OFFICE OF THE CITY MANAGER
May 17, 2013 TO: Honorable Mayor and City Council
FROM: Alan Tandy, City Manager AT
SUBJECT: General Information
Great news – The City has been informed the E-76 for the construction phase of
the Morning Drive Bridge Project was issued this week. The project will construct
a new interchange at State Route 178 and Morning Drive and widen SR 178 to
four lanes for approximately 1.5 miles. The estimated cost of the project is $39.2
million. Bids are expected to advertise in May and a contract be awarded in
July!
Budget News
As part of the 2009 State budget package the legislature passed Proposition
1A, which allowed the State to “borrow” property tax dollars from local
governments to help the State balance its budget. The State borrowed $6.7
million from the City of Bakersfield during the 2009-10 fiscal year.
The law required the borrowed funds to be repaid with interest by June 30,
2013. We have been somewhat skeptical of the State’s promise to repay for
the past couple of years, but it now appears increasingly more likely that they
will make the repayment sometime in June 2013. The repayments are
expected to flow from the State Controller’s Office to the County Auditor
Controllers Office, who would then, in theory, remit the repayment amounts to
the local jurisdictions. It is still unclear at this time as to when the City will
actually be in receipt of these funds.
Due to this being one-time money, it clearly should not be used to fund
ongoing expenses within the General Fund.
As such, staff is proposing the following uses for Council consideration:
1. Facility Replacement Reserve Replenishment: This account is used to
accumulate funds to be used for unanticipated or unbudgeted
projects associated with General Fund assets such as City Hall, Fire
Stations, Police Stations and Recreation Facilities. Since the recession,
General Information May 17, 2013
Page 2
we have reduced the fund balance by $600,630. Staff is
recommending replenishing the reserve by that amount to bring the
balance back to $5 million.
2. PERS Rates Increase Set-aside: PERS rates are expected to increase
approximately 50 percent over the next seven years. While we have
set aside approximately 20 percent of that amount, prudent
financing would increase that reserve.
3. Capital Outlays: Additional funding to fully complete the next phases
of the State Farm Sports Village and the Mesa Marin Sports Complex,
among other projects, should be considered.
Again, we do not have the funds in hand and recommend we do prior to any
final decisions on use!
Miscellaneous News
• Enclosed is a memo regarding the action plan to construct Phase B of the Sister
City Gardens without the need for additional appropriations. Please contact
my office if you have any questions.
• The Recreation and Parks Department has released its 2012 Annual Report. The
enclosed document highlights the many accomplishments and key projects, a
brief overview of department staff, and a glance at the special events that
took place in calendar year 2012. TRIP News
Motorists are advised to anticipate lane closures on Allen Road, between San
Juan Avenue and Vermillion Drive in the vicinity of the Westside Parkway, on
Monday-Friday, May 20-24, 2013. The two outside northbound lanes of Allen
Road will be closed between the hours of 8:30 a.m. and 4 p.m. The inside
northbound lane will remain open to traffic while work is underway.
Southbound lanes will not be impacted. All lanes will reopen in time for the
evening commute. The closures will allow AT&T crews to complete utility work
on the Allen Road Bridge.
General Information May 17, 2013
Page 3
Events
Rabobank Theater
Juanes
Friday, May 17th
8:00 p.m.
Tickets: $30 - $75
Reports
For your information, we enclose the following:
Directed Policing Unit/Gang Violence Report for April 2013; and
Streets Division work schedule for the week of May 20th.
AT:rs:al cc: Department Heads Roberta Gafford, City Clerk
OFFICE OF THE CITY MANAGER
MEMORANDUM
May 17, 2013
TO: Honorable Mayor and City Council
FROM: Alan Tandy, City Manager AT
SUBJECT: Sister City Garden Phase B
________________________________________________________________________________
Background
At the City Council meeting of April 17th an item appeared on the agenda which
proposed to award bids for the Sister City Garden Phase B and to increase the
appropriation for the project because the bids came in higher than the engineers
estimated.
The City Council did not want to increase the budget for the project and the bids
were rejected at the May 1st meeting. However, some members of the elected
body expressed concerns that the project not be downgraded or made to look
inferior to Phase A.
Proposed Solution
Staff and the design consultant have been working to attempt to keep the project
within the original budget and to do so without loss in the quality and integrity of
the original design. I am happy to report that we believe both goals, that is
keeping with the original budget and keeping the integrity of the original design,
can be accomplished. Below is a summary explanation of how that is possible:
1) Staff believes that the bids received were high and that a different approach to a General Contractor bid can reduce costs.
2) We have found another gazebo with very good quality for an estimated
saving of $45,000.
Honorable Mayor and City Council May 17, 2013
Page 2
3) Staff believes savings are possible by:
A) Bidding a work package of about $200,000,
B) Certain concrete, irrigation, and landscaping work would be done under
our annual contracts, which are lower cost than the numbers received
on the rejected bid; and finally
C) City crews would do certain aspects of the work – serving, in effect, as the General Contractor. Central Park, among other projects, was done
this way.
4) Certain project elements would be purchased directly by the City – avoiding
the mark up done by a General Contractor performing the same function.
Again, it is not uncommon for us to do projects this way.
Summary
It is the opinion of staff that the project done on this basis can be delivered as
originally designed with the appropriation currently in place. We estimate
completion in mid-November.
Please let me know if there are questions, concerns, or objections as soon as
possible!
ANNUAL REPORT
2012
[1]
What first-time IT managers really need to know.
We asked 5 accomplished managers the things they would’ve done
differently at the onset of their careers
CONTENTS
DEPARTMENT OVERVIEW pg 2
EXECUTIVE SUMMARY pg 3
ADMINISTRATION DIVISION pg 4-5
PARKS MAINTENANCE DIVISION pg 6-7
RECREATION DIVISION pg 8-9
SPECIAL EVENTS pg 10
[2]
The City of Bakersfield
Recreation & Parks Department is
pleased to publish its 2012 Annual Report.
This report covers the period of January
through December 2012. Financial data is reported on Fiscal Year 2011/12, covering
the period of July 1, 2011 through June 30, 2012.
The department develops and implements quality, value-based facilities and
programs that encourage healthy lifestyles and celebrates the community’s
diversity. The acquisition, construction and maintenance of parks, streetscapes,
open space, and trails are administered by the department. The team focuses on
providing quality recreation, social, and cultural activities for youth, adults, and
families throughout the City of Bakersfield.
Department structure and responsibilities:
The Department is organized into three divisions:Administration:10 full-time staff
Parks*:128 full-time staff
Recreation*:11 full-time staff.Total:149 full-time staff*operates with additional part-time staff
DEPARTMENT OVERVIEW
Our Mission
To enhance the
quality of life
through a variety
of programs, parks
and partnerships.
Our Vision
The City of
Bakersfield
Department of
Recreation and
Parks is recognized
nationally as being
responsive to
community needs
by maintaining
public lands and
providing
recreation
opportunities
Administration Division
Parks Division
Recreation Division
Financial administration and annual budget preparation
Project management for Department and inter-departmental projects
Facility planning, design, and development
Strategic and operations planning
Marketing and special events
Parks, trails, sports fields, right-of-ways, streetscapes, and grounds
maintenance
Technical advisors in horticulture, turf management, urban forestry,
irrigation, athletic field maintenance,open space/native areas, and
weed abatement
Recreation planning, programming and evaluation for all target
populations (sports, aquatics, fitness/wellness, general recreation)
Community center operations, including guest relations and facility
management
Technical advisors in all aspects of community recreation
[3]
Parks77%
Administration
7%
Recreation
16%
Personnel Services
62%
Capital1%
Operating &
Maintenance
38%
EXECUTIVE SUMMARY
A few notes from the Director
At the beginning of each year, the Recreation and Parks
supervisory staff meet for a whole day of strategic planning. This
includes analyzing the previous year’s activities, events and
maintenance issues. We use community feedback to throw out
things that did not work well in the past year, and to improveupon what did work well.
Using our mission statement of enhancing the quality of lifethrough a variety of programs, parks and partnerships, staff isserious about providing opportunities for citizens to have fun.Maintenance crews are out there daily –no matter the weather –providing parks and streetscapes that make Bakersfield a greatplace to live, work and play. Recreation staff provides programsfor a large variety of interests, ages and abilities.
At the end of 2013, the Bakersfield Recreation and ParksDepartment will be the first agency in California to maintain its
accreditation for five years, and to become re-accredited after
five years. In order to achieve national accreditation, staff had to
meet 155 standards of excellence in the field of parks and
recreation. These standards include topics such as organization,
human resources, budgeting, risk management, programming
and planning.
You are welcome to use the information in this annual report to
brag about Bakersfield, and to provide even more reasons to visit
a park today and every day. Enjoy!
Dianne Hoover
The Recreation & Parks Department plays a criticalrole in contributing to the achievement of goalsestablished by the City Council:
Goal #1 –Provide Quality Public Safety Services
Goal #3.1 –Encourage Improvements to theDowntown and Former SoutheastRedevelopment Zone
Goal #3.2 –Pursue Development of the Mill CreekProject
Goal #4.1 –Provide for the Logical Planned
Growth and Development of the City
Goal #6.1 –Improve the Visual Appearance and
Livability of the City
Goal #6.2 –Provide Quality Recreational Facilities
and Programs
Goal #6.3 –Construct New Recreational and
Cultural Facilities
Goal #7.1 –Provide for the Prudent Use of Fiscal
Resources
The Recreation & Parks Department also challengesitself with Action Plans developed at the beginning ofeach fiscal year. Some of the plans for FY 2012/13include:
Installing scoreboards at the Mesa Marin SportsComplex
Resurfacing the gym floor at the Dr. Martin Luther
King, Jr. Center
Accomplishing Re-Accreditation filing through
CAPRA
Programming Uplands of the Kern River Parkway
Aggressively pursue local, state, and federal
grants
Continue training and certifying additional staff in
playground inspections and the MaxiCom
irrigation system for Parks
FY 2012 Expenditures by Division
2010 2011 2012
Total Revenue 1,025,998$1,044,016$959,474$
MD Collections 5,142,878$5,055,278$5,420,817$
Expenditures
Administration 1,050,396$1,077,383$1,090,032$
Parks 11,344,487$11,902,857$12,599,217$
Recreation 2,433,685$2,479,429$2,577,013$
Total Expenditures 14,828,568$15,459,669$16,266,262$
% Change -6.2%4.1%5%
Dept. Cost Recovery 41.6%39.5%39.2%
Fiscal Year Ending June 30,
[4]
ADMINISTRATION
2012 HIGHLIGHTS
Service Highlights
Council Reports
Utilize an annual tree contract to address the City’sovergrown trees
Resolutions: Healthy Eating, Active Living (HEAL) CitiesCampaign, July is Recreation & Parks month
Partner with Community Action Partnership of Kern for thedesign and construction of a multi-use sports field locatedat the Friendship House Community Center
Annual Compliance report for Park Impact Fees available tothe public
Agreement with Kern High School District for the use of
aquatic facilities for practice and swim meets
Naming Rights Agreement: State Farm Sports Village
License Agreements: Golden Empire Youth Football useof Sports Village Phase II –4 fields; American YouthSoccer Association (AYSO) use of Sports Village Phase II –4 fields
Major Contributions: Movies in the Park from San JoaquinCommunity Hospital; Fitness Equipment from AceHydraulic, Inc; Escape School Event from SouthernCalifornia Gas Company
Key Projects
Bicycle/Pedestrian Connection –worked with other Citydepartments to add a new bicycle/pedestrianconnection at Mohawk and Truxtun to the Kern River Trail
City in the Hills –collaborated with City in the Hills HOA to
redesign and complete the layout and use of topographyto be aligned with native plants
Sister City Gardens, Phase I (pictured)–partnered with
Public Works and community representatives for the
design and construction
State Farm Sports Village –Successfully negotiated a five(5) year $500,000 naming rights agreement with StateFarm; funded construction of Phase II; entered into
maintenance agreements with Golden Empire Youth
Football and American Youth Soccer Organization for the
use and maintenance of the facility
FY 2012 & 2013 Budgets –Administered the budget
process and managed expenditure of funds from the
General Fund for FY 2012; Compiled and presented FY
2013 Operating Budget for the Recreation and Parks
Department
Marketing –updated and enhanced department
website and brochure to be more user-friendly for
customers
Litter Campaign –worked with Solid Waste Department,Keep Bakersfield Beautiful and other interested groups to
promoted “Litter: It’s Beneath Us”
[5]
ADMINISTRATION
2012 HIGHLIGHTS
Our People
The Administration Division implements actions to provide for the professionaldevelopment of our people and establish positive morale in the Department.In 2012, these actions included:
Conducted weekly senior staff meetings, weekly Parks Supervisorsmeetings, Supervisor staff meetings days following City CouncilMeetings, monthly Safety Meetings, monthly Recreation SupervisorMeetings, monthly Support Staff Meetings, and an Annual DepartmentalRetreat
Attended California Parks & Recreation Society Conference andNational Recreation & Parks Association Congress
Provided training opportunities for administrative staff that included MSExcel, management/supervisory training, and SunGard Naviline HTEaccounting system
Served on the following boards: Region 3 Representative on State Board
of Directors for California Parks & Recreation Society and ProgramSelection Committee for 2013 National Recreation & Parks AssociationConference
Certifications Held: Certified Parks and Recreation Executive, Certified
Park and Recreation Professional, Certified Playground Safety Inspector,
Certified Sports Field Manager, and Certified Public Accountant
[6]
PARKS
2012 HIGHLIGHTS
Service Highlights
Administrative
Assisted fencing for community garden on 4th & Eye St
Prepared aesthetics of roads for Amgen Tour 2012
Prepared The Park at River Walk for the July 4th
Celebration
Ace Hydraulic funded replacement of exercise
equipment along Truxtun Extension
Received “Best Park for 2012” from The Bakersfield
Californian for: The Park at River Walk & Central Park
Completed 87% (2,994) of all Work Order requests
Applied 3 miles worth of Dolomite Chalk to foul lines at
City softball fields
Extended infields to 70’, meeting new ASA requirements
Installed an acid injection system at the State Farm Sports
Village
Assisted South West Baseball League with grand opening:
General Services re-lamped all parking lot lights and
painted curbs red,Parks staff planted shrubs in parking
lot planters, and coordinated for street sweeping with
Streets
Athletic Fields
Irrigation Trees
Tested 635 siphons
Maxicom irrigation system connected to Wayside &
Greystone Parks
Reviewed current meter use, and reduced expenses by
$60,000
Received Tree City USA for 14th consecutive year
Assisted tree plantings for the Great American Clean-up
Collaborated with the Streets Department for safety
pruning on City right-of-ways and alleys
Collaborated with 70 volunteers to plant 102 trees along
Truxtun/Mohawk & River Lakes/Hageman
Trimmed 4,485 trees
Removed 547 trees
Horticulture Playgrounds
Planted over 510 trees and 12,300 shrubs throughout City
Applied chemical for tumble weed control at Calloway Rd
& Seventh Standard Rd per Council Referral
Increased squirrel abatement using an annual contract
with Oxley’s Pest Control (Rodenator)
2.25 acres added to maintenance schedule
1,104 loads of green waste collected
Completed installation of a small tot lot at Greystone Park
Replaced the exercise equipment along Truxtun Extension
Performed daily observations of City playgrounds
Replaced tot lot at Pin Oak Park
[7]
PARKS
2012 HIGHLIGHTS
Key Projects –Parks & Planning
Resurfaced seven (7) City tennis courts
Installed shade structures over playground equipment
at four (4) different parks
Replaced gym bleachers at the Dr. Martin Luther King,
Jr. Community Center
Partnered with Public Works and community
representatives for the design and construction of Mill
Creek Sister Cities, Phase I
Replacement of exercise equipment along the Truxtun
Ave extension funded by Ace Hydraulic’s donation
Opened the City’s first 100% ADA accessible
playground for children of all disabilities at Central
Park at Mill Creek
Our People
In 2012, there were several accomplishments in the Parks
section. Frank Thomas and Manuel Escudero passed the
“Backflow Tester” exam. Ken Trone completed and passed
recertification for the Certified Playground Safety Inspector
Actions taken to support the professional development of
the Parks team included attendance to several
conferences and training opportunities:
National Recreation & Parks Association Congress
California Parks & Recreation Society Annual
Conference
Annual Pesticide Training
Annual Railroad Safety Training
Maxi-Com Software Training
Asbestos Training
Smithco Sweeping & Turf Sweeper Training
Monthly Safety Meetings
[8]
The focus for the Recreation Division
during the year was to provide quality recreational
services for the Bakersfield community. Significant efforts were made to attract
sponsorships and to recruit volunteers for recreation programs. During FY 2012,
the Recreation Division was assisted by 472 volunteers who contributed 2,243hours. According to data from the Bureau of Labor Statistics, the value of volunteerlabor in California (as of 2012) is $24.18. This Translates to $54,236 in value contributedby our volunteers in FY 2012.
RECREATION
2012 HIGHLIGHTS
Service Highlights
Administrative
Contracted with approximately 20 outside instructorsand contractors to provide various programs andactivities such as Zumba, Basketball, Hockey, IndoorSoccer, Dog Obedience, and Bicycling
Contracted with over 30 umpires for adult SoftballLeague
Provided for the routine maintenance of pools throughstaff and utilized an outside vendor for periodic repairs
Worked with Connors Concessions for the operationsof the Mesa Marin Sports Complex concession toensure food was made available for sale duringSoftball League and Tournament play
Worked with Nishikawa Property Maintenance for themaintenance of the Mesa Marin Sports Complex fieldsto ensure top of the line softball fields during Softball
League and Tournament play
Marketing
Produced 3 seasonal program guides
(91,080 copies plus on-line version)
Created hundreds of programs flyers and schedules
Created focus on new web domain
www.bakersfieldparks.us and generated over 30,000
hits
Produced handout of sponsorship and advertising
opportunities for 2012
Aquatics
Aquatics programming included: swimming lessons foradults and children, aqua conditioning, water walking,lifeguard training classes, open swim, lap swimming,and 100 mile club (in 2012, a combined 110,660 miles!)
Special Events included: Polar Bear Plunge,Eggstravaganza, Spring Splash, Family Fun Nights,Float-In-Movie, and South Yosemite League SwimmingChampionships
Sponsors, Grants & Partnerships: USA Swimmingawarded $4,792 to the Make-A-Splash program,
BCMEMBA sponsored the 2012 Float-In-Movies, and
volunteers/in-kind donations were received with a
value of $8,000.
Make-A-Splash: First 5 Kern funded $62,463 for this
drowning prevention program. Over 650 childrenreceived swim lessons at a discounted rate of $5,over 6,600 children and their parents enjoyed freefamily swim at City pools, and 4,076 pre-school agedchildren participated in American Red Cross watersafety presentations.
Attendance: aquatic program attendance totalednearly 140,000 visitors in 2012. Looking back, annualattendance has increased by 73% (or 59,223 visitors)as compared to 2006!
[9]
RECREATION
2012 HIGHLIGHTS
Programs
SportsProgramming included a variety of youth and adult sports thatattracted 21,066 participants, an overall 91% increase inparticipation over 2011! Increase reflects the popularity of theAdult Softball League, tournaments at the Mesa Marin SportsComplex, League of Dreams, Adaptive Softball League, T-Balland Pee Wee Leagues, and Fitness Special Events.
Highlights for the year include:
Adult Softball League: the Mesa Marin Sports Complex
allowed 518 teams to register –68 more than 2011. Kern
Trophies donated 174 trophies, valued at $6,090.
Softball Rentals at the Mesa Marin Sports Complex: the
popularity of the facility attracted 22 tournaments with 527
teams.Regional, State, and National tournaments are
expected in 2013.
T-Ball & Pee Wee Leagues: community support poured in
with sponsored uniforms, banners, water bottles,
photography, volunteer coaches for a combined value of
nearly $5,000.
Contracted Classes: offered a variety of sports classes and
camps through developed partnerships with private
instructors and coaches. Total participants reached just
over 300.
Adaptive Programs: just over 500 participants enjoyed
adaptive programs, ranging from Youth Tennis, Ice Skating,Adult Softball, T-Ball, and Basketball.
Community Center ServicesDr. Martin Luther King, Jr. Community Center:
Build-A-Bike: partnering with Bakersfield PD and Snyder’sCyclery for bikes and parts, the program received theAward of Excellence from CPRS for Serving theUnderserved. Attendance again neared 1,300.
Camp King: this popular program reached its maxregistration during the summer. Free lunches were providedin collaboration with the Bakersfield City School District.
Good Neighbor Festival: over 50 agencies held boothsdistributing information on health care, careerdevelopment, gang prevention, and counseling services.
Springtime Egg Hunt: in collaboration with Stay Focused
Ministries, 800 children enjoyed the egg hunt, toys and
prizes.
Healthy Eating Class/Children’s Garden (covered under
Fitness & Wellness)
Silver Creek Community Center:
After School Program: enriching and educational activities
were enjoyed by 2,408 participants
Camp Fun: during the summer, 2,525 children learned new
skills and developed their talents with events such as
theatre production, cooking, sports, and swimming.
Silver Creek Community Center (cont.)
Music Fest 2012: held on Tuesday nights during June&July, six live bands performed for the localcommunity. Nearly 3,000 guests attended in acomfortable picnic-like setting.
Programming in 2012 included fitness and wellness
classes and events. Feedback was favorable and many
new programs were added to satisfy demand.
Run/Walk: the Department held the Cross Country
Meet and hosted the St Patrick’s Day 5k. In
collaboration with CSUB, the Department also
participated in the Valentine’s Day Run for Your
Heart and Celebrate CSUB Alumni 5k.
Quality of Life: in its 1st annual debut, two
presentations were delivered by a CSUB professor to
discuss overweight and obesity and how this trend
can change through physical activity.Healthy Eating Class/Children’s Garden: participants
learned healthy eating, growing their own produce,
and cooking healthy meals. Ruby Harris, theinstructor, won a Beautiful Bakersfield award for herservice and dedication to the program.
Actions taken to support the professional developmentof the team included attendance at severalconferences and training opportunities:
National Parks & Recreation Association Conference
National Parks & Recreation Association’s Aquatic
Management School
California Parks & Recreation Society Annual
Conference
California Parks and Recreation Division District 15
Board Members, Aquatic Section Representative, &
Secretary
California Aquatic Management School
California Code of Regulations Title 22 Program
CPR & AED Certification
Renewed American Red Cross Certifications in Water
Safety Instructor Trainer, Lifeguarding/Water Park
Instructor Trainer, Emergency Medical Response
Instructor Trainer
Maintained certification as a Certified Pool/SpaOperator
Fitness & Wellness
Our People
[10]
KRAB Free For All 5,000 KRAB 106.1 Radio presented its 5th free live concert at the Bright House NetworksAmphitheatre where five different bands performed for the community.
Great American
Cleanup 8,000 Keep America Beautiful’s national volunteer cleanup day organized by Keep Bakersfield
Beautiful
Back 2 School 4,000 Kern County Child Support’s annual event to provide backpacks, school supplies, and
haircuts to children returning to school
The 4th at River
Walk Concert 500 Sponsored by the City, the 1st Annual July 4th free concert at the Bright House Networks
Amphitheatre showcased five local bands
Gospel Fest 4,000 San Joaquin Community Hospital sponsored its 4th free annual Gospel Fest; several bands
and music artists performed religious themed music. The headline band was Sanctus Real
Beale BandConcerts 1,400
The concert series have been a tradition in Bakersfield for over 70 years! Members from
the Bakersfield Symphony Orchestra held free performances each Sunday during the
month of June.
Third Thursdays 7,500 From April –August, the Downtown Business Association hosted businesses, vendors, and
entertainers in Central Park at Mill Creek on the third Thursday of each month
Movies in the
Park Series 2.350 Sponsored by San Joaquin Community Hospital, family-friendly movie entertainment was
delivered to various neighborhood parks during the summer
Willie Nelson &
Family Concert 2,395 One of the most notable performers to have appeared on the Bright House Networks
Amphitheatre stage to date
Howling at theMoon Walk/Run 1,000 An annual event sponsored by the Bakersfield Police Department’s K-9 Unit
Music Fest 2012 2,955 Free summer concert series with five local bands at Silver Creek Park
Polar BearPlunge 355 7th Annual event at the McMurtrey Aquatic Center where participants welcome the newyear by plunging into an icy cold pool
SPECIAL EVENTS
BAKERSFIELD POLICEBAKERSFIELD POLICEBAKERSFIELD POLICEBAKERSFIELD POLICE
MEMORANDUMMEMORANDUMMEMORANDUMMEMORANDUM
Date: May 14, 2013
To: Alan Tandy, City Manager
From: Greg Williamson, Chief of Police
Subject: Directed Policing Unit/Gang Violence Report
I have enclosed the Directed Policing Unit’s monthly gang statistics report for April, 2013.
Please call if you have any questions.
GSW/vrf
BAKERSFIELD POLICE DEPARTMENT SPECIAL ENFORCEMENT UNIT MONTHLY REPORT – APRIL 2013
Special Enforcement Unit Monthly Stats for April 2013
Year to Date Special Enforcement Unit Statistics January – April 2013
309 Felony Arrests 600 FI’s 31 Search Warrants
120 Misdemeanor Arrests 73 Citations 167 Court Prep - Hours
81 Felony Warrant
Arrests 2286 Probation and
Parole Searches 108 Community
Contacts
152 Misdemeanor
Warrant Arrests 35 Hrs. Assisting Other
Department Sections 20 Project Logs Hours
Worked
23 AB109 Arrests –
186.22 224 Supplemental
Reports 232 Hours Assisting
Patrol
9 AB109 Arrests - Other 294 General Offense
Reports 336 Hours Assisting
Investigations
5 Hours In Training 47 Vehicle Reports 26
19
9
27
2013 Shootings
2012 Shootings
2011 Shootings
2010 Shootings 76 Guns Seized 378 Patrol Call Response
85 Felony Arrests 155 FI’s 5 Search Warrants
24 Misdemeanor Arrests 13 Citations 35 Court Prep - Hours
19 Felony Warrant
Arrests 192 Probation and
Parole Searches 25 Community
Contacts
34 Misdemeanor
Warrant Arrests 21 Hrs. Assisting Other
Department Sections 0 Project Logs Hours
Worked
5 AB109 Arrests – 186.22 57 Supplemental
Reports 138 Hours Assisting
Patrol
5 AB109 Arrests - Other 81 General Offense
Reports 48 Hours Assisting
Investigations
0 Hours In Training 9 Vehicle Reports 2
7
2
10
2013 Shootings
2012 Shootings
2011 Shootings
2010 Shootings 26 Guns Seized 92 Patrol Call Response
BAKERSFIELD POLICE DEPARTMENT SPECIAL ENFORCEMENT UNIT MONTHLY REPORT – APRIL 2013
APRIL 2012-2013 COMPARISON
0
10
20
30
40
50
60
70
80
90
100
110
Felony Arrests MisdemeanorArrests Guns Seized SearchWarrants
82 78
6 0
104
58
26
5
2012 2013
0
75
150
225
300
375
450
525
600
675
750
Assisting OtherDepartments (IncludingInvestigations)
Probation / ParoleSearches Field Interviews / StreetChecks
710
496
247 207
492
155
2012 2013
BAKERSFIELD POLICE DEPARTMENT SPECIAL ENFORCEMENT UNIT MONTHLY REPORT – APRIL 2013
2011-2013 YEAR TO DATE COMPARISON
0
200
400
600
800
1000
1200
1400
1600
1800
2000
2200
2400
2600
Probation / ParoleSearches Assisting OtherDepartments (IncludingInvestigations)
Field Interviews / StreetChecks
1871
1598
933
1747 1765
872
2286
703 600
2011 2012 2013
0
50
100
150
200
250
300
350
400
450
500
550
600
650
700
Arrests Guns Seized Search Warrants
465
61 31
432
24 11
662
76
31
2011 2012 2013
BAKERSFIELD POLICE DEPARTMENT SPECIAL ENFORCEMENT UNIT MONTHLY REPORT – APRIL 2013
9
19
26
4 4
8
0
4
8
12
16
20
24
2011 2012 2013
SHOOTINGS HOMICIDES*
YEAR TO DATE GANG VIOLENCE INDEX 2011-2013
*Please note that the homicide stats include all gang related homicides, including but not limited to
shootings and stabbings.
BAKERSFIELD POLICE DEPARTMENT SPECIAL ENFORCEMENT UNIT MONTHLY REPORT – APRIL 2013
GANG RELATED SHOOTINGS – 2011-2013 (YEAR TO DATE ONLY)
0
1
6
2 2
4
5
4
3
7
6 6
13
7
4
2
0
2
4
6
8
10
12
14
JAN.FEB.MAR.APR.MAY JUN.
2011 2012 2013
BAKERSFIELD POLICE DEPARTMENT SPECIAL ENFORCEMENT UNIT MONTHLY REPORT – APRIL 2013
GANG RELATED SHOOTINGS COMPARED TO THE AVERAGE OF THE PREVIOUS 5 YEARS – PER WEEK
0
1
2
3
4
5
6
7
8
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52
2012
2012 Weekly Numbers Previous 5 Years (2007-2011) Average
Wi
n
t
e
r
B
r
e
a
k
Sp
r
i
n
g
B
r
e
a
k
Su
m
m
e
r
B
r
e
a
k
Sc
h
o
o
l
R
e
s
u
m
e
s
La
b
o
r
D
a
y
Wi
n
t
e
r
B
r
e
a
k
0
1
2
3
4
5
6
7
8
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53
2013
2013 Weekly Numbers Previous 5 Years (2008-2012) Average
Wi
n
t
e
r
B
r
e
a
k
Sp
r
i
n
g
B
r
e
a
k
Su
m
m
e
r
Br
e
a
k
Sc
h
o
o
l
R
e
s
u
m
e
s
La
b
o
r
D
a
y
Wi
n
t
e
r
B
r
e
a
k
BAKERSFIELD POLICE DEPARTMENT SPECIAL ENFORCEMENT UNIT MONTHLY REPORT – APRIL 2013
0
1
2
3
4
5
6
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Nu
m
b
e
r
o
f
S
h
o
o
t
i
n
g
s
2010 - 2013 Shooting Comparison to date
2010 Weekly Numbers 2011 Weekly Numbers 2012 Weekly Numbers 2013 Weekly Numbers
Wi
n
t
e
r
B
r
e
a
k
Week of the Year
Sp
r
i
n
g
B
r
e
a
k
Week of May 20_2013_Work Schedule
Page 1 of 2
STREETS DIVISION – WORK SCHEDULE
Week of May 20, 2013 – May 24, 2013
Resurfacing/Reconstructing streets in the following areas:
Reconstructing various streets in the area east of Buck Owens Blvd. and north of Select Ave Sealing streets in the area east of Union Ave and North of Brundage Ln
Reconstructing Ardmore St between Akers Rd and Stine Rd
Preparing various streets in the area south of E. California Ave and west of MLK Blvd for reconstruction (HUD funded area)
Preparing various streets in the area south of Palm Ave and west of “H” St for reconstruction (HUD
funded area) Miscellaneous Streets Division projects:
Construction of spray pad at Siemon Park
Video inspection of City owned Sewer & Storm lines to evaluate condition of pipes
Miscellaneous concrete repairs throughout the city
Installing handicap ramps on Beale Ave between Monterey and Bernard St prior to CIP project Building temporary parking lot at north end of Sports Village phase 2 using asphalt grindings
Concrete work in the area north of Flower St and east of Alta Vista (HUD funded area)
Asphalt repair on Stine Rd south of Panama at sewer cave-in
NOTE: If raining, there will be no street sweeping service and all street cleaning personnel will be
assigned to cleaning plugged drains and part circle culverts. This also applies when a large number of
street sweeper are in Fleet for repairs. Areas that have been missed during this time will be swept at the
end of the month.
THIS SPACE INTENTIONALLY LEFT BLANK
Week of May 20_2013_Work Schedule
Page 2 of 2 STREETS SWEEPING SCHEDULE
Monday, May 20, 2013
City areas between 99 Hwy. & Stine Rd. – Panama Ln. & Taft Hwy.
Tuesday, May 21, 2013 Between Panama Lane & Woodmere Dr. – Ashe Rd. & Stine Rd.
Between District Blvd. & Panama Ln. -- Gosford Rd. & Ashe Rd.
Between Akers Rd. & Phyllis St. – Harris Rd. & Panama Ln.
City areas between Akers Rd. & Stine Rd. – Harris Rd. & Panama Ln.
Cul-De-Sacs on the north side of Angela Wy., between Manely Ct. & Cris Ct. Between Oswell Park Dr. & Brundage Ln. – Oswell St. & Leeta St.
Wednesday, May 22, 2013
City areas between Snow Rd. & Rosedale Hwy. – Jewetta Ave., west to the City limit. Between Ming Ave. & So. Laurelglen Blvd. – Coffee Rd. & El Portal / Laurelglen Blvd.
Thursday, May 23, 2013
Between Snow Rd. & Olive Dr. – Jewetta Ave., east to the canal boundary. Between Olive Dr. & Hageman Rd. – Jewetta Ave. & Calloway Dr.
Between Niles St. & Sumner St. – Union Avenue & Beale Ave.
Between Sumner St. & E. Truxtun Ave. – Beale Ave. & Brown St.
Between Brundage Ln. & E. Belle Terrace St. – Union Ave. & Kincaid St.
Between Camino Media & Kroll Wy. – Coffee Rd., west to the PG&E easement. Friday, May 24, 2013
Between Etchart Rd. & Pavilion Dr. -- Calloway Dr., west to the canal boundary.
Between Norris Rd. & Olive Dr. – Calloway Dr. & Coffee Rd. Between Olive Dr. & Noriega Rd. – Calloway Dr. & Verdugo Ln.
City areas between Coffee Rd./Riverlakes ext. & Allen Rd. – Hageman Rd. & Rosedale Hwy.
City areas between Pacheco Rd. & Harris Rd. – Stine Rd. & Wible Rd.