Loading...
HomeMy WebLinkAboutAppendix Q Basin 1Storage (AC-FT) 0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 Elev (ft) 798.50 799.29 800.07 800.86 801.64 802.43 803.21 804.00 123456789 Jan2010 Flow (cfs) 0 4 8 12 16 Reservoir "Detention 1" Results for Run "Shalimar Proposed 100" Run:SHALIMAR PROPOSED 100 Element:DETENTION 1 Result:Storage Run:SHALIMAR PROPOSED 100 Element:DETENTION 1 Result:Pool Elevation Run:SHALIMAR PROPOSED 100 Element:DETENTION 1 Result:Outflow Run:SHALIMAR PROPOSED 100 Element:DETENTION 1 Result:Combined Flow