, Phi. 661/326-3979,) must complete all on-site inspections of fire sprinkler systems and fire alarm systems before any building is occupied. 3. All access (permanent and temporary) to and around any building under construction must be at least 20 feet wide, contain no vehicle obstruction, and be graded to prevent standing water. Barricades must be in place where ditches and barriers exist in or cross roadways. Emergency vehicle access must always be reliable. D. PUBiLIC WORKS - ENGINEERING (Staff conitaict - George Gillburg 661-326-3992 The developer shall install new connection(s) to the public sewer system. This connection shall be shown on the final building plans submitted to the Building Division before any building permits will be issued. 2. All on-site areas required to be paved (ie. parking lots, access d(ives, loading areas, etc.) shall consist of concrete, asphaltic concrete (Type B. A. C.) or other paved street mate(bl approved by the City Engineer. Pavement shall be a minimuirn thickness of 2 inches over 3 inches of approved base material (ie. Class ll A. B.) if concrete is used, it shall be a minimum thickness of 4 inches per Municipal Code Section 17.58.060, paragraph A. Thi's paving standard shc1l be noted on the final building plans submitted to the Building Division before any building permits will'be issued. 3. If a grading plan is required by the Building Division, building permits will not be issued until the grading plan is approved by t2± the Public Works Department and the Building Division. 4. Before any building or site can be occupied, the developer must reconstruct or repair substandard off-site street improvements that front the site to adopted city standards as directed by the City Engineer, Please call the Construction Superintendent of 661-326-3049 to schedule a site inspection to find out what improvements may be required. SPR 412-0420 FA Page 10 of I I 5, A street permit from the Public Works Department shall be obtained before any work can be done within the public right-of-way (streets, alleys, easements). Please include a copy of this site plan review decision to the department at the time you apply for this permit. 6. A sewer connection fee shall be paid at the time a building permit is issued, We will base this fee at the rate in effect at the time a building permit is issued. 7. A transportation impact fee for regional facilities shall be paid at the time a building permit is issued, or if no building permit is required, before occupancy of the building or site. This fee wild be based at the rate in effect at the time the building permit is issued. The Public Works Department will calculate an estimate of the total fee when you submit construction plans for the project, VI. The developer shall form a new maintenance district, Undeveloped parcels with an existing Maintenance District are required: to update Maintenance District documents. Updated documents, including Proposition 218 Ballot and Covenant, shall be signed and notarized. All storm water generated on the project site, including the street frontage shall be retained ons,ite unless otherwise allowed by the Public Works Department (please contact the Public Works Department - Subdivisions at 661-326-3576). 10. This project may be located within a Planned Sewer Area. Please contal the Public Works Department - Subdivisions at 661-326-35,76 todetermine what fees may apply. ill, This project may be located withiin a Planned Drainage Area, Please contact the Public Works Department - Subdivisions a�t 661-326-3576 t* determine what fees moy apply. 1 11 - 11; � I ff ""r 24MME11 Imll=�����l���illill illilI Cart service 1 cubic yard/week or less I time per week Front loader bin services I cubic yard/week - 12 cubic yards/day Roll-off compactor service More than 12 cubic yards/day 2. Show on the final building plans refuse bin enclosures. Each enclosure shall be designed according to adopted city standard (Detail #ST25 A and B), at the size checked below RL Before occupancy of the building or site is SPR 412-0420 Page 1.l ql'l I allowed, four 3 cubic yard front loading type, refuse bin(s) shall be placed within the required enclosure(s). W 6" deep x 8'wide (I bin) El 8'deep x 15'Wde (3 bins) 7 8' deep x 1 O'wide (2 bins) 2 8'deep x 20'wide (4 bins) enclosure. If both refuse and recycling containers are to be combined in the same enclosure area, this area must be expanded in size to accommodate multiple containers/bins (contact the staff person above for f he appropriate enclosure size). M Show on the final" building plans one compactor roll-off bin location. Please contact staff for additional information on compactor requirements and placement, 3. Facilities that require infectious waste services shall obtain approval for separate infectious waste storage areas from the Kern County Health Department. In no instances shaEl the refuse bin area be used for infectious waste containment purposes. 4. Facilities that require grease containment must provide a storage location that is separate from the refuse bin location. This shall be shown on the final building plans. 5. Facilities that participate in recycling operations must provide a location that is separate from the refuse containment area. T -H 04 Q'3