HomeMy WebLinkAbout1300 Stockton StreetCommunity Development Department
Douglas cIsaac, Community Development Director
PhE morns, BuNding Director
Building D[vision
Phone: (661) 326-3720
FAX: (661 i 325-0266
Jr Design Group LLC
1234 Chester Avenue
Bakersfield, CA 93301
R,E: Notice of Decision - Site Plan Review (Project No. 13-01 5i7),
Jfirn Egged, Planning Director
Ranning Division
Phone: (661) 326-3733
FAX: (661) 852-2136
The Planning Director, upon recommendation of the Site Plan Review Committee,
has approved your plans to convert a one-family dwelling to a two-unit apartment
complex in an R-2 (Limited Multiple-Family Dwelling Zone) district at 1300 Stockton Street.
Your proposal, with corrections as noted, meets, the minimum required codes,
policies and standards for development as adopted by the Bakersfield City Council.
Specific items have been identified (see attached Site Plan Compliance List) that you
need to resolve before you can obtain, a building permit or be allowed occupancy.
These items may include changes or additions that need to be shown on the final building
plans, alert you to specific fees, and/or are comments that will help you in complying with
the city's development standards, Each item will note when it is to be completed and
they have been grouped by department so that you know who to contact if you have
questions.
Your next step is to either apply for necessary building permits to construct your
project, or begin your business activities depending on the request submitted. You must
submit final building plans to the Building Division. The Site Plan Review Committee Ml
review these final plans while building plan check occurs to ensure that you satisfy the
items in the Site Plan Compliance List. Please read them carefully. Failure to satisfy an
item may delay your obtaining a building permit or commencing your project.
After construction of your project but before the City can allow occupancy, the
Building Division, must inspect the development to find if it complies with the approved
plans, and any other relevant permits and codes. If you have satisfied 01:1 of the
requirements, the Building Director will issue a certificate of occupancy; of not, the arec
inspector will give you a correction notice. Once you have made all of the corrections,
the Building Director can issue a certificate of occupancy. You may not occupy a
development until the Building Director has issued a certificate of occupancy.
City of Bakersfield * 1 715 Chester Avenue e Bakersfield, California a 9330 1
SPR'd' 13-0157
Page 2 qf8
In consideration by the City of Bakersfield for land use entitlements, including but
not limited to related environmental approvals related to or arising from this project, the
applicant, and/or property owner and/or subdivider ("Applicant" herein) agrees to
indemnify, defend, and hold harmless the City of Bakersfield, its officers, agents,
employees, departments, commissioners and boards (""City " herein) against any and all
liability, claims, actions, causes of actions or demands whatsoever against them, or any of
them, before administrative or judicial tribunals of any kind whatsoever, in any way arising
from, the terms and provisions of this application, including without limitation any CEQA
approval or any related development approvals or conditions whether imposed by the
City, or not, except for City's sole active negligence or willful misconduct.
This indemnification condition does not prevent the Applicant from challenging any
decision by the City related to this project and the obligations of this condition apply
regardless of whether any other permits or entitlements are issued,
The City will promptly notify Applicant of any such claim, action, or proceeding,
failing under this condition within thirty (30) days of actually receiving such claim. The City,
in its sole discretion, shall be allowed to choose the attorney or outside low firm to defend
the City at the sole cost and expense of the Applicant and the City is not obligated to use
any law firm or attorney chosen by another entity or party.
-.11,411Fzigall, 1,41111AltialY I
Any time after site plan approval but before the approval expires you may submit
revisions to the plan. We will treat these revisions as a new site plan application subject to
a new review and required fees. The Planning Director can only approve minor changes
to the original plain without a new application if they are necessary to meet a condition,
mitigation, or result from physical obstacles or other comparable constraints.
MA11111 M1,11 iffegg"IN "AIJEJ121 11
Approval of this site plan expires on April 30, 2015 (2 years from the decision date),
unless building permits have been issued, or on projects not requiringi a building permit,
the use has commenced. The project must be completed within 5 years from the decision
date. If the property is rezoned, site plan approval will expire upon the effective date for
the rezoning unless the use is permitted in the new zone.
The Planning Director may extend the expiration date up to one (1) year if you
resubmit new plains for check against the code requirements in effect at that time and
include a written request for the extension. We must receive this request before expiration
of the project approval. We will not require a fee for this extension request; however,
changes to the plans originally approved for purposes other than code requirements shall
be subject to a new site plan review, including payment of all required fees,
SPRfl 13-0157 Page 3 oJ - 8
This site plan review has been found to be exempt from the provisions of the
California Environmental Quality Act (CEGA) according to Section 1533,2. This project is
exempt because it is an development that is consistent with the general plain, and
zoning regulations, is within an area predominantly developed with urban uses, is not
identified as critical habitat for endangered or threatened species, will not significantly
affect traffic noise, air or water quality, and will be adequately served by appropriate
utilities and public services. A Notice of Exemption has been prepared and is available for
review at the Planning Division (see cover sheet for address).
Any person may appeal this decision. An appeal is limited to whether or not an
adopted development standard, zoning regulation, mitigation, or policy applied or not
applied to the project, was done consistent with the authority granted by city ordinances
or the California Environmental Quallity Act (CEQA). The appeal must be in writing stating
the precise basis or issue as noted, 'include a $700 filing fee, and must be filed within, 10
days of the decision date to the City of Bakersfield Planning Commission (c/o Bakersfield
Planning Director, 1715 Chester Avenue, Bakersfield, CA, 93301)1. The Planning Commission
will hold a public hearing on the appeal and their decision will be final unless their decision
is appealed to the City Council.
Site plan approval is based on the statements made in the application and the
plans you submitted, Any errors or omissions on these plans could alter the compliance list
and/or void this decision. if you have questions about any of the items noted in the Site
Plan Compliance List, you must speak to the contact person representing the department
requiring that item. If you have other questions regarding general information about the
site plan review process, please contact the Planning Division at (661) 326-3733.
Sincerely,
cc: All interested Agencies - For your records,.
rma
S;\BZA SPR\Forms\spr�_data\2013 spr\l 3-01,57,spr,lfr.docx
Ilanninig Director
SPRH 13-0157 Page 4 qt'8
I
RON iiiillillill'' iii
M- TO k � fal I 'I I MIT r; 41M I i I � 1:: 1
An acoustical consultant, approved by the Building Division, shall be
contacted to prepare and include with the final building plans measure that
mifigafe noise exposures for all buildings on the project site that are subject
to noise levels, of 65 db or greater as delineated by the CNEL contour maps
of the city. These implementation measures shall comply with the
requirements of Title 24 of the California Building Code.
2. Buildings or structures shall require installation of an automatic fire sprinkler
system where required by current California Building Code and City
ordinance.
3. Before f he Building Division can allow occupancy of this apartment
complex, they must inspect and approve the placement and colors of the
address numbers identifying each unit and/or building, and on -site
building/unit location maps so that emergency personnel can easily find a
specific unit when responding to the site during an emergency.
4. The Building Division will calculate and collect the appropriate school district
impact fee at the time they issue a building permit.
5. Prior to granting occupancy, the Building Division will verify that a water
meter serving the development is in place. Therefore, it is recommended
that the developer contact the applicable water purveyor to !inquire about
their process for obtaining water service for the development as soon as
possible. To determine who the water purveyor for the development is, you
may contact the City of Bakersfield Waiter Resources Department (1000
Buena Vista Road, Bakersfield, CA, phone: 661-326-371'5).
.PRO 13-01.57 huge) of 8
B. COMM. DEVELOPMENT - PLANNINiG (Staff contact - Paul Hellman 661-326-3733)
— . �.,* pq IV*
use and shall be as follows:
Number Parking Required
Use Of Units Ratio Parking
1-bedroom apartment I I space /unit I space
2-bedroom apartment U 2 spaces/unit 2 siDace
Total Required: 3 spaces
2. Minimum parking stall dimensions shall be' -feet wide by 18-feet long.
Vehicles may hang over landscape areas no moire than 2-1/2 feet provided
required setbacks along street frontages are maintained, and frees and'
shrubs are protected from vehicles.
3. All parking lots, driveways, drive aisles, loading areas, and other vehicular
access ways, shall be paved with concrete, asphaltic concrete (A. C.), or
other paved street surfacing material in accordance with the Bakersfield
Municipal Code (Sections 15.76.020 and 17.58.060 A.).
4. The developer shall include a copy of a final landscape plan with each set
of the final building plans submitted to the Building Division, Building permits
will not be issued until the Planning Division has approved the final
landscape plan for consistency with approved site plans and minimum
ordinance standards (please refer to the landscaping requirements in
Chapter 17,61).
M •
5. A Park Development and Improvement Fee shall be paid at the time of the
building permit being issued. We will base the fee at the rate in effect at the
time the permit is issued. The current fee is $1,716 for each independent
residential unit.
6. Refuse collection bin enclosures and container areas are subject to all
required structural setback from street frontages, and shall not reduce any
parking, loading or landscaping areas as required by the Zoning Ordinance.
7. The developer shall meet all regulations of the Son Joaquin Valley Air
Pollution Control District (Regulation VIII) concerning dust suppression during
construction of the project, Methods include, but are not limited to; use of
water or chemical stabilizer/suppressants to control dust emission from
disturbed area, stock piles, and access ways; covering or wetting materials
VRfi 13-01-5'7 h�ge 6 qf'8
that are transported off-site; limit construction- related speed to 15 mph on all
unpaved areas/washing of construction vehicles before they enter public
streets to minimize carryout/track out, and cease grading and earth moving
during periods of high winds (20 mph or more).
8. Prior to receiving final building or site occupancy, you must contact the
Planning Division (staff contact noted above) for final inspection and
approval of the landscaping, parking l�ot, lighting and other related site
improvements. inspections will not be conducted until all required items
have been installed. Any deviations from the approved plans without prior
approval from the Planning Division may result in reconstruction and delays
in obtaining a building or site occupancy.
U 13ION1111,111MV111111 111 11 MIWY,�M, t
1-1 f"i I
a. All fire hydrants, both offsite (nearest to site) and orb- site. Include flow
data on all hydrants. Hydrants shall be in good working condition
and are subject to testing for verification. Fire flow requirements must
be met prior to construction commencing on the project site. Please
provide 2 sets of the engineered water plans to Dave Weirathier.
(Note: All new fire hydrants must be purchased from the Water
Resources Department.)
b All', fire sorinkler and/or stamp systems, fire alarms and commercial
hood systems. These suppression systems require review and permits
by the Fire Department. The Fire Department will issue guidelines for
these various items as they may apply to this project,
2. All access (permanent and temporary) to andl around any building: under
construction must be at least 20 feet wide, contain no vehicle obstruction,
and be graded to prevent standing water. Barricades must be in place
where ditches and barriers exist in or cross roadways. Emergency vehicle
access must always be reliable.
The developer shall construct curbs, gutters, cross gutters, 5-foot 6-inch wide
sidewalks, and street/alley paving along Niles Street according to adopted
city standards. These improvements shall be shown on the final building
plans, submitted to the Building Division before any building permits will be
issued.
2. The developer shall construct standard handicap ramps at the northwest
corner of Miles Street and Stockton Street according to adopted city
standards. These improvements shall be shown on the final building plans
submitted to the Building Division before any building permits will be issued.
SPR# 13-0157
Page 7 o
3. The developer shall install new connection(s) to the pubilic sewer systemi. This
connection shall be shown on the final building plans submitted to the
Building Division before any building permits will be issued.
4. Show on the final building plans all existing connection(s) to the public sewer
system.
5. All on-site areas required to be paved (ie, parking lots, access drives, loading
areas, etc.) shall consist of concrete, asphaltic concrete (Type B. A. CJ or
other paved street material approved by the City Engineer. Pavement shall
be a minimum thickness of 2 inches over 3 inches of approved base material
(ie. Class 11A. B.) if concrete is used, it shall be a minimum thickness of 4
inches per Municipal Code Section 17.58.060, paragraph A. This paving
standard shall be noted on the final building plans submitted to the Building
Division before any building permits will' be issued.
6. If a grading plan is requiired by the Building Division, building permits will not
be issued until the grading plan is approved by t91 the Public Works
Department and the Building Division.
7. Before any building or site can be occupied, the developer must reconstruct
or repair substandard off-site street improvements that front the site to
adopted city standards as directed by the City Engineer. Please call the
Construction Superintendent at 661-326-3049 to schedule a site inspection to
find out what improvements may be required.
8. A street permit from the Public Works Department shall be obtained before
any work can be clone within the public right-of-way (streets, alleys,
easements). Please include a copy of this site plan review decision to the
department at the time you apply for this permit,
9. A sewer connection fee shall be paid at the time a building permit is issued.
We will base this fee at the rate in effect at the time a building permit is
issued.
10. A transportation impact fee for regional facilities shall be paid at the time a
building permit is issued, or if no building permit is required, before
occupancy of the building or site. This fee will be based at the rate in effect
at the time the building permit is issued. The Public Works Department will
calculate an estimate of the total fee when you submit construction plans,
for the project.
11. The developer shall form a new Maintenance District, Undeveloped parcels
within an existing Maintenance District are required to update Maintenance
District documents. Updated documents, including Proposition 218 Ballot
and Covenant, shall be signed and notarized. If there are questions,
contact Manny Behl at 661-326-357&
SPRO 13-0157
FA
Page 8 qf8
12, All storm water generated on the project site, including the street frontage
shall be retained onsite unless otherwise allowed by the Public Works
Department (Please contact the Public Works Department - Subdivisions at
661-326-3576).
13, This project may be located within a Planned' Sewer Area, Please contact
the Public Works Department - Subdivisions at 661-326-3576 to determine
what fees may apply.
14. This project may be located within a Planned Drainage Area, Please
contact the Public Works Department - Subdivisions at 661-326-3576 to
determine what fees may apply,
Cart service I cubic yard/week or less I time per week
Front loader bin services I cubic yard/week - 12 cubic yards/day
Roll-off compactor service More than 12 cubic yards/day
2. Residential properties with three (3), units or less will be serviced with
automated carts. Every dwelling unit must have its own cart and no more
than three (3) carts will be allowed for each parcel. A screened 3'x 9'
concrete refuse cart storage pad must be provided for carts when they are
not out for collection (this area shall be clearly shown on the final building
plans). The Solid Waste Division will determine where service collection will
occur (street curbside or alley).