April 29, 2013
Chris Zuech
Skarphol Associates
1801 Oak Streef,
llprollwzm
RE* Notice of Decision - Site Plan! Review (Project No,, 13-01154)
Dear Mr. Zuech:
Jim Eggert, Planning Director
Planar ling DMsicn
Phone: (661) 326-3733
FAX: (661) 852-2 l 36
The Planning Director, upon recommendation of the Site Plan Review Committee,
has approved your plans to convert a car wash buildling to a lube as and to conistruct
an automated car wash addition to a convenience store in a C-2 (Regional Commercial
Zone) district at 800 34thStreet.
Your proposal, with corrections as noted, meets the minimum required codes,
policies and standards for development as adopted by the Bakersfield City Council.
Specific items have been identified (see attached Site Plan Compliance List) that you
need to resolve before you can obtain al building permit or be allowed occupancy.
These items may include changes or additions that need to be shown on the final building
plans, alert you to specific fees, and/or are comments that will help you in complying with
the city's development standards. Each item will note when it is to be completed and'
they have been grouped by department so that you know who to contact if you have
questions.
Your next step is to either apply for necessary building permits to construct your
project, or begin your business activities depending on the request submitted. You must
submit final building plans to the Building Division. The Site Plan Review Committee will
review these final plans while building plan check occurs to ensure that you satisfy the
items In the Site Plain Compliance List, Please read them carefully. Failure to saflsfy an
item may delay your obtaining a building permit or commencing your project,
After construction of your project but before the City can allow occupancy, the
Building Division must inspect the development to find if it complies with the approved"
plans, and any other relevant permits and codes. If you have satisfied all of the
requirements, the Building Director will issue a certificate of occupancy; of not, the area
inspector will give you a correction notice. Once you have made all of the corrections,
the Building Director can issue a certificate of occupancy. You may not occupy a
development until the Bu*ildling Director has issued a certificate of occupancy.
City of Bakersfield * 1715 Chester Avenue * Bakersfield, California 9 93301
SPRH 13-0154
Page 2 qJ'9
In consideration by the City of Bakersfield for land use entitlements, including but
not limited to related environmental approvals related to or arising from this project, the
applicant, andl /or property owner and/or subdivider ("Applicant" herein) agrees to
indemnify, defend, and hold harmless the City of Bakersfield, its officers,, agents,
employees, departments, commissioners and boards ("City " herein) against any and all
liability, claims, actions, causes of actions or demands whatsoever against them, or any of
them, before administrative or judicial tribunals of any kind whatsoever, in any way arising
from, the terms and provisions of this application, including without limitation any CEQA
approval or any related development approvals or conditions whether imposed by the
City, or not, except for City's sole active negligence or willful misconduct.
This indemnification condition does not prevent the Applicant from challenging any
decision by the City related to this project and the obligations of this condition apply
regardless of whether any other permits or entitlements are issued.
The City will promptly notify Applicant of any such claim, action, or proceeding,
failings under this condition within thirty (3 ) days of actually receiving such claim. The City,
in its sole discretion, shall be allowed to choose the attorney or outside low firm to defend
the City at the sole cost and expense of the Applicant and the City is not obligated to use
any low firm or attorney chosen by another entity or party.
Any time after site plan approval but before the approval expires, you may submit
revisions to the plan. We will treat these revisions as a new site plan application subject to
a new review and required fees. The Planning Director can only approve minor changes
to the original plan without a new application if they are necessary to meet a condition,
mitigation, or result from physical obstacles or other comparable constraints.
Approval of this site plan expires on April 23.20 1 (2 years from the decision date),
unless building permits have been issued, or on projects not requiring a building permit,
the use has commenced. The project must be completed within 5 years from the decision
date. If the property is rezoned, site plan approval will expire upon the effective date for
the rezoning unless the use is permitted in the new zone,
The Planning Director may extend the expiration date up to one (1) year if you
resubmit new plans for check against the code requirements in effect at that time and
include a written request for the extension. We must receive this request before expiration
of the project approval. We will not require a fee for this extension request; however,
changes to the plans originally approved for purposes other than code requirements shall
be subject to a new site plan review, including payment of all required fees.
This site plan review has been found to be exempt from the provisions of the
California Environmental Quality Act (CEQA) according to Section: 15332. This project is
exempt because it is an infill development that is consistent with the general plan and
SPR# 13-0154 Page 3 of 9
zoning regulations, is within an area predominantly developed with urban uses, is not
identified as critical habitat for endangered or threatened species, will not significantly
affect traffic noise, air or water quality, and will be adequately served by appropriate
utilities and public services. A Notice of Exemption has been prepared and is available for
review at the Planning Division (see cover sheet for address).
Any person may appeal this decision. An appeal is limited to whether or not an
adopted deveilopment standard, zoning regulation, mitigation, • poilicy applied or not
applied to the project, was done consistent with the authority granted by city ordinances
or the California Environmental Quality Act (CEQA). The appeal must be in writing stating
the precise basis or issue as, noted, include a $700 filing fee, and must be filed within 10
OM of the decision date to the City of Bakersfield Planning Commission (c/o Bakersfield
Planning Director, 1715 Chester Avenue, Bakersfield, CA, 93301). The Planning Commission
will hold a public hearing on the appeal and their decision will be final unless, their decision
is appealed to the City Council.
Site plan approval is based on the statements made in the application and the
plans you submitted. Any errors or omissions on these plans could alter the compliance list
and/or void this decision. If you have questions about any of the items noted in the Site
Plan Compliance List, you must speak to the contact person representing the department
requiring that item. If you have other questions regarding general information about the
site plan review process, please contact the Planning Division at (661) 326-3733,
0 MW
cc: All Interested Agencies - For your records.
rma
S:\BZA-SPR\Forms\sp,r�-dai,a\2013 spr\ I 3-0154,sprIfr-docx
anning Director
SITH 13-0154 Page 4 of 9
11111111���
2. Show on the final building plan how and where water will be drained from
the property,
3. Show on the final building plan pedestrian access from the public way and
handicap parking. Private streets are not the public way,
4. Include with or show on the final building plains information necessary to
verify that the project complies with all disability requirements of Title 24 of
the California Building Code.
5. The developer shall obtain all required approvals from the Kern County
Environmental Health Services Deportment (2700 "M" Street, Bakersfield, CA.,
9330 1; PH 661-862-8700) for any food handling facility (ie: market,
delicatessen, caf6, concession, restaurant) before building permits can be
issued.
6. The Building Division will calculate and collect the appropriate school district
impact fee at the time they issue a building permit.
7, Final Building plans shall show pedestrian access pathways or easements for
persons with disabilities from public Kghts-of-ways that connect to all
accessible buildings, facilities, elements, and spaces in accordance with the
California Building Code. These pedestrian access ways shall not be parallel
to vehicular lanes unless separated by curbs • railings.
8. Prior to granting occupancy, the Bulilding Division will verify that a waiter
imeter serving the development is in place. Therefore, it is recommended
that the developer contact the applicable water purveyor to inquire about
their process for obtaining water service for the development as soon as
possible. To determine who the water purveyor for the development is, you
may contact the City of Bakersfield Water Resources Department (11000
Buena Vista Road, Bakersfield, CA, phone: 661-326-3715),
SIIR# 13-0154 Page 5 qf9
B. C MM. DEVELOPMENT — PLANNING (Staff contact —Hai a ird Cox 661 326-3673)
The minimum parking required for this project has been computed based on
use and shall be as follows:
(Note: 12 parking spaces are on the propiosed'site plan. By
ordinance, compact and tandem spaces cannot be counted toward
meeting minimum parking requirements.)
2. Minimum parking stall dimensions shall be 9-feet wide by 18-feet long.
Vehicles may hang over landscape areas no more than 2-1/2 feet provided
required setbacks along street frontages are maintained, and trees and
shrubs are protected from vehicles,
3 All
as • I'c�ts, driveways, drive aisles, loading areas, and other vehicular
access, ways, shall be paved with concrete, asphaltic concrete (A. C.), or
other paved street surfacing material in accordance with the Bakersfield
Municipal Code (Sections 15.76.020 and 17.58.060 A.)i
4. Ughting is required for all parking lots, except residential lots with four units or
less (Section '17.58.060 A.). Illumination shall be evenly distributed across the
parking area with, light fixtures designed and arranged so that light is
directed downward and is reflected away from adjacent properties and
streets. Use of glare shields or baffles may be required for glare reduction or
control of back light. No light poles, standards and fixtures, including bases
or pedestals, shall exceed a height of 40 feet above grade. However, ligiht
standards placed less than 50 feet from residentially zoned or designated
property, or from existing residential development, shall not exceed a height
of 11 5 feet. The final buildling plans shall include a picture or diagram of the
light fixtures being used and show how light will be directed onto the parking
area. Please note that staff can require additional adjustments to installed
lighting after occupancy to resolve glare or other lighting problems if they
negatively affect adjacent properties.
5. The developer shall include a copy of a final landscape plan with each set
of the final building plans submitted to the Building Division,. Building permits
will not be issued until the Planning Division has approved the final
landscape plan for consistency with approved site plans, and minimum
ordinance standards (please refer to the landscaping requirements in
Chapter 17.61), Developer shall replace all missing trees in existing planters
per City of Bakersfield landscape standards.
Square
Parking
Required
Use
Footage
Ratio
Parking
Convenience store
2,569 sq. ft.
I space/200 sq. ft.
13 spaces
Car wash
NA
NA
NA
Lube shop
747 sq, ft.
I space/500 sq. ft.
I space
gas p!i=re2d�t
NA
(2 sp aces/ purn p) .__I§jpacesL
Total Required:
6 spaces
(Note: 12 parking spaces are on the propiosed'site plan. By
ordinance, compact and tandem spaces cannot be counted toward
meeting minimum parking requirements.)
2. Minimum parking stall dimensions shall be 9-feet wide by 18-feet long.
Vehicles may hang over landscape areas no more than 2-1/2 feet provided
required setbacks along street frontages are maintained, and trees and
shrubs are protected from vehicles,
3 All
as • I'c�ts, driveways, drive aisles, loading areas, and other vehicular
access, ways, shall be paved with concrete, asphaltic concrete (A. C.), or
other paved street surfacing material in accordance with the Bakersfield
Municipal Code (Sections 15.76.020 and 17.58.060 A.)i
4. Ughting is required for all parking lots, except residential lots with four units or
less (Section '17.58.060 A.). Illumination shall be evenly distributed across the
parking area with, light fixtures designed and arranged so that light is
directed downward and is reflected away from adjacent properties and
streets. Use of glare shields or baffles may be required for glare reduction or
control of back light. No light poles, standards and fixtures, including bases
or pedestals, shall exceed a height of 40 feet above grade. However, ligiht
standards placed less than 50 feet from residentially zoned or designated
property, or from existing residential development, shall not exceed a height
of 11 5 feet. The final buildling plans shall include a picture or diagram of the
light fixtures being used and show how light will be directed onto the parking
area. Please note that staff can require additional adjustments to installed
lighting after occupancy to resolve glare or other lighting problems if they
negatively affect adjacent properties.
5. The developer shall include a copy of a final landscape plan with each set
of the final building plans submitted to the Building Division,. Building permits
will not be issued until the Planning Division has approved the final
landscape plan for consistency with approved site plans, and minimum
ordinance standards (please refer to the landscaping requirements in
Chapter 17.61), Developer shall replace all missing trees in existing planters
per City of Bakersfield landscape standards.
SPRO 13-0154 Page 6 of 9
(NOTE: At the time a final site inspection is conducted, it Is expected that
plants will matchl, the species identified aind be installed in the locations
consistent with the approved', liandscape plan. Changes made without prior
1:�,T , 4 ► TV V&M.Lri 7,-, �AW, 1,77
J& 1=1 01111'EIZ41011�i�JILO�lli�illw*tL*Iif�
6. Business identification signs are neither considered nor approved under this
I
review. A separate sign permit reviewedby the Planning and Building
Divisions and issued by the Building Division, is required for all new signs,
including future use and construction, signs, Signs must comply with the Sign
Ordinance (Chapter 17.6iO • the Bakersfield Municipal Code.)
7. Rooftop areas of commercial buildings (e.g., office, retail, restaurant,
assembly, hotel, hospital, church, school), and industrial buildings adjacent
to residentially zoned properties, shall be completely screened by parapets
or other finished architectural features constructed to a height of the highest
equipment, unfinished structural element or unfinished architectural feature
of the building.
& Refuse collection bin enclosures and container areas are subject to all
required structural setback from street frontages, and shall not reduce any
parkingi, loading or landscaping areas as required by the Zoning, Ordinance,
9. In the event a previously undocumented ofl/gas well is uncovered or
discovered on the project, the developer is respo ble to contact the
Department of Conservation's Division of Oil, Gas, and Geothermal
Resources (DOGGR). The developer is responsible for any remedial
operations on the well required by DOGGIR. The developer shall also be
subject to provisions of BMC Section 6. 80 (B).
10 The developer shall meet all reguilations of the San Joaquin Valley Air
Pollution Control DisMcf (Regulation VM) concerning dust suppression during
construction of the project. Methods include, but are not limited to; use of
water or chemical stabilizer/suppressants to control dust emission from
disturbed area, stock piles, and access ways; covering or wetting materials
that are transported off -site; limit construction- related speed to 15 mph on all
unpaved areas/washing of construction vehicles before they enter public
streets to minimize carryouf/frack out-, and cease grading and earth moving
during periods of high winds (201 mph or more) .
I I Prior to receiving final building or site occupancy, you must contact the
Planning Division (staff contact noted above) for final inspection and
approval of the landscaping, parking lot, lighting and other related site
improvements. Inspections will not be conducted until all required items
have been installed. Any deviations from the approved plans without prior
approval from the Planning Division may result in reconstruction and delays
in obtaining a, building or site occupancy,
SPR# 13-0154 Page 7 of 9
C. FIRE DEPARTMENT (Staff contact - Dave Welrather 661-326-3706)
All access (permanent and temporary) to and around any building under
construction must be at least 20 feet wide, contain no vehicle obstruction,
and be graded to prevent standing water. Barricades must be in place
where ditches and barriers exist in or cross roadways. Emergency vehicle
access must always be reliable.
1 w 1'r I I I
!11117111 1! 111 1111311
I � &
If a grading plan is required by the Building Division, building permits will not
be issued untill the grading plan is approved by both the Public Works
Department and the Building Division,
2, If the project generates industrial waste, it shall be subject to the
requirements of the Industrial Waste Ordinance, An industrial waste permit
must be obtained from the Public Works Department before issuance of the
building permit. To find out what type of waste is considered industrial,
please contact the Wastewater Treatment Superintendent at 661-326-3249.
3. Before any building or site can be occupied, the developer must reconstruct
or repair substandard off-site street improvements that front the site to
adopted city standards as directed by the City Engineer. Please call the
Construction Superintendent at 661-326-3049 to schedule a site inspection to
find out what improvements may be required.
4. A street permit from the Public Works Department shall be obtained before
any work can be done within the public righ,t-of-way (streets, alleys,
easements). Please include a copy of this site plan review decision to the
department at the time you apply for this permit.
5. A transportation impact fee for regional facilities shall be paid at the time a
building permit is issued, or if no building permit is required, before
occupancy of the building: or site. This fee will be based at the rate in effect
at the time the building permit is issued. The Public Works Department will
calculate an estimate of the total fee when you submit construction plans
for the project.
6. The developer shall form a new Maintenance District. Undeveloped parcels
within an existing Maintenance District are required to update Maintenance
District documents. Updated documents, including Proposition 218 Ballot
and Covenant, shall be signed and notarized'. If there are questions,
contact Manny Behl at 661-326-3576,,
7. All storm water generated on the project site, including the street frontage
shall be retained onsite unless otherwise allowed by the Public Works
Department (please contact the Public Works Department - Subdivisions at
661-326-3576) .
T MV I
Collection locations must provide enough containment area for the refuse
that is generated without violating required zoning or setback restrictions
(see Planning Division conditions). Levels of service are based on how often
collection occurs as follows:
Cart service 1 cubic yard /week or less I time per week
Front loader bin services I cubic yard/week - 12 cubic yards/day
Roll-off compactor service More than 1'2 cubic yards/day
2. Show on the final building plans refuse bin enclosures. Each enclosure shall
be designed according to adopted city standard (Detail #ST25 A and B), at
the size checked below P. Before occupancy of the building or s,ite is
allowed, two 3 cubic yard front loading type refuse bin(s) shall be placed
within the required enclosure(s).
D 6'deep x 8'wide (I bin) [I 8'deep x 15'wide (3 bins)
11 8'deep x I O'wide (2 bins) F-1 8" deep x 20'wide (4 bins)
enclosure. If both refuse and recycling containers are to be combined in
the some enclosure area, this area must be expanded in size to
accommodate multiple containers/bins (contact the staff person above for
the appropriate enclosure size).
3. Facilities that require infectious waste services shall obtain approval for
separate infectious waste storage areas from the Kern County Health
Department. In no instances shall the refuse bin area be used for infectious
waste containment purposes.
4. Facilities that require grease containment must provide a storage location
that is separate from the refuse bin location. This shall be shown on the final
building plans.
5. Facilities that participate in recycling operations must provide a location that
is separate from the refuse containment area.
& Facilities with existing refuse service must improve the service location
area(s) to current adopted city standards (in accordance with Detail #ST25
A and B). These improvemenfs shall be clearly shown on the final building
plans.
SPR# 13-0154
Page 9 of 9
7, Relocate the refuse/recycling enclosure to a location that does require
refuse vehicles to back up to exit the facility or to compete with traffic flow.
8. The minimum clearance height for the canopy is 15 feet.
9. The minimum drive aisle width for refuse vehicles, is 15 feet.
N
r +e
I RevuSedSepi.2 ,24 8
opm
d n
w
w
i
r
�
s
N
r +e
I RevuSedSepi.2 ,24 8
opm
d n
w
w
i
r
ICI
d
p
S2
r°
rn
b
ICI
d
p
S2
I
2
-
� <
\� }
<
:
i \ <
...............
/
r � .
�
ƒ
ME